Ephraim Hirsch
- License
- 1200
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect, engineer
- Firm
- Eg Hirsch & Assoc.
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Jul 2008
3 permits since 2000 (architect on 2 permits, engineer on 1 permit): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- R D Rossi And Son (2), Ciaran Breen Construction
- Architects
- Tim Rouch
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 17, 2008 | Completed final sign-off May 2010 | 273 Chestnut St | Ciaran Breen Construction | addition of guardrail at extg roof edge with new roof deck, replace wndw in exg third story cupola with a new door to provide access to roof. new door will not be visible from streetDetails
addition of guardrail at extg roof edge with new roof deck, replace wndw in exg third story cupola with a new door to provide access to roof. new door will not be visible from street | $26,000 |
| May 7, 2007 | Completed final sign-off Jul 2007 | 2137 Jones St | R D Rossi And Son | phase 2: add 2 new 12"x12" concrete grade beams in crawl space area. add 1 2"x4" amd 1 2"x6" wall section with 1/2 plywood nailed with 10d at 4" o.c. perimeter & edges asds 5/8" gypsum wall board to (e) garage walls above crawl space.Details
phase 2: add 2 new 12"x12" concrete grade beams in crawl space area. add 1 2"x4" amd 1 2"x6" wall section with 1/2 plywood nailed with 10d at 4" o.c. perimeter & edges asds 5/8" gypsum wall board to (e) garage walls above crawl space. | $15,500 |
| May 7, 2007 | Completed final sign-off Jul 2007 | 2484 21st Av | R D Rossi And Son | add additonal 6" concrete wall 6'-6" h x 15'-4" w to (e) concrete wall in store room. saw cut (e) non load-bearing concrete wall section between store room and garage to provide clean edge. repair (e) concrete floor in store room and garage as necessary.Details
add additonal 6" concrete wall 6'-6" h x 15'-4" w to (e) concrete wall in store room. saw cut (e) non load-bearing concrete wall section between store room and garage to provide clean edge. repair (e) concrete floor in store room and garage as necessary. | $19,000 |