Thomas Godfrey
- License
- 32156
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect, engineer
- Firm
- Pittman Engineering
- On San Francisco permits
- Apr 2016 to Dec 2022
4 permits since 2000 (engineer on 3 permits, architect on 1 permit): 2 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Becker Electric Inc (2), Balch Petroleum Contractors & Builders, Wells Construction Inc
- Engineers
- Robert Pittman
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 1 of 4 have no building type on record and are shown as other.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 15, 2022 | Never finaled issued Dec 2022, no final | 945 Sacramento St | Balch Petroleum Contractors & Builders | install a remote fuel fill system for an e roof top mounted generator. fill box located flush in exterior building wall at street level. fill pipe runs through building, up to roof through an existing 2 fire rated shaft. fill box includes intergral transfer pump and controller.Details
install a remote fuel fill system for an e roof top mounted generator. fill box located flush in exterior building wall at street level. fill pipe runs through building, up to roof through an existing 2 fire rated shaft. fill box includes intergral transfer pump and controller. | $110,000 |
| Mar 18, 2021 | Never finaled issued Jul 2022, no final | 3455 Van Ness Av | Becker Electric Inc | furnishing and installing a turn-key fuel oil system per sec having a connection with the diesel generator system with a feul piping system connected to the existing fuel oil piping. pump station 2Details
furnishing and installing a turn-key fuel oil system per sec having a connection with the diesel generator system with a feul piping system connected to the existing fuel oil piping. pump station 2 | $62,000 |
| Aug 30, 2019 | Completed final sign-off Nov 2019 | 461 06th Av | Becker Electric Inc | revision to 201806192309. revisoi from orig permit during fire inspection to raise fuel oil vent pipes (emergency generator) install additonal bollardDetails
revision to 201806192309. revisoi from orig permit during fire inspection to raise fuel oil vent pipes (emergency generator) install additonal bollard | $7,000 |
| Apr 1, 2016 | Completed final sign-off Jun 2016 | 215 King St | Wells Construction Inc | #100- revision to pa#201601207404, addition of (1) new heat pump (ffp-4) unit with associated electrical & plumbing requirements. relocation of heat pump units. n/a ordinance #155-13Details
#100- revision to pa#201601207404, addition of (1) new heat pump (ffp-4) unit with associated electrical & plumbing requirements. relocation of heat pump units. n/a ordinance #155-13 | $28,000 |