Steven Lee
- License
- E15417
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E15417 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Jul 2012 to Oct 2014
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Clw Builders Inc
- Architects
- Will Kwan
- Engineers
- Kin Lau
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2014 | Completed final sign-off Jun 2017 | 250 Clay St | Clw Builders Inc | replace (e) exhaust fans and supply fans for the garage and install carbon monoxide sensors.Details
replace (e) exhaust fans and supply fans for the garage and install carbon monoxide sensors. | $1,500,000 |
| Jul 17, 2012 | Completed final sign-off May 2015 | 70 Elk St | to make (ada) acessible: path of travel. restrooms, doors, drinking foundation, mechanical, electrical work to the site & restrooms, drinking fountain. incl conc. slab in restrooms. new landscape work to the site.Details
to make (ada) acessible: path of travel. restrooms, doors, drinking foundation, mechanical, electrical work to the site & restrooms, drinking fountain. incl conc. slab in restrooms. new landscape work to the site. | $1,261,382 |