Thomas Davick
- Listed as
- architect, designer, engineer
- Firm
- Thomas Davick Architect
- Based in
- San Francisco
- On San Francisco permits
- Feb 2005 to Nov 2025
31 permits since 2000 (architect on 29 permits, designer on 1 permit, engineer on 1 permit): 23 completed, 3 in progress, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 24, 2025 | In progress issued Dec 2025 | 55 Palm Av | A D C, Inc | revision to pa# 202108236903: delete proposed 2nd floor deck and adjacent 1 hour wall at nw end of (e) building. replace in kind 2 (e) metal balconies at west end of 2/f. add 1 (n) metal balcony to match (e) balconies at nw end of 2/f.Details
revision to pa# 202108236903: delete proposed 2nd floor deck and adjacent 1 hour wall at nw end of (e) building. replace in kind 2 (e) metal balconies at west end of 2/f. add 1 (n) metal balcony to match (e) balconies at nw end of 2/f. | $1,000 |
| Apr 8, 2025 | In progress issued Apr 2025 | 55 Palm Av | A D C, Inc | revision to pa#202108236903: return the ground floor apartment plan units to the floor areas defined in pa#9912035-s. relocate kitchen in apt #2 to (e) foyer area & build 1-hr wall between the (n) kitchen in apt #2 and (e) stairs. correct the location of an (e) door between apt #1 and garageDetails
revision to pa#202108236903: return the ground floor apartment plan units to the floor areas defined in pa#9912035-s. relocate kitchen in apt #2 to (e) foyer area & build 1-hr wall between the (n) kitchen in apt #2 and (e) stairs. correct the location of an (e) door between apt #1 and garage | $1,000 |
| Aug 23, 2021 | In progress issued Dec 2024 | 55 Palm Av | A D C, Inc | restore ground flr units 1, 2 & 3 to conform w/ pa 201310250299 and comply w/ complaint 2020-007315enf remove (e) deck and stairs at north side of 2nd flr lvl and replace w/ (n) deck, stairs and 1-hr wall.Details
restore ground flr units 1, 2 & 3 to conform w/ pa 201310250299 and comply w/ complaint 2020-007315enf remove (e) deck and stairs at north side of 2nd flr lvl and replace w/ (n) deck, stairs and 1-hr wall. | $45,000 |
| Feb 26, 2019 | Completed final sign-off Oct 2021 | 1254 11th Av | Lindquist Custom Construction Inc | revision to pa 201901110182 add c channels to existing beamDetails
revision to pa 201901110182 add c channels to existing beam | |
| Jan 11, 2019 | Completed final sign-off Jun 2019 | 1254 11th Av | Lindquist Custom Construction Inc | dry rot repair and e northeast corner of 2nd fl. renovation of e kitchen, removal e walls separating e kitchen from e breakfast nook and pantryDetails
dry rot repair and e northeast corner of 2nd fl. renovation of e kitchen, removal e walls separating e kitchen from e breakfast nook and pantry | $52,000 |
| Jan 9, 2018 | Completed final sign-off Oct 2018 | 33 Farnum St | Urban Builder General Contracting Inc | alterations of (e) residence at 1st fl replace (e) bathroom & laundry with (n) in a different location; remove (e) bearing wall to create a single undivided space; replace 2 (e) sliding glass doors with a single set of a larger sliding glass doors. remove & replace in-kind the (e) 2nd floor deckDetails
alterations of (e) residence at 1st fl replace (e) bathroom & laundry with (n) in a different location; remove (e) bearing wall to create a single undivided space; replace 2 (e) sliding glass doors with a single set of a larger sliding glass doors. remove & replace in-kind the (e) 2nd floor deck | $120,000 |
| Sep 25, 2017 | Completed final sign-off Aug 2020 | 92 Concord St | legalization of an unwarrended dwelling unit per ordinance# 43-14. 1 bedroom & 1 bath.Details
legalization of an unwarrended dwelling unit per ordinance# 43-14. 1 bedroom & 1 bath. | $36,000 | |
| Aug 4, 2016 | Completed final sign-off Jan 2019 | 2820 Sacramento St | Urban Builder General Contracting Inc | 2 story addition to rear yard to enlarge (e) bedrooms & add (n) bathroom to (e) residential units. associated exterior sitework at the nw corner of building to extend (e) deck & replace upper set of stairs to the rear yard. alterations of (e) interior walls at master bedroom closets @ 2nd & 3rd flrsDetails
2 story addition to rear yard to enlarge (e) bedrooms & add (n) bathroom to (e) residential units. associated exterior sitework at the nw corner of building to extend (e) deck & replace upper set of stairs to the rear yard. alterations of (e) interior walls at master bedroom closets @ 2nd & 3rd flrs | $125,000 |
| Jul 6, 2016 | Completed final sign-off Jul 2016 | 160 Newman St | to obtain final inspection for work approved under pa #201203307215 & 201207275980. all work is complete.Details
to obtain final inspection for work approved under pa #201203307215 & 201207275980. all work is complete. | ||
| Jun 17, 2016 | Completed final sign-off Jul 2016 | 160 Newman St | revision 1 delete gas furnace and gas waterheater and replace with hydronic gas boiler and water tank. minor changes to interior non load bearing walls to eliminate chases. change configuration of 2nd fl bath and closet. ref bpa#201409257279Details
revision 1 delete gas furnace and gas waterheater and replace with hydronic gas boiler and water tank. minor changes to interior non load bearing walls to eliminate chases. change configuration of 2nd fl bath and closet. ref bpa#201409257279 | ||
| Feb 22, 2016 | Completed final sign-off Jan 2017 | 2820 Sacramento St | 1) nterior alterations of 3rd to renovate extg kitchen, add laundry in extg hallway, add or expand openings in extg interior walls. 2)interior alterations on 2nd floor to renovate extg bathroom and add laundry area in extg closet. 3)work to comply with report of physical inspection #cc-7876Details
1) nterior alterations of 3rd to renovate extg kitchen, add laundry in extg hallway, add or expand openings in extg interior walls. 2)interior alterations on 2nd floor to renovate extg bathroom and add laundry area in extg closet. 3)work to comply with report of physical inspection #cc-7876 | $70,000 | |
| Sep 4, 2015 | Never finaled issued Sep 2015, no final | 215 Webster St | Marvel Construction Company Inc | revision to permit application 201507020576; add footing and posts at beam support (interior)Details
revision to permit application 201507020576; add footing and posts at beam support (interior) | $1,000 |
| Aug 28, 2015 | Completed final sign-off Jan 2016 | 2447 Vallejo St | Urban Builder General Contracting Inc | unit #4: removate & expand (e) bathroom into adjoing bedrrom, consolidate dining rm & living rm & add bedroom in the formal dining rm area. relocate door opening at (e) center hall. add closet to master bedroom. new laundry area at north end of kitchen. maher na er egress windows compliantDetails
unit #4: removate & expand (e) bathroom into adjoing bedrrom, consolidate dining rm & living rm & add bedroom in the formal dining rm area. relocate door opening at (e) center hall. add closet to master bedroom. new laundry area at north end of kitchen. maher na er egress windows compliant | $57,000 |
| Jul 2, 2015 | Never finaled issued Jul 2015, no final | 3004 Taraval St | Sasso Construction Inc. | alterations to provide ada bathroom & ada compliant front entry, (n) lighting to meet title 24 requirements, (n) non load bearing interior walls.Details
alterations to provide ada bathroom & ada compliant front entry, (n) lighting to meet title 24 requirements, (n) non load bearing interior walls. | $53,500 |
| Jun 3, 2015 | Completed final sign-off Mar 2016 | 215 Webster St | Marvel Construction Company Inc | demolition of existing 3 story stairs, landings in rear year. replace in kind of stairs and landings.Details
demolition of existing 3 story stairs, landings in rear year. replace in kind of stairs and landings. | $52,000 |
| Sep 25, 2014 | Completed final sign-off Jul 2016 | 160 Newman St | 1)renovate 2/fl to add 2nd bdrm&reloc bthrm,(n)stair connecting 2/flr to 1/flr,build out empty 1/flr to incl ktchn,bthrm&laundry area,4)new retaining walls at south&west property lines,5)repair&replace roof struc,6)replace exterior stucco&shingle siding,7)remove(e)2/flr kitchen.8)replace window.Details
1)renovate 2/fl to add 2nd bdrm&reloc bthrm,(n)stair connecting 2/flr to 1/flr,build out empty 1/flr to incl ktchn,bthrm&laundry area,4)new retaining walls at south&west property lines,5)repair&replace roof struc,6)replace exterior stucco&shingle siding,7)remove(e)2/flr kitchen.8)replace window. | $130,000 | |
| Oct 25, 2013 | Completed final sign-off Feb 2014 | 55 Palm Av | Sasso Construction Inc. | alter configurations of 2 e gr floor apartments to provide a common foyer area. new interioDetails
alter configurations of 2 e gr floor apartments to provide a common foyer area. new interio | $50,000 |
| Aug 30, 2013 | Completed final sign-off Feb 2015 | 567 16th Av | remove (e) rear deck & stairs. (n) 1st story rear addition w/ (n) deck above. (n) interior stair connecting 2nd fl to 1st fl addition. (n) exterior stairs from (n) deck down to rear yard.Details
remove (e) rear deck & stairs. (n) 1st story rear addition w/ (n) deck above. (n) interior stair connecting 2nd fl to 1st fl addition. (n) exterior stairs from (n) deck down to rear yard. | $80,000 | |
| Aug 14, 2013 | Completed final sign-off Apr 2014 | 2277 Bryant St | Urban Builder General Contracting Inc | 1) 1st floor: voluntary structural upgrade and expansion of 14 sq ft to accomodate 2nd means of egress. 2)2nd and 3rd floor alterations to residential 2 units: renovate kitchens at both units, new master baths at both units, renovation of 1 extg bath at both units. reframe & change 6 windows.Details
1) 1st floor: voluntary structural upgrade and expansion of 14 sq ft to accomodate 2nd means of egress. 2)2nd and 3rd floor alterations to residential 2 units: renovate kitchens at both units, new master baths at both units, renovation of 1 extg bath at both units. reframe & change 6 windows. | $420,000 |
| Aug 20, 2010 | Expired or cancelled cancelled Sep 2011 | 158 22nd Av | remove (e) rear deck. new 592 sq. ft. 1st floor addition with roof deck @ back of house. new steps up to rear yard finish grade from back of 1st floor level.Details
remove (e) rear deck. new 592 sq. ft. 1st floor addition with roof deck @ back of house. new steps up to rear yard finish grade from back of 1st floor level. | $217,000 | |
| Sep 30, 2009 | Completed final sign-off Mar 2011 | 447 17th Av | work to comply w/ nov#200679730. demolition of (e) non-conforming spaces on 1st. flr. & (e) rear deck & stairs. (n) 1st. floor addition w/ deck above, return non-conforming 1st. flr. space to original conforming use.Details
work to comply w/ nov#200679730. demolition of (e) non-conforming spaces on 1st. flr. & (e) rear deck & stairs. (n) 1st. floor addition w/ deck above, return non-conforming 1st. flr. space to original conforming use. | $172,000 | |
| Feb 12, 2009 | Never finaled issued Feb 2009, no final | 447 17th Av | to obtain final inspection for work approved under pa#200701020802. all work is complete.Details
to obtain final inspection for work approved under pa#200701020802. all work is complete. | ||
| Feb 4, 2009 | Completed final sign-off Jan 2010 | 473 Hill St | Arcistruct Inc | revision to 200408302840: rear yard, demolish e deck/stairs, 1 hr wall, build new steps /conc slabs on grade. 1st fl, demo e laundry and entry walls, delete 2 exterior doors, add 4 windows. 2nd fl, replace e rear door with new window. 3rd flr, change e roof to deck, add sliding glass door.Details
revision to 200408302840: rear yard, demolish e deck/stairs, 1 hr wall, build new steps /conc slabs on grade. 1st fl, demo e laundry and entry walls, delete 2 exterior doors, add 4 windows. 2nd fl, replace e rear door with new window. 3rd flr, change e roof to deck, add sliding glass door. | $60,000 |
| Jan 7, 2009 | Completed final sign-off Jan 2010 | 473 Hill St | Arcistruct Inc | renew pa# 2004/08/30/2840 to complete work & obtain final inspection.Details
renew pa# 2004/08/30/2840 to complete work & obtain final inspection. | |
| Sep 4, 2008 | Completed final sign-off Jan 2009 | 4031 23rd St | revision to extg permti to delete new 1 hr wall & new deck and remove and relocate 3 extg windows and 3 extg doors. revision to app # 200803207659Details
revision to extg permti to delete new 1 hr wall & new deck and remove and relocate 3 extg windows and 3 extg doors. revision to app # 200803207659 | ||
| Apr 10, 2008 | Completed final sign-off Sep 2008 | 186 Dellbrook Av | kitchen renovation: remove (e) cabinets, appliances, finishes & install new cabinets, appliances and finishes. remove/replace (e) 48x48 window on east wall. install new window on north wallDetails
kitchen renovation: remove (e) cabinets, appliances, finishes & install new cabinets, appliances and finishes. remove/replace (e) 48x48 window on east wall. install new window on north wall | $26,000 | |
| Mar 20, 2008 | Completed final sign-off Jan 2009 | 4031 23rd St | remove (e) non-permitted exterior stairs & deck in rearyard. build (n) stairs with 1-hr. property line wall in same location. build (n) deck at 4'-6" above grade & 5 ft. from prop. line.Details
remove (e) non-permitted exterior stairs & deck in rearyard. build (n) stairs with 1-hr. property line wall in same location. build (n) deck at 4'-6" above grade & 5 ft. from prop. line. | $27,500 | |
| Dec 13, 2007 | Completed final sign-off Apr 2008 | 566 Haight St | Andrew Poage | revision #3 to p/a #2007.01.09.1311. minor plumbing changes. install lighting control panels in basement. change heating system in tenant #2 (#566). eliminate one hood in restaurant (#568).Details
revision #3 to p/a #2007.01.09.1311. minor plumbing changes. install lighting control panels in basement. change heating system in tenant #2 (#566). eliminate one hood in restaurant (#568). | |
| Jan 9, 2007 | Completed final sign-off Apr 2008 | 566 Haight St | facade alteration on 1/f for 2 new ada entrances & storefronts. change of use to full service restaurant (568 haight). change of use for 2nd commercial space (566 haight st.)Details
facade alteration on 1/f for 2 new ada entrances & storefronts. change of use to full service restaurant (568 haight). change of use for 2nd commercial space (566 haight st.) | $120,000 | |
| Apr 4, 2005 | Completed final sign-off Jun 2005 | 614 08th Av | renovation of (e) unfinished 1st floor space. build new bathroom, access room to utility panels &Details
renovation of (e) unfinished 1st floor space. build new bathroom, access room to utility panels & | $13,000 | |
| Feb 25, 2005 | Expired or cancelled expired Feb 2006 | 77 Ashbury Tr | Andrew Poage | waterproofing & foundation drain repairs on east side of houseDetails
waterproofing & foundation drain repairs on east side of house | $15,000 |