Steven Brinkerhoff
- Listed as
- authorized agent-others, contractor, designer
- Firm
- Brinkerhoff Construction
- Based in
- Pleasant Hill
- On San Francisco permits
- Oct 2014 to Sep 2024
16 permits since 2000 (contractor on 16 permits, authorized agent-others on 1 permit, designer on 1 permit): 11 completed, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 4, 2024 | Completed final sign-off Feb 2025 | 1530 Mcallister St | Brinkerhoff Construction | unt 4: replacing kitchen cabinets, countertop and appliances (this work is different from the previous work on pa# 2023-0616-0285Details
unt 4: replacing kitchen cabinets, countertop and appliances (this work is different from the previous work on pa# 2023-0616-0285 | $30,000 |
| Jul 18, 2024 | Completed final sign-off Jan 2025 | 643 Clay St | Brinkerhoff Construction | install hand sink at pos bar. build pony wall to sepearate front of house and back of house. build out pos bar with stone counter top. all work at the ground fl.Details
install hand sink at pos bar. build pony wall to sepearate front of house and back of house. build out pos bar with stone counter top. all work at the ground fl. | $17,000 |
| May 18, 2023 | Completed final sign-off Mar 2024 | 900 Bush St | Brinkerhoff Construction | unit 620 build a (n) partition wall separating the living room from a new bedroom; adding a swing door off the hallway for a new bedroom entrance; wing wall framing for a closet; kitchen - all new cabinets and stone tops. electrical outlets upgrade and under cabinet lighting with new appliancesDetails
unit 620 build a (n) partition wall separating the living room from a new bedroom; adding a swing door off the hallway for a new bedroom entrance; wing wall framing for a closet; kitchen - all new cabinets and stone tops. electrical outlets upgrade and under cabinet lighting with new appliances | $33,000 |
| Aug 2, 2022 | Never finaled issued Aug 2022, no final | 422 Larkin St | Brinkerhoff Construction | install a new countertop in (e) location with stone (36inx97in) for pos bar. new electrical and plumbing modifications.no layout or wall modifications. no structural work.Details
install a new countertop in (e) location with stone (36inx97in) for pos bar. new electrical and plumbing modifications.no layout or wall modifications. no structural work. | $15,630 |
| Apr 18, 2022 | Completed final sign-off Oct 2022 | 1441 Jones St | Brinkerhoff Construction | apt 501: kitchen & bathroom remodel: update fixtures- no wall layout changes- update electrical receptacles & subpanel location.Details
apt 501: kitchen & bathroom remodel: update fixtures- no wall layout changes- update electrical receptacles & subpanel location. | $45,000 |
| Jan 26, 2022 | Completed final sign-off Jun 2022 | 900 Bush St | Brinkerhoff Construction | unit #1101: trim swap out tile floor and painting of bathroom. 1 bathroom remodel. exist toilet & tub remain.Details
unit #1101: trim swap out tile floor and painting of bathroom. 1 bathroom remodel. exist toilet & tub remain. | $5,500 |
| Oct 27, 2021 | Expired or cancelled cancelled Jan 2026 | 1626 21st Av | Brinkerhoff Construction | alteration of existing "winder" staircase to "straight" staircase. interior work.Details
alteration of existing "winder" staircase to "straight" staircase. interior work. | $14,000 |
| Sep 30, 2021 | Completed final sign-off Oct 2022 | 1626 21st Av | Brinkerhoff Construction | bathroom remodel: update fixtures. no wall layout changesDetails
bathroom remodel: update fixtures. no wall layout changes | $7,600 |
| Mar 10, 2021 | Completed final sign-off Aug 2021 | 900 Bush St | Brinkerhoff Construction | remove & replace existing flooring, replace bathroom vanity & faucet.new lenoleum flooring.Details
remove & replace existing flooring, replace bathroom vanity & faucet.new lenoleum flooring. | $20,000 |
| Mar 10, 2021 | Completed final sign-off Aug 2021 | 900 Bush St | Brinkerhoff Construction | remove & replace existing flooring, replace bathroom vanity & faucet.new lenoleum flooring.Details
remove & replace existing flooring, replace bathroom vanity & faucet.new lenoleum flooring. | $7,000 |
| Oct 15, 2020 | Completed final sign-off Jan 2021 | 1011 Market St | Brinkerhoff Construction | remove and replace (e) security fence and gate with upgraded amenities for security purposes. no alteration to (e) height and layout. fronting stevenson street.Details
remove and replace (e) security fence and gate with upgraded amenities for security purposes. no alteration to (e) height and layout. fronting stevenson street. | $35,000 |
| Aug 21, 2019 | Never finaled issued Aug 2019, no final | 616 Guerrero St | Brinkerhoff Construction | repaint/repair window frames - no work to sashesDetails
repaint/repair window frames - no work to sashes | $3,100 |
| May 31, 2019 | Completed final sign-off Jul 2021 | 706 Castro St | Brinkerhoff Construction | demolition of existing bathroom, general construction, tile work and shower enclosure and fixtures.Details
demolition of existing bathroom, general construction, tile work and shower enclosure and fixtures. | $51,248 |
| Feb 12, 2019 | Never finaled issued Feb 2019, no final | 44 Yukon St | Brinkerhoff Construction | remove and replace floor and wall tile in unit 44 bathroom. remove and replace kitchen countertops in both units (44 & 46). remove and replace new stone fireplaces surroundings in both units (44 & 46)Details
remove and replace floor and wall tile in unit 44 bathroom. remove and replace kitchen countertops in both units (44 & 46). remove and replace new stone fireplaces surroundings in both units (44 & 46) | $22,700 |
| Aug 10, 2018 | Expired or cancelled expired Feb 2024 | 539 Valencia St | Brinkerhoff Construction | install nw appliances/nw fixtures to an extg vacant retail space. to create new cafe counter and work area, office/storage space, new seating area at gridline one new storefront and new bulk head at store facade & nw acesble toilet & da ch/list under #201809079548. nw mech, elect, & plumbing als0Details
install nw appliances/nw fixtures to an extg vacant retail space. to create new cafe counter and work area, office/storage space, new seating area at gridline one new storefront and new bulk head at store facade & nw acesble toilet & da ch/list under #201809079548. nw mech, elect, & plumbing als0 | $100,000 |
| Oct 8, 2014 | Completed final sign-off May 2016 | 350 Parnassus Av | Brinkerhoff Construction | #201: demolition of casework only. electrical, plumbing, removal of 7 sinks on separate permits.Details
#201: demolition of casework only. electrical, plumbing, removal of 7 sinks on separate permits. | $1,600 |