Theodore N. Sakauye
- License
- C24235
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- E Structure
- On San Francisco permits
- Aug 2016 to May 2020
3 permits since 2000 (architect on 3 permits): 2 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Luxor Construction Inc. (2), City Building Inc.
- Authorized agents
- David Romero
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 14, 2020 | Never finaled issued Aug 2020, no final | 1500 Owens St | Luxor Construction Inc. | revision to app #2019-0131-1750. revised finishes, clean storage, phasing. minor floor plan, ceiling revisions. relocate wall, shelving anchorage, clinical freezer. modification to janitor closet, fluid waste system, duct modif. plumbing modification to decontam room. sprinklers added.Details
revision to app #2019-0131-1750. revised finishes, clean storage, phasing. minor floor plan, ceiling revisions. relocate wall, shelving anchorage, clinical freezer. modification to janitor closet, fluid waste system, duct modif. plumbing modification to decontam room. sprinklers added. | $150,000 |
| Jan 31, 2019 | Completed final sign-off Dec 2020 | 1500 Owens St | Luxor Construction Inc. | 2nd floor: convert shelled storage to operating room. convert storage to clean storage. increase pre-sterile room size. **maher n/a**Details
2nd floor: convert shelled storage to operating room. convert storage to clean storage. increase pre-sterile room size. **maher n/a** | $1,000,000 |
| Aug 22, 2016 | Completed final sign-off Nov 2016 | 1500 Owens St | City Building Inc. | partial 1st, 3rd & 4th floor - add plumbing, casework, & electrical to convert 3 (e) clinic rooms into exam rooms. add interior partition to storage room. add plumbing for hand sink in relocated medical equipment room. n/a maher ordinanceDetails
partial 1st, 3rd & 4th floor - add plumbing, casework, & electrical to convert 3 (e) clinic rooms into exam rooms. add interior partition to storage room. add plumbing for hand sink in relocated medical equipment room. n/a maher ordinance | $150,000 |