Carrie Shores
- Listed as
- architect
- Firm
- Larson Shores Architecture
- Based in
- Oakland
- On San Francisco permits
- May 2015 to Apr 2026
9 permits since 2000 (architect on 9 permits): 5 completed, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 13, 2026 | Completed final sign-off Aug 2026 | 4179 26th St | Armour Construction | revision 202508062456- deferred roof truss calculationsDetails
revision 202508062456- deferred roof truss calculations | |
| Aug 26, 2025 | Completed final sign-off Aug 2026 | 4179 26th St | Armour Construction | new exit passageway through the (e) home in front for new rear yard adu. may share the same drawing of adu pa# 202508062456.Details
new exit passageway through the (e) home in front for new rear yard adu. may share the same drawing of adu pa# 202508062456. | $15,000 |
| Aug 26, 2025 | Completed final sign-off Aug 2026 | 4179 26th St | Armour Construction | to erect 1 story, no basement, type v-b, detached adu. 02 sep '25 - travels with p/a: 2025-0815-3192. efm.Details
to erect 1 story, no basement, type v-b, detached adu. 02 sep '25 - travels with p/a: 2025-0815-3192. efm. | $150,000 |
| Dec 6, 2019 | Completed final sign-off Oct 2021 | 18 Beaver St | Interior Renovations/Sf Renovations | remodeling (e) kitchen & bathroom by changing the layouts, adding a new mini bar area, new windows, to the light well, replacing (e) windows in kind, new fireplace & minor roof work based on new venting, some electrical work, no change on existing floor area. no structural & landing wall.Details
remodeling (e) kitchen & bathroom by changing the layouts, adding a new mini bar area, new windows, to the light well, replacing (e) windows in kind, new fireplace & minor roof work based on new venting, some electrical work, no change on existing floor area. no structural & landing wall. | $75,000 |
| Jun 29, 2018 | Expired or cancelled cancelled Jan 2026 | 1154 Stanyan St | interior renovation of existing kitchen, adding new stairs from 1st fl to 2nd fl, revised room layout, (n) laundry & (n) utility/garbage room. associated structural improvements to existing framing. add new windows and skylights. all windows aluminum wood clad.Details
interior renovation of existing kitchen, adding new stairs from 1st fl to 2nd fl, revised room layout, (n) laundry & (n) utility/garbage room. associated structural improvements to existing framing. add new windows and skylights. all windows aluminum wood clad. | $225,000 | |
| Feb 16, 2018 | Never finaled issued May 2019, no final | 170 Commonwealth Av | Northington Innovations Inc | conversion of existing garage into new accessory dwelling unit per ordinance 162-17Details
conversion of existing garage into new accessory dwelling unit per ordinance 162-17 | $75,000 |
| Jul 12, 2016 | Never finaled issued Sep 2016, no final | 360 Fillmore St | Silao Genereal Engineering Inc | unit 4, revision to pa 2015-0513-6185 - remodel bath & kitchen, replace window with glass door in existing opening.Details
unit 4, revision to pa 2015-0513-6185 - remodel bath & kitchen, replace window with glass door in existing opening. | $40,000 |
| Sep 16, 2015 | Completed final sign-off Dec 2016 | 54 Thor Av | True Line Construction | remodel of kitchen, living/dining room, bath,bedroom & new rear deck.new windows and doors on rear of house. deck and stairs less than 10' from grade. no work visible from street.Details
remodel of kitchen, living/dining room, bath,bedroom & new rear deck.new windows and doors on rear of house. deck and stairs less than 10' from grade. no work visible from street. | $100,000 |
| May 13, 2015 | Never finaled issued May 2016, no final | 360 Fillmore St | Silao Genereal Engineering Inc | working at unit 4. legalize extg 1st floor dwelling unit as unit 4: fire rated occupancy separation, add heater, add street tree if possible, modify sprinkler system, add bike parking space. life safety deferred.Details
working at unit 4. legalize extg 1st floor dwelling unit as unit 4: fire rated occupancy separation, add heater, add street tree if possible, modify sprinkler system, add bike parking space. life safety deferred. | $10,000 |