Tim Rouch
- Listed as
- architect
- Firm
- Rouch Design & Architecture
- Based in
- Oakland
- On San Francisco permits
- Jul 2008 to Mar 2013
3 permits since 2000 (architect on 3 permits): 2 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 18, 2013 | Expired or cancelled cancelled Jun 2018 | 3964 20th St | Phase 2 Builders | build an exterior stair in the rear yard going from upper floor down to the rear yard. replace 6(e) windows in kind on rear of home. replace (e)windows with new door. variance applied for exterior stair: case no#2013.0230v , account no. 20130686.Details
build an exterior stair in the rear yard going from upper floor down to the rear yard. replace 6(e) windows in kind on rear of home. replace (e)windows with new door. variance applied for exterior stair: case no#2013.0230v , account no. 20130686. | $24,960 |
| Jan 28, 2013 | Completed final sign-off Mar 2013 | 1668 Alabama St | replace 2 (e) windows on front elevation in kind with new wood windows with insulated glazing. remove the (e) front entry stairs & replace it with a new entry stairs. add a new hose bibb on side of new entry stairsDetails
replace 2 (e) windows on front elevation in kind with new wood windows with insulated glazing. remove the (e) front entry stairs & replace it with a new entry stairs. add a new hose bibb on side of new entry stairs | $16,500 | |
| Jul 17, 2008 | Completed final sign-off May 2010 | 273 Chestnut St | Ciaran Breen Construction | addition of guardrail at extg roof edge with new roof deck, replace wndw in exg third story cupola with a new door to provide access to roof. new door will not be visible from streetDetails
addition of guardrail at extg roof edge with new roof deck, replace wndw in exg third story cupola with a new door to provide access to roof. new door will not be visible from street | $26,000 |