2 permits since 2000 (engineer on 2 permits): 1 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 10, 2021 | Completed final sign-off Dec 2025 | 1500 Polk St | Profound Systems Inc. | scope of work is to bring the building entrance up to code with s.f.'s disabled building entrance(sf abe)program.this includes replacing existing sidewalk at primary building entrance.install high/low automatic door actuators at existing exterior doors.replace door hardware at exterior side door.Details
scope of work is to bring the building entrance up to code with s.f.'s disabled building entrance(sf abe)program.this includes replacing existing sidewalk at primary building entrance.install high/low automatic door actuators at existing exterior doors.replace door hardware at exterior side door. | $38,000 |
| Apr 30, 2021 | In progress issued May 2026 | 98 West Portal Av | Profound Systems Inc. | bring bldg entrance up to code accordance to disabled bldg entrance (sf abe) program. replace (e) sidewalk, steps, ramp & handrail. install high/low automatic door actuators @ (e) exterior doors. replace door hardware @ exterior main entry/exit door. relocate (e) walk-up atm & after-hour depositoryDetails
bring bldg entrance up to code accordance to disabled bldg entrance (sf abe) program. replace (e) sidewalk, steps, ramp & handrail. install high/low automatic door actuators @ (e) exterior doors. replace door hardware @ exterior main entry/exit door. relocate (e) walk-up atm & after-hour depository | $262,441 |