Matthew Miller
- License
- C36280
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C36280 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Core States Group
- Based in
- Ontario
- On San Francisco permits
- Feb 2019 to Jun 2026
4 permits since 2000 (architect on 3 permits, engineer on 1 permit): 1 completed, 2 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Profound Systems Inc. (2)
- Architects
- Patrick Blees
- Engineers
- Travis Vincent (2)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 25, 2026 | In progress filed Jun 2026, not yet issued | 3110 California St | level 2 ev chargers, installation of five (5) tesla universal wall connector(s),in a parking garage.Details
level 2 ev chargers, installation of five (5) tesla universal wall connector(s),in a parking garage. | $43,335 | |
| Sep 10, 2021 | Completed final sign-off Dec 2025 | 1500 Polk St | Profound Systems Inc. | scope of work is to bring the building entrance up to code with s.f.'s disabled building entrance(sf abe)program.this includes replacing existing sidewalk at primary building entrance.install high/low automatic door actuators at existing exterior doors.replace door hardware at exterior side door.Details
scope of work is to bring the building entrance up to code with s.f.'s disabled building entrance(sf abe)program.this includes replacing existing sidewalk at primary building entrance.install high/low automatic door actuators at existing exterior doors.replace door hardware at exterior side door. | $38,000 |
| Apr 30, 2021 | In progress issued May 2026 | 98 West Portal Av | Profound Systems Inc. | bring bldg entrance up to code accordance to disabled bldg entrance (sf abe) program. replace (e) sidewalk, steps, ramp & handrail. install high/low automatic door actuators @ (e) exterior doors. replace door hardware @ exterior main entry/exit door. relocate (e) walk-up atm & after-hour depositoryDetails
bring bldg entrance up to code accordance to disabled bldg entrance (sf abe) program. replace (e) sidewalk, steps, ramp & handrail. install high/low automatic door actuators @ (e) exterior doors. replace door hardware @ exterior main entry/exit door. relocate (e) walk-up atm & after-hour depository | $262,441 |
| Feb 12, 2019 | Expired or cancelled withdrawn Nov 2019 | 1500 Polk St | relocate non-compliant atm from polk st to california st. provide accessible atm along california st. relocate (e) interior atm and relocate non-load bearing wall.Details
relocate non-compliant atm from polk st to california st. provide accessible atm along california st. relocate (e) interior atm and relocate non-load bearing wall. | $13,832 |