Douglas Thompson
- Listed as
- architect, engineer
- Firm
- Thompson Studio Architects
- Based in
- Mill Valley
- On San Francisco permits
- Jul 2005 to Oct 2022
10 permits since 2000 (architect on 9 permits, engineer on 1 permit): 8 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 26, 2022 | Completed final sign-off Nov 2023 | 685 Market St | K C Glass Inc | demolition and replacement of approx 15 lin feet of storefront locted in the northern most bay facing market st. storefront opening will be replaced with new storefront of like kind and watch the onfiguration of the adjacent storefront openingDetails
demolition and replacement of approx 15 lin feet of storefront locted in the northern most bay facing market st. storefront opening will be replaced with new storefront of like kind and watch the onfiguration of the adjacent storefront opening | $38,000 |
| Aug 6, 2012 | Completed final sign-off Mar 2021 | 2050 Jefferson St | Peterson Mullin Const | revision to 201108041756. as built conditions. remove sprinklers requirement. keep fire barrier to separate (n) & (e) two story addition only.Details
revision to 201108041756. as built conditions. remove sprinklers requirement. keep fire barrier to separate (n) & (e) two story addition only. | |
| Aug 5, 2011 | Completed final sign-off Mar 2021 | 2050 Jefferson St | Peterson Mullin Const | window replacement, repair and replace roof deck and guardrail / parapet. install 2 skylights. foundation repair and struc. upgradesDetails
window replacement, repair and replace roof deck and guardrail / parapet. install 2 skylights. foundation repair and struc. upgrades | $35,000 |
| Aug 4, 2011 | Completed final sign-off Mar 2021 | 2050 Jefferson St | Peterson Mullin Const | rear two story addition with rear deck, interior remodel at areas adjacent to addition.Details
rear two story addition with rear deck, interior remodel at areas adjacent to addition. | $300,000 |
| Oct 25, 2007 | Completed final sign-off Apr 2009 | 1833 Mcallister St | interior remodel of existing second floor. relocate kitchen, convert existing 1 1/2 bath into 2 baths. reconfigure interior partition walls.Details
interior remodel of existing second floor. relocate kitchen, convert existing 1 1/2 bath into 2 baths. reconfigure interior partition walls. | $25,000 | |
| Nov 23, 2005 | Expired or cancelled cancelled Aug 2011 | 1366 La Playa | add third story and extend to rear. remodel (e) two units into three units and add two parking spaces. change of occupancy.Details
add third story and extend to rear. remodel (e) two units into three units and add two parking spaces. change of occupancy. | $525,000 | |
| Aug 5, 2005 | Completed final sign-off Sep 2008 | 131 Rivoli St | erect a new 3 story 1 dwelling unit building.Details
erect a new 3 story 1 dwelling unit building. | $650,000 | |
| Aug 5, 2005 | Completed final sign-off Dec 2006 | 131 Rivoli St | to demolish 1 story single family dwelling building.Details
to demolish 1 story single family dwelling building. | ||
| Aug 1, 2005 | Expired or cancelled expired Jul 2008 | 1345 Montgomery St | Vic - 1 Construction | remodel interior living spaces.rebuild interior stairs,add roof top deck,replace elevator,Details
remodel interior living spaces.rebuild interior stairs,add roof top deck,replace elevator, | $150,000 |
| Jul 7, 2005 | Completed final sign-off Apr 2006 | 1624 20th St | repalce (e) single glazed window at arear w/new insulated windows and dorrs. replacewood shingles atDetails
repalce (e) single glazed window at arear w/new insulated windows and dorrs. replacewood shingles at | $40,000 |