Stephen Mccullough
- Listed as
- architect, engineer
- Firm
- Drill Tech
- Based in
- Antioch
- On San Francisco permits
- Aug 2016 to May 2024
10 permits since 2000 (engineer on 8 permits, architect on 2 permits): 10 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 7, 2024 | Completed final sign-off Jul 2025 | 200 Folsom St | Swinerton Builders | priority process mayoral dir 17-02: deferred permit for 2022-0801-9628, for a 151 unit, 84'-10" tall building, 100% affordable. shoring for cistern installation about 9ft deep, with 28 ft long steel soldier piles with wood lagging. ch fatty clay at 14ft to 20ft, in liquefaction.Details
priority process mayoral dir 17-02: deferred permit for 2022-0801-9628, for a 151 unit, 84'-10" tall building, 100% affordable. shoring for cistern installation about 9ft deep, with 28 ft long steel soldier piles with wood lagging. ch fatty clay at 14ft to 20ft, in liquefaction. | $148,467 |
| Feb 24, 2023 | Completed final sign-off Oct 2024 | 900 Innes Av | Swinerton Builders | priority process - 1. the existing cottage is to be jacked up and temporarily supported. 2. temporary shoring under and adjacent to the cottage is to be installed. this work is to take place at the cottage which already has an existing permit, pa # 202103237136.Details
priority process - 1. the existing cottage is to be jacked up and temporarily supported. 2. temporary shoring under and adjacent to the cottage is to be installed. this work is to take place at the cottage which already has an existing permit, pa # 202103237136. | $590,000 |
| Jan 19, 2018 | Completed final sign-off Jun 2021 | 720 Powell St | Swinerton Builders | tieback encroachment form work at 750 powell (pa # 201712136383) temp shoring and excavation to accomodate for new construction at 770 powell/875 california. maher naDetails
tieback encroachment form work at 750 powell (pa # 201712136383) temp shoring and excavation to accomodate for new construction at 770 powell/875 california. maher na | $1,000 |
| Dec 13, 2017 | Completed final sign-off Jun 2021 | 875 California St | Swinerton Builders | temporary shoring and excavation to prepare site for new construction under 201603091627Details
temporary shoring and excavation to prepare site for new construction under 201603091627 | $50,000 |
| Dec 13, 2017 | Completed final sign-off May 2020 | 720 Powell St | Swinerton Builders | temporary shoring and excavation to accomodate new construction at 770 powell/875 californiaDetails
temporary shoring and excavation to accomodate new construction at 770 powell/875 california | $50,000 |
| Dec 13, 2017 | Completed final sign-off Jun 2021 | 770 Powell St | Swinerton Builders | temporary shoring and excavation to accomodate new construction at 770 powell/875 california maher req; bpa#201603091627Details
temporary shoring and excavation to accomodate new construction at 770 powell/875 california maher req; bpa#201603091627 | $50,000 |
| Apr 21, 2017 | Completed final sign-off Feb 2021 | 390 01st St | Drill Tech Drilling & Shoring Inc, Swinerton Builders | shoring for new construction. ref pa #2016-0127-8125s. ** maher: disturbance of at least 50 cu.yd of soil. route to dph **Details
shoring for new construction. ref pa #2016-0127-8125s. ** maher: disturbance of at least 50 cu.yd of soil. route to dph ** | $912,165 |
| Apr 21, 2017 | Completed final sign-off Jan 2020 | 390 01st St | Granite Excavation & Demolition Inc, Swinerton Builders | ref pa #2016-0127-8125s. install soil shoring walls on (3) sides of the project (lansing, 1st & harrison st) & excavate down to allow the foundation to be installed during the excavation underground fuel tanks will be removed (under seperate permit) ** maher: yes, route to dph **Details
ref pa #2016-0127-8125s. install soil shoring walls on (3) sides of the project (lansing, 1st & harrison st) & excavate down to allow the foundation to be installed during the excavation underground fuel tanks will be removed (under seperate permit) ** maher: yes, route to dph ** | $1,739,679 |
| Dec 14, 2016 | Completed final sign-off Mar 2018 | 240 Pacific Av | Swinerton Builders | temporary shoring and excavationDetails
temporary shoring and excavation | $250,000 |
| Aug 10, 2016 | Completed final sign-off Dec 2016 | 1201 Bryant St | deferred micropile submittal, refrence structural drawing, application #2016-05-12-7270. scope of work: install 12 micropiles. maher ordinance 155-13 not required.Details
deferred micropile submittal, refrence structural drawing, application #2016-05-12-7270. scope of work: install 12 micropiles. maher ordinance 155-13 not required. | $220,000 |