Tuan Truong
- Listed as
- architect
- Based in
- Hayward
- On San Francisco permits
- Jul 2013 to Feb 2024
8 permits since 2000 (architect on 8 permits): 6 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 9, 2024 | Completed final sign-off Sep 2025 | 1940 Broadway | Tom Lewis Restoration And Consulting | at front south elevation, remove and replace (e) water table/cornice at 4th floor, to match (e) at north and east and west rear elevation repair concrete parapet wall.Details
at front south elevation, remove and replace (e) water table/cornice at 4th floor, to match (e) at north and east and west rear elevation repair concrete parapet wall. | $500,000 |
| Oct 4, 2022 | Completed final sign-off May 2023 | 100 Walnut St | Tom Lewis Restoration And Consulting | remove and rebuild dry rot damaged staircases (2) with new structure and treads & risers (wood & brick) including new patio structure (concrete)Details
remove and rebuild dry rot damaged staircases (2) with new structure and treads & risers (wood & brick) including new patio structure (concrete) | $140,000 |
| Aug 27, 2021 | Completed final sign-off Oct 2021 | 2121 Sacramento St | to partially comply with nov 202178979. replace existing 134 double hung windows with new double hung vinyl clad windows at 3 rear elevations, east, south and west.Details
to partially comply with nov 202178979. replace existing 134 double hung windows with new double hung vinyl clad windows at 3 rear elevations, east, south and west. | $92,291 | |
| Feb 18, 2021 | Completed final sign-off Dec 2021 | 640 09th Av | Kenneth Smith | construction of (n) stairs in rear of building to replace the (e) that was red tagged by dbi for disrepair & unsafe condition. the rear stair is a required secondary exit for the apts & this permit needs to be expedited per the inspector dominic keane'sDetails
construction of (n) stairs in rear of building to replace the (e) that was red tagged by dbi for disrepair & unsafe condition. the rear stair is a required secondary exit for the apts & this permit needs to be expedited per the inspector dominic keane's | $50,000 |
| Mar 18, 2019 | Completed final sign-off Oct 2019 | 1582 Fulton St | Kenneth Smith | rebuilding deck stairs to provide 3ft setbacks at rear(north) & side (west) per residential design advisory team reviewDetails
rebuilding deck stairs to provide 3ft setbacks at rear(north) & side (west) per residential design advisory team review | $10,000 |
| Dec 14, 2016 | Completed final sign-off Apr 2018 | 626 29th St | unit legalization per ordinance# 43-14. legalize kitchen - mep work. washer/dryer hook up. outdoor./mep. drainage for recycled water.Details
unit legalization per ordinance# 43-14. legalize kitchen - mep work. washer/dryer hook up. outdoor./mep. drainage for recycled water. | $35,000 | |
| Jul 9, 2013 | Never finaled issued Oct 2013, no final | 2100 Pacific Av | Tom Lewis Restoration And Consulting | install davit life system to existing building for exterior maintenance purposes.Details
install davit life system to existing building for exterior maintenance purposes. | $170,000 |
| Jul 9, 2013 | Expired or cancelled expired Sep 2017 | 88 Townsend St | Tom Lewis Restoration And Consulting | selective demo of plaster at west elevation, one plaster fdsrom ground to cornice, 2 stories to determine causes of damage over historic brick.Details
selective demo of plaster at west elevation, one plaster fdsrom ground to cornice, 2 stories to determine causes of damage over historic brick. | $17,500 |