Thomas William Hawkins
- License
- C65782
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C65782 at the Board for Professional Engineers
- Listed as
- authorized agent-others, engineer
- Firm
- Thomas Hawkins P.E.
- Based in
- Elko
- On San Francisco permits
- Dec 2000 to Mar 2012
2 permits since 2000 (authorized agent-others on 1 permit, engineer on 1 permit): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Transbay Design Build
- Architects
- Fred Dolven
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 20, 2012 | Completed final sign-off Sep 2014 | 73 Sequoia Wy | Transbay Design Build | reml lower level&stairs down.divides space to6 rms: bedrm,study,laundry rm,hallway,bathrm,garage. +incidental closets&storage.remodel w/gypsum board&wood studs for walls.gypsum nailed to(e)flr joists for ceilings.replace support w/steel beam.leveled w/taped joists&sleepers attach to new plywood flr.Details
reml lower level&stairs down.divides space to6 rms: bedrm,study,laundry rm,hallway,bathrm,garage. +incidental closets&storage.remodel w/gypsum board&wood studs for walls.gypsum nailed to(e)flr joists for ceilings.replace support w/steel beam.leveled w/taped joists&sleepers attach to new plywood flr. | $80,000 |
| Dec 1, 2000 | Completed final sign-off Sep 2001 | 45 Prado St | conversion of extg ground floor bdrm/bth into recreation roomDetails
conversion of extg ground floor bdrm/bth into recreation room | $105,000 |