Sonny Tang
- Listed as
- authorized agent-others, contractor, designer, pmt consultant/expediter
- Firm
- Integrity General Construction Inc
- Based in
- Daly City
- On San Francisco permits
- Jan 2013 to Jan 2026
95 permits since 2000 (contractor on 86 permits, pmt consultant/expediter on 5 permits, authorized agent-others on 2 permits, designer on 2 permits): 70 completed, 2 in progress, 18 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 15, 2026 | In progress issued Jan 2026 | 1476 Portola Dr | Integrity General Construction Inc | revision to pa # 2022-0809-0182 & 2025-0410-4171: revise entire 3rd fl layout. new 3' tall fence at front setback.Details
revision to pa # 2022-0809-0182 & 2025-0410-4171: revise entire 3rd fl layout. new 3' tall fence at front setback. | $3,000 |
| Nov 14, 2025 | Completed final sign-off Sep 2026 | 2120 Moraga St | Integrity General Construction Inc | 1/f: add 2 bedroom, 2 full bath and family. 2/f: reodel kitchen and bathroom, add 1 full bath. add new patio at rear.Details
1/f: add 2 bedroom, 2 full bath and family. 2/f: reodel kitchen and bathroom, add 1 full bath. add new patio at rear. | $120,000 |
| Apr 10, 2025 | In progress issued Apr 2025 | 1476 Portola Dr | Integrity General Construction Inc | revision to bpa#: 202208090182 and 202309076083. 1st flr: add bathtub in middle bathroom change rear dr to lacanina door. 2nd flr: change rear dr to lacantina door; 3rd flr: remove proposed rear bathroom window change interior stari railing with glass. new railing at rear yard. new retaining wallDetails
revision to bpa#: 202208090182 and 202309076083. 1st flr: add bathtub in middle bathroom change rear dr to lacanina door. 2nd flr: change rear dr to lacantina door; 3rd flr: remove proposed rear bathroom window change interior stari railing with glass. new railing at rear yard. new retaining wall | $5,000 |
| Apr 8, 2025 | Expired or cancelled expired May 2026 | 1667 34th Av | Integrity General Construction Inc | revision to 201605197928 and 202501108162. 2nd fl clsoe window at shower and add new furnace. 1st fl remove tub, new glass railings. new deck with stairs at rear.Details
revision to 201605197928 and 202501108162. 2nd fl clsoe window at shower and add new furnace. 1st fl remove tub, new glass railings. new deck with stairs at rear. | $20,000 |
| Feb 5, 2025 | Completed final sign-off Dec 2025 | 137 Oxford St | Pionic Unit Construction Co | nov#: 202430051; remove horizontal expansion of a living area and full bath on the first flr level at rear of structure under deck. exceeding work under pa#: 201601157184.Details
nov#: 202430051; remove horizontal expansion of a living area and full bath on the first flr level at rear of structure under deck. exceeding work under pa#: 201601157184. | $10,000 |
| Jan 10, 2025 | Completed final sign-off May 2026 | 1667 34th Av | Integrity General Construction Inc | recommencement and completion of work approved under bpa#: 201605197928 70% of work remaining.Details
recommencement and completion of work approved under bpa#: 201605197928 70% of work remaining. | $310,000 |
| May 8, 2024 | Completed final sign-off Aug 2025 | 345 Moncada Wy | Integrity General Construction Inc | 1st fl: add 1 bedroom and relocate 1 full bath and laundry. new wet bar. 2nd fl: convert sunroom to full bath and power room to a laundry. remodel 1 bath and remove 3 skylights from family room. replace 18 windows at rear and replace stucco at east, south and west sides of building.Details
1st fl: add 1 bedroom and relocate 1 full bath and laundry. new wet bar. 2nd fl: convert sunroom to full bath and power room to a laundry. remodel 1 bath and remove 3 skylights from family room. replace 18 windows at rear and replace stucco at east, south and west sides of building. | $60,000 |
| Mar 15, 2024 | Completed final sign-off May 2024 | 220 Broad St | Integrity General Construction Inc | replace stucco at side visible from the street about 1500 sfDetails
replace stucco at side visible from the street about 1500 sf | $3,500 |
| Feb 7, 2024 | Completed final sign-off Mar 2024 | 471 Orizaba Av | Integrity General Construction Inc | revision to 202303083213. change railing marerial to glassDetails
revision to 202303083213. change railing marerial to glass | |
| Nov 28, 2023 | Completed final sign-off Sep 2024 | 50 Santa Clara Av | Integrity General Construction Inc | revision to pa# 202302282778, replace front landing. within property lineDetails
revision to pa# 202302282778, replace front landing. within property line | $1,000 |
| Oct 20, 2023 | Completed final sign-off Dec 2023 | 209 Sargent St | Integrity General Construction Inc | kitchen and bathroom remodel. relocate refrigerator. replace (e) counter & add new counter spaces.Details
kitchen and bathroom remodel. relocate refrigerator. replace (e) counter & add new counter spaces. | $10,000 |
| Sep 7, 2023 | Never finaled issued Sep 2023, no final | 1476 Portola Dr | Integrity General Construction Inc | revision to permit 202208090182. change deck to cantilever deck.Details
revision to permit 202208090182. change deck to cantilever deck. | $3,800 |
| Aug 4, 2023 | Completed final sign-off Jul 2024 | 795 Naples St | Integrity General Construction Inc | 1st flr: infill at rear, add media room, bedroom, office and 2 full baths. 2nd flr: infill light-wells. add 1 full bath and bedroom. remodel (e) bathroom and to relocate kitchen and dining. (e) rear deck to be legalized under separate permit.Details
1st flr: infill at rear, add media room, bedroom, office and 2 full baths. 2nd flr: infill light-wells. add 1 full bath and bedroom. remodel (e) bathroom and to relocate kitchen and dining. (e) rear deck to be legalized under separate permit. | $260,000 |
| Aug 1, 2023 | Completed final sign-off Apr 2025 | 723 Lisbon St | Integrity General Construction Inc | comply w/nov # 202305669, repair fire damages: 1st flr- repair damage ceiling joists & new sheetrock throughout, 2nd flr- replace insulation & drywall throught, replace fire damage walls & front windows & siding, attic-replace damage flr joists & roof, new insulation & drywall at front rm,Details
comply w/nov # 202305669, repair fire damages: 1st flr- repair damage ceiling joists & new sheetrock throughout, 2nd flr- replace insulation & drywall throught, replace fire damage walls & front windows & siding, attic-replace damage flr joists & roof, new insulation & drywall at front rm, | $486,000 |
| Jun 7, 2023 | Completed final sign-off Jan 2024 | 436 University St | Integrity General Construction Inc | remodel kitchen, new rear deck w/stairs on 2/f, add family room, bedroom, (2) full bathrooms, 1/f wetbar , mini split system for 1/f rooms, replace wh w/tankless typeDetails
remodel kitchen, new rear deck w/stairs on 2/f, add family room, bedroom, (2) full bathrooms, 1/f wetbar , mini split system for 1/f rooms, replace wh w/tankless type | $80,000 |
| Apr 7, 2023 | Completed final sign-off Jan 2024 | 1437 Polk St | Integrity General Construction Inc | comply w/ nov 202304690. repair south side 2nd to 3rd fl stairs. 3rd fl unit 7: fire damaged unit to be fully remodeled. unit 10: replace ceiling fire damaged sheetrock. replace ceiling & wall fire damaged sheetrock in common area. all work in-kind.Details
comply w/ nov 202304690. repair south side 2nd to 3rd fl stairs. 3rd fl unit 7: fire damaged unit to be fully remodeled. unit 10: replace ceiling fire damaged sheetrock. replace ceiling & wall fire damaged sheetrock in common area. all work in-kind. | $50,000 |
| Mar 8, 2023 | Completed final sign-off Mar 2024 | 471 Orizaba Av | Beyond The Horizon Construction, Integrity General Construction Inc | add new deck at rear.Details
add new deck at rear. | $3,000 |
| Feb 28, 2023 | Completed final sign-off Sep 2024 | 50 Santa Clara Av | Integrity General Construction Inc | 1/f: add 1 bedroom, 1 full bath and laundry; 2/f: remodel kitchen and dinning room; 3/f: remodel 3 bathrooms; replace all windows in-kind w/wood, replace garage door, add new cantilever deck at rear, epair 3rd flr deck.Details
1/f: add 1 bedroom, 1 full bath and laundry; 2/f: remodel kitchen and dinning room; 3/f: remodel 3 bathrooms; replace all windows in-kind w/wood, replace garage door, add new cantilever deck at rear, epair 3rd flr deck. | $98,000 |
| Oct 18, 2022 | Completed final sign-off Dec 2022 | 252 Minerva St | Integrity General Construction Inc | main floor: replace kitchen countertop. replace toilets and vanities for 2 bathrooms. must address complaint #202296806 eid. no wall alteredDetails
main floor: replace kitchen countertop. replace toilets and vanities for 2 bathrooms. must address complaint #202296806 eid. no wall altered | $2,300 |
| Sep 28, 2022 | Completed final sign-off Dec 2022 | 1467 19th Av | Integrity General Construction Inc | new deck at rearDetails
new deck at rear | $10,000 |
| Sep 13, 2022 | Completed final sign-off Oct 2022 | 1467 19th Av | Integrity General Construction Inc | remodel kitchen in kind (220 sf.) no alteration of wall, window, doorDetails
remodel kitchen in kind (220 sf.) no alteration of wall, window, door | $10,000 |
| Aug 9, 2022 | Never finaled issued Jul 2023, no final | 1476 Portola Dr | Integrity General Construction Inc | 1st fl: add family, 1 bedroom, laundry and 1.5 bath 2nd & 3rd fl: total remodel, add new deck n/a maherh. replace all front windows with in kind. same operation, wood with ogree egress.Details
1st fl: add family, 1 bedroom, laundry and 1.5 bath 2nd & 3rd fl: total remodel, add new deck n/a maherh. replace all front windows with in kind. same operation, wood with ogree egress. | $98,000 |
| Jul 20, 2022 | Never finaled issued Sep 2022, no final | 723 Lisbon St | Integrity General Construction Inc | to comply with nov202289837: 2/f: legalize 1 full bathorom, remove non-permitted bathroom in attic.Details
to comply with nov202289837: 2/f: legalize 1 full bathorom, remove non-permitted bathroom in attic. | $5,000 |
| Jun 21, 2022 | Completed final sign-off Dec 2022 | 1839 25th Av | Integrity General Construction Inc | 1/f: add home office, wetbar, family room, media room and a full bath.Details
1/f: add home office, wetbar, family room, media room and a full bath. | $45,000 |
| Mar 15, 2022 | Completed final sign-off Dec 2022 | 1839 25th Av | Integrity General Construction Inc | revision to bpa 202112083957. 2/f: reconfigure bathroom layout. infill lightwell. add skylight.Details
revision to bpa 202112083957. 2/f: reconfigure bathroom layout. infill lightwell. add skylight. | $5,000 |
| Feb 25, 2022 | Completed final sign-off Jul 2022 | 1290 38th Av | Integrity General Construction Inc | replace 2 windows at rear, not visible from the street.Details
replace 2 windows at rear, not visible from the street. | $500 |
| Dec 24, 2021 | Completed final sign-off Jun 2022 | 2462 41st Av | Integrity General Construction Inc | remodel kitchen and 2 bathrooms.Details
remodel kitchen and 2 bathrooms. | $20,000 |
| Dec 14, 2021 | Completed final sign-off Jun 2022 | 630 05th Av | Integrity General Construction Inc | 1st floor: remove non-load bearing wall from social room. new wetbar, 1 new sliding door and convert half bath to approved layout under bpa 9802424Details
1st floor: remove non-load bearing wall from social room. new wetbar, 1 new sliding door and convert half bath to approved layout under bpa 9802424 | $2,800 |
| Dec 8, 2021 | Completed final sign-off Dec 2022 | 1839 25th Av | Integrity General Construction Inc | 2nd fl: infill (e) center light court, reconfigure/ remodel kitchen and dining room and bathroom, add 1 new full bath. add rear deck per plans.Details
2nd fl: infill (e) center light court, reconfigure/ remodel kitchen and dining room and bathroom, add 1 new full bath. add rear deck per plans. | $70,000 |
| Jun 17, 2021 | Never finaled issued Jun 2021, no final | 327 Vernon St | Integrity General Construction Inc | replace tile in the shower.Details
replace tile in the shower. | $5,000 |
| May 10, 2021 | Never finaled issued May 2021, no final | 50 Mercury St | Integrity General Construction Inc | remode bathrom in kind - 65 sf on 2/f. no structural work, no framing modification.Details
remode bathrom in kind - 65 sf on 2/f. no structural work, no framing modification. | $6,500 |
| Apr 29, 2021 | Completed final sign-off Oct 2021 | 3228 Santiago St | Integrity General Construction Inc | remodel kitchen (100 sf) & bathroom (35 sf) in-kind.Details
remodel kitchen (100 sf) & bathroom (35 sf) in-kind. | $16,000 |
| Apr 23, 2021 | Completed final sign-off Oct 2021 | 3228 Santiago St | Integrity General Construction Inc | interior structural work only. remove portion of (e) wall between living and dining room. no work visible from street or expansion of building envelope.Details
interior structural work only. remove portion of (e) wall between living and dining room. no work visible from street or expansion of building envelope. | $15,000 |
| Mar 29, 2021 | Expired or cancelled expired Oct 2022 | 454 Hearst Av | revision to app#202008051186. remove proposed one full bathroom from the 1st floor. remodel extg bathroom and add a full bathroom on the 2nd floor. remove proposed deck.Details
revision to app#202008051186. remove proposed one full bathroom from the 1st floor. remodel extg bathroom and add a full bathroom on the 2nd floor. remove proposed deck. | $50,000 | |
| Feb 12, 2021 | Completed final sign-off Dec 2022 | 83 Mount Vernon Av | remodel kitchen & bathroom. add 1 new bathroom. convert den to 1 bedroom. install interior stairs on 2nd floor. add 2 bedrooms, 1 media room & 2 full bathrooms on 1st fl.Details
remodel kitchen & bathroom. add 1 new bathroom. convert den to 1 bedroom. install interior stairs on 2nd floor. add 2 bedrooms, 1 media room & 2 full bathrooms on 1st fl. | $80,000 | |
| Feb 12, 2021 | Completed final sign-off Nov 2021 | 137 Amazon Av | relocate kitchen. add a bedroom and 2 bathrooms. remodel a bathroom. remove fireplace on 2nd floor unit.Details
relocate kitchen. add a bedroom and 2 bathrooms. remodel a bathroom. remove fireplace on 2nd floor unit. | $40,000 | |
| Feb 12, 2021 | Completed final sign-off Nov 2021 | 357 Ulloa St | Ze Sheng Liao | replace foundation. install structural beams and lower garage floor by approximately 8" maximum.Details
replace foundation. install structural beams and lower garage floor by approximately 8" maximum. | $40,000 |
| Nov 16, 2020 | Completed final sign-off Feb 2023 | 1635 29th Av | Doug's Construction Inc | remodel kitchen and bathroom. add a rear deck with stairs on the 2nd floor. add a bedroom, family and mud room on 1/f.Details
remodel kitchen and bathroom. add a rear deck with stairs on the 2nd floor. add a bedroom, family and mud room on 1/f. | $70,000 |
| Nov 16, 2020 | Completed final sign-off Jun 2022 | 1562 22nd Av | Tai Lam Mak | relocate kitchen and add an office on the 1/f. add a full bathroom on the 2/f.Details
relocate kitchen and add an office on the 1/f. add a full bathroom on the 2/f. | $30,000 |
| Oct 19, 2020 | Completed final sign-off Jun 2022 | 1562 Innes Av | 1/f: add 2 bedrooms, a mudroom, and 2 full bathrooms. 2/f: remodel (e) kitchen and bathroom, add a new bathroom & relocate interior stairs. new tankless water heater. install 1 new skylight.Details
1/f: add 2 bedrooms, a mudroom, and 2 full bathrooms. 2/f: remodel (e) kitchen and bathroom, add a new bathroom & relocate interior stairs. new tankless water heater. install 1 new skylight. | $120,000 | |
| Sep 12, 2020 | Never finaled issued Dec 2020, no final | 943 Prague St | comply w/ complaint #202034821: 1st floor - replace water heater furnace and install a new furnace washer & dryer. 2nd floor - remodel kitchen and bathroom. add a three fixture bathroom, change dining room to befroom. 3rd floor - remodel bathroom and add a new bath. full interior remodel.Details
comply w/ complaint #202034821: 1st floor - replace water heater furnace and install a new furnace washer & dryer. 2nd floor - remodel kitchen and bathroom. add a three fixture bathroom, change dining room to befroom. 3rd floor - remodel bathroom and add a new bath. full interior remodel. | $100,000 | |
| Jun 12, 2020 | Completed final sign-off Aug 2020 | 1154 Naples St | Integrity General Construction Inc | install 1,500 square feet of cement siding in rear. a new cement siding will be installed overlay of the existing wood siding. not visible from street.Details
install 1,500 square feet of cement siding in rear. a new cement siding will be installed overlay of the existing wood siding. not visible from street. | $6,000 |
| Mar 12, 2020 | Completed final sign-off Dec 2020 | 1530 Eucalyptus Dr | Integrity General Construction Inc | add a family room, a bedroom, a full bathroom and a laundry room on the 1st floor. remodel 2nd floor kitchen and 2 bathrooms.Details
add a family room, a bedroom, a full bathroom and a laundry room on the 1st floor. remodel 2nd floor kitchen and 2 bathrooms. | $80,000 |
| Feb 6, 2020 | Completed final sign-off May 2020 | 1475 19th Av | Integrity General Construction Inc | revision to 201912058799. remove partition walls per plansDetails
revision to 201912058799. remove partition walls per plans | |
| Dec 5, 2019 | Completed final sign-off May 2020 | 1475 19th Av | Integrity General Construction Inc | 1st fl - add 1 unit - 1 kitchen, living, office, 2 bedrooms and 2 full bathsDetails
1st fl - add 1 unit - 1 kitchen, living, office, 2 bedrooms and 2 full baths | $30,000 |
| Jul 25, 2019 | Expired or cancelled expired May 2026 | 1667 34th Av | Integrity General Construction Inc | revision to pa #201605197928. revise concrete to 2500 psi and remove concrete sampling special inspection. raise ceiling joints at existing building.Details
revision to pa #201605197928. revise concrete to 2500 psi and remove concrete sampling special inspection. raise ceiling joints at existing building. | $5,000 |
| Jun 6, 2019 | Completed final sign-off Jan 2020 | 815 Huron Av | Integrity General Construction Inc | 1st floor: legalize extg laundry and half bath. add family room.Details
1st floor: legalize extg laundry and half bath. add family room. | $12,000 |
| May 14, 2019 | Completed final sign-off Dec 2019 | 118 Casitas Av | Integrity General Construction Inc | rmeodel kitchen and 2 baths. repair rear deck less than 50%.Details
rmeodel kitchen and 2 baths. repair rear deck less than 50%. | $30,000 |
| Jan 9, 2019 | Completed final sign-off Mar 2019 | 60 Garcia Av | Integrity General Construction Inc | bathroom remodel on 2nd fl. no wall to be removed or added.Details
bathroom remodel on 2nd fl. no wall to be removed or added. | $10,000 |
| Jun 19, 2018 | Completed final sign-off Jul 2018 | 367 Hamilton St | Integrity General Construction Inc | no change of use under this permit. to address nov 201868841 - reduce 6' solid wood fence in front yard to allow 3' solid fence. no other work under this permit.Details
no change of use under this permit. to address nov 201868841 - reduce 6' solid wood fence in front yard to allow 3' solid fence. no other work under this permit. | $300 |
| Mar 29, 2018 | Completed final sign-off Jul 2018 | 45 Dunsmuir St | Integrity General Construction Inc | kitchen remodel: replace kitchen cabinets & counter tops. no walls being removed or added. revisoin to pa# 201709200112Details
kitchen remodel: replace kitchen cabinets & counter tops. no walls being removed or added. revisoin to pa# 201709200112 | $5,000 |
| Mar 5, 2018 | Never finaled issued Jun 2018, no final | 362 Princeton St | Integrity General Construction Inc | add two bedrooms, two full bathrooms, and a hallway on 1st floorDetails
add two bedrooms, two full bathrooms, and a hallway on 1st floor | $65,000 |
| Sep 20, 2017 | Completed final sign-off Jul 2018 | 45 Dunsmuir St | Integrity General Construction Inc | 2nd floor: add a new bathroom and remodel (e) bathroom per plan. 2 bedrooms and bathroom and family room is complete under app #9703001.Details
2nd floor: add a new bathroom and remodel (e) bathroom per plan. 2 bedrooms and bathroom and family room is complete under app #9703001. | $20,000 |
| Sep 15, 2017 | Completed final sign-off May 2018 | 80 Santa Ysabel Av | Integrity General Construction Inc | remodel kitchen, relocate bathrooms, and closet, remove interior stair, add new 2 fix bath and rear deck 2nd fl. add family rm, bdrm, office, 2 fixture bath 1st fl. relocate furnace, water heater, washer dryerDetails
remodel kitchen, relocate bathrooms, and closet, remove interior stair, add new 2 fix bath and rear deck 2nd fl. add family rm, bdrm, office, 2 fixture bath 1st fl. relocate furnace, water heater, washer dryer | $60,000 |
| Sep 14, 2017 | Completed final sign-off Jun 2018 | 13 Las Villas Ct | Integrity General Construction Inc | interior remodel, kitchen & bathroom, window replacement back of house not visible from street, new hardwood floor, painting,Details
interior remodel, kitchen & bathroom, window replacement back of house not visible from street, new hardwood floor, painting, | $20,000 |
| Aug 30, 2017 | Never finaled filed Aug 2017, never issued | 1190 Revere Av | Integrity General Construction Inc | legalize (e) kitchen to convert (2) units to (3) units under ordinance #43-14Details
legalize (e) kitchen to convert (2) units to (3) units under ordinance #43-14 | $9,000 |
| Aug 30, 2017 | Never finaled issued Aug 2019, no final | 1715 Newcomb Av | Bay County Construction Inc, Integrity General Construction Inc | legalize ground floor kitchen. add unit c under ordinance #43-14 (1) bedroom & (1) bathDetails
legalize ground floor kitchen. add unit c under ordinance #43-14 (1) bedroom & (1) bath | $8,000 |
| Aug 18, 2017 | Completed final sign-off Dec 2018 | 2242 35th Av | Integrity General Construction Inc | relocate bathroom, add new one and a half bath. relocate kitchen, enclose light court, add new office , add 7 skylights on 2nd floor. add 2 bedrooms, 2 full baths, a media room, a storage room. relocate laundry facilities. replace with w/h & furnace at 1st fl. to comply with complaint #201797861Details
relocate bathroom, add new one and a half bath. relocate kitchen, enclose light court, add new office , add 7 skylights on 2nd floor. add 2 bedrooms, 2 full baths, a media room, a storage room. relocate laundry facilities. replace with w/h & furnace at 1st fl. to comply with complaint #201797861 | $120,000 |
| Jul 21, 2017 | Completed final sign-off Dec 2018 | 2242 35th Av | Integrity General Construction Inc | replace damaged plaster walls in ear bedrooms and replace cracked concrete slab in the basementDetails
replace damaged plaster walls in ear bedrooms and replace cracked concrete slab in the basement | $2,000 |
| Jun 9, 2017 | Never finaled filed Jun 2017, never issued | 3164 San Bruno Av | Integrity General Construction Inc | legalize (e) kitchen. convert single family to 2 units under ordinance# 43-14. 2 bedrooms & 1 bath in new unit.Details
legalize (e) kitchen. convert single family to 2 units under ordinance# 43-14. 2 bedrooms & 1 bath in new unit. | $8,000 |
| Mar 24, 2017 | Completed final sign-off Sep 2017 | 243 25th Av | Integrity General Construction Inc | legalize 1 bedroom, 1 kitchen and kitchen at the ground floor to comply with complaint #201757212. no other work.Details
legalize 1 bedroom, 1 kitchen and kitchen at the ground floor to comply with complaint #201757212. no other work. | $5,000 |
| Oct 7, 2016 | Completed final sign-off Dec 2017 | 2011 San Jose Av | Integrity General Construction Inc | to comply with nov 201605071: convert den to walk-in close convert family room to mud room. install laundry facilities at garage.Details
to comply with nov 201605071: convert den to walk-in close convert family room to mud room. install laundry facilities at garage. | $2,000 |
| Feb 26, 2016 | Completed final sign-off Jul 2016 | 1268 Bowdoin St | Integrity General Construction Inc | convert (e) family room and laundry room to 2 bedrooms, 2 full bathrooms and a mud room. relocate laundry room facilities, furnace and w/h. construct a rear deck off 2nd flr.Details
convert (e) family room and laundry room to 2 bedrooms, 2 full bathrooms and a mud room. relocate laundry room facilities, furnace and w/h. construct a rear deck off 2nd flr. | $30,000 |
| Dec 15, 2015 | Never finaled issued Feb 2020, no final | 1270 Fitzgerald Av | Bay County Construction Inc, Integrity General Construction Inc | legalize (e) kitchens to legalize (e) residential units under unit legalization program per plan. comply w/ nov #201569121, #201569684, #201567912. per ord #43-14. add one bedroom.Details
legalize (e) kitchens to legalize (e) residential units under unit legalization program per plan. comply w/ nov #201569121, #201569684, #201567912. per ord #43-14. add one bedroom. | $8,000 |
| Dec 15, 2015 | Never finaled filed Dec 2015, never issued | 1351 Revere Av | Integrity General Construction Inc | revise appln #201507010461 legalize (e) kitchen on the round fl to legalize illegal units per plan. comply w/ nov #201553041, #201569651, #201553052 per ord 43-14.Details
revise appln #201507010461 legalize (e) kitchen on the round fl to legalize illegal units per plan. comply w/ nov #201553041, #201569651, #201553052 per ord 43-14. | |
| Dec 15, 2015 | Completed final sign-off Oct 2016 | 2071 18th Av | Integrity General Construction Inc | revision to app#201510079128. revised bathroom layout.Details
revision to app#201510079128. revised bathroom layout. | $1,000 |
| Dec 11, 2015 | Completed final sign-off Oct 2021 | 1465 Revere Av | Bay County Construction Inc, J C Tan Builders, Integrity General Construction Inc | legalize existing kitchen on ground floor to and add one residential unitDetails
legalize existing kitchen on ground floor to and add one residential unit | $8,000 |
| Dec 2, 2015 | Never finaled filed Dec 2015, never issued | 1050 Gilman Av | Integrity General Construction Inc | legalize existing kitchen on the ground floor. to legalize 1 residential unit under unit legalization ord 43-14.Details
legalize existing kitchen on the ground floor. to legalize 1 residential unit under unit legalization ord 43-14. | $8,000 |
| Dec 2, 2015 | Expired or cancelled cancelled Nov 2022 | 38 Carr St | Integrity General Construction Inc | legalize existing kitchen on the second floor. to legalize 1 existing residential unit under unit legalization ord 43-14.Details
legalize existing kitchen on the second floor. to legalize 1 existing residential unit under unit legalization ord 43-14. | $8,000 |
| Nov 20, 2015 | Never finaled filed Nov 2015, never issued | 1395 Shafter Av | Integrity General Construction Inc | legalize (e) kitchen to add (1)(n) residential unit under unit legalization program. comply with nov #201569101, #201569671, #201567612. ** maher: n/a **Details
legalize (e) kitchen to add (1)(n) residential unit under unit legalization program. comply with nov #201569101, #201569671, #201567612. ** maher: n/a ** | $5,000 |
| Nov 20, 2015 | Expired or cancelled expired Nov 2021 | 947 Innes Av | Bay County Construction Inc, J C Tan Builders, Integrity General Construction Inc | (per ordinance 146-15) legalize (e) kitchen to add (1)(n) residential unit under unit legalization program. legalize (e) garage to living space per plan. comply with nov #201569124, #201569691, #201567914Details
(per ordinance 146-15) legalize (e) kitchen to add (1)(n) residential unit under unit legalization program. legalize (e) garage to living space per plan. comply with nov #201569124, #201569691, #201567914 | $8,000 |
| Nov 10, 2015 | Never finaled filed Nov 2015, never issued | 1083 Hollister Av | Integrity General Construction Inc | legalize ground fl kitchen to add (1)(n) residential unit under unit lealization program. legalize garage to ground fl unit's living room. comply with nov #201569083, nov #201569681, nov #201567882Details
legalize ground fl kitchen to add (1)(n) residential unit under unit lealization program. legalize garage to ground fl unit's living room. comply with nov #201569083, nov #201569681, nov #201567882 | $10,000 |
| Nov 10, 2015 | Never finaled issued Aug 2019, no final | 1656 Newcomb Av | Bay County Construction Inc, Integrity General Construction Inc | legalize ground floor kitch to add (1)(n) residential unit under unit legalization program per plan. comply nov #201569191, nov #201567915, nov #201569711 per ord# 43-14.Details
legalize ground floor kitch to add (1)(n) residential unit under unit legalization program per plan. comply nov #201569191, nov #201567915, nov #201569711 per ord# 43-14. | $8,000 |
| Oct 7, 2015 | Completed final sign-off Oct 2016 | 2071 18th Av | Integrity General Construction Inc | remodel kitchen with non structural wall removal. replace damaged drywall at living room, new rear deck, remodel existing bath 1st fl.Details
remodel kitchen with non structural wall removal. replace damaged drywall at living room, new rear deck, remodel existing bath 1st fl. | $30,000 |
| Sep 15, 2015 | Never finaled issued Sep 2015, no final | 462 Athens St | Integrity General Construction Inc | repair damage drywall in rear bedroom.Details
repair damage drywall in rear bedroom. | $500 |
| Jul 15, 2015 | Completed final sign-off Dec 2019 | 85 Valdez Av | Integrity General Construction Inc | 1st fl alteration to add 3 bedrooms, 3 full baths, laundry room. relocate kitchen to dining room. convert kitchen to new bedroom. remodel e bath on 2nd flDetails
1st fl alteration to add 3 bedrooms, 3 full baths, laundry room. relocate kitchen to dining room. convert kitchen to new bedroom. remodel e bath on 2nd fl | $110,000 |
| Jun 11, 2015 | Completed final sign-off May 2016 | 243 Stratford Dr | Integrity General Construction Inc | add 1 bedroom, 1 bathroom & laundry on garage floor per plan. relocate (e) kitchen & (e) dining room, add 1 bath on 1st floor per plan.Details
add 1 bedroom, 1 bathroom & laundry on garage floor per plan. relocate (e) kitchen & (e) dining room, add 1 bath on 1st floor per plan. | $8,000 |
| Apr 16, 2015 | Completed final sign-off May 2016 | 347 Athens St | Integrity General Construction Inc | remodel kitchen and 2 bathrooms. add a new bathroom, relocate closets in bedrooms. add a home office, 2 bedrooms and 3 full bathrooms on 1st flr.Details
remodel kitchen and 2 bathrooms. add a new bathroom, relocate closets in bedrooms. add a home office, 2 bedrooms and 3 full bathrooms on 1st flr. | $85,000 |
| Apr 16, 2015 | Completed final sign-off Dec 2016 | 2367 15th Av | Integrity General Construction Inc | 1st flr/garage: - add 2 bedrooms and 1 home office and 2 full bathrooms on 1st floor (garage level). add new rear stairs and deck off 2nd flr. relocate w/d, w/h and furnaceDetails
1st flr/garage: - add 2 bedrooms and 1 home office and 2 full bathrooms on 1st floor (garage level). add new rear stairs and deck off 2nd flr. relocate w/d, w/h and furnace | $65,000 |
| Jan 26, 2015 | Completed final sign-off Oct 2015 | 252 Cambridge St | Integrity General Construction Inc | add 2 half bath, 2 bedrooms, 1 storage and media room at ground floor. remodel (e) kitechen and bathroom and add 1 new bath at 2nd floor. enclose new bedroom below (e) sunroom at ground floor. infill (e) light wells per plan. replace (e) footing and slab at ground floor per plan.Details
add 2 half bath, 2 bedrooms, 1 storage and media room at ground floor. remodel (e) kitechen and bathroom and add 1 new bath at 2nd floor. enclose new bedroom below (e) sunroom at ground floor. infill (e) light wells per plan. replace (e) footing and slab at ground floor per plan. | $60,000 |
| Jan 12, 2015 | Completed final sign-off Jun 2015 | 742 Avalon Av | Integrity General Construction Inc | revision to 201411171639. enlarge deck from 7 ft to 9ftDetails
revision to 201411171639. enlarge deck from 7 ft to 9ft | $500 |
| Nov 25, 2014 | Completed final sign-off Jun 2015 | 742 Avalon Av | Integrity General Construction Inc | repair stuccon on left side of the wall in kind. replace sheet rock in the living room and add insulation.Details
repair stuccon on left side of the wall in kind. replace sheet rock in the living room and add insulation. | $500 |
| Nov 17, 2014 | Completed final sign-off Jun 2015 | 742 Avalon Av | Integrity General Construction Inc | remodel kitchen convert e bath and closet to 2 baths. add rear deck on 2nd fl. add a family room, 2 bedrooms and 2 full baths on 1st flDetails
remodel kitchen convert e bath and closet to 2 baths. add rear deck on 2nd fl. add a family room, 2 bedrooms and 2 full baths on 1st fl | $75,000 |
| Nov 17, 2014 | Never finaled issued Nov 2014, no final | 162 Princeton St | Integrity General Construction Inc | remodel kitchen on 2nd fl. add new family room, bedroom, 2 baths, storage room on 1st fl*Details
remodel kitchen on 2nd fl. add new family room, bedroom, 2 baths, storage room on 1st fl* | $45,000 |
| Oct 23, 2014 | Completed final sign-off Nov 2015 | 600 Hamilton St | Integrity General Construction Inc | remodel kitchen, add family room, 3 bedroos, 3 baths on 1st fl, relocate furnace and waterheaterDetails
remodel kitchen, add family room, 3 bedroos, 3 baths on 1st fl, relocate furnace and waterheater | $65,000 |
| Sep 11, 2014 | Completed final sign-off Sep 2015 | 1121 Burrows St | Integrity General Construction Inc | comply with compliant #201492161, convert storage area to bedrooms on ground floor, add one bath, add rear deck with stairs approx. 18'6" x 10'Details
comply with compliant #201492161, convert storage area to bedrooms on ground floor, add one bath, add rear deck with stairs approx. 18'6" x 10' | $30,000 |
| Mar 5, 2014 | Completed final sign-off Apr 2014 | 295 Ulloa St | Integrity General Construction Inc | 1st flr alteration to add a full bathroomDetails
1st flr alteration to add a full bathroom | $10,000 |
| Nov 5, 2013 | Completed final sign-off Mar 2014 | 278 Edinburgh St | Integrity General Construction Inc | 2nd floor alteration to relocate ktichen, interior stair & bedrooms, add new bathroom, replace on front window, new electrical. 1st floor alteration to add two bedrooms, family room & full bath, recess garage door, new furnace, water heater & foundation.Details
2nd floor alteration to relocate ktichen, interior stair & bedrooms, add new bathroom, replace on front window, new electrical. 1st floor alteration to add two bedrooms, family room & full bath, recess garage door, new furnace, water heater & foundation. | $85,000 |
| Oct 15, 2013 | Completed final sign-off Apr 2017 | 1756 Revere Av | Integrity General Construction Inc | horizontal extension at rear (approx 20'-0"). change of use from single family to 2 units. 2 new bedrooms, kitchen, bathroom relocation on 1st floor. add 1 bed, 1 bath & study on 2nd floor.Details
horizontal extension at rear (approx 20'-0"). change of use from single family to 2 units. 2 new bedrooms, kitchen, bathroom relocation on 1st floor. add 1 bed, 1 bath & study on 2nd floor. | $75,000 |
| Aug 30, 2013 | Completed final sign-off Dec 2013 | 15 Regent St | Integrity General Construction Inc | replace drywall in kind at bedrooms, 250sq ft. replace with 5/8 type x at properly line wallDetails
replace drywall in kind at bedrooms, 250sq ft. replace with 5/8 type x at properly line wall | $2,000 |
| Aug 16, 2013 | Completed final sign-off Apr 2017 | 1756 Revere Av | Integrity General Construction Inc | replace stucco in front in kindDetails
replace stucco in front in kind | $500 |
| Aug 15, 2013 | Completed final sign-off Dec 2013 | 15 Regent St | Integrity General Construction Inc | replace 5 aluminum windows in the front bedroms, visible from the street, same size openings, u factor not > 0.32Details
replace 5 aluminum windows in the front bedroms, visible from the street, same size openings, u factor not > 0.32 | $2,000 |
| Aug 15, 2013 | Completed final sign-off Apr 2017 | 1756 Revere Av | Ren Lei Construction Co, Integrity General Construction Inc | kitchen remodel, bathroom remodel, replace drywallDetails
kitchen remodel, bathroom remodel, replace drywall | $20,000 |
| Jun 17, 2013 | Completed final sign-off Oct 2013 | 543 Silver Av | Integrity General Construction Inc | replace four windows in living room, size are 121"x65", 10-3/4"x62" x 2, 33"x57". visable from street, fiberglass windows. a same openings, u factor 0.40 max.Details
replace four windows in living room, size are 121"x65", 10-3/4"x62" x 2, 33"x57". visable from street, fiberglass windows. a same openings, u factor 0.40 max. | $2,000 |
| Jan 10, 2013 | Completed final sign-off Mar 2013 | 3975 Mission St | Integrity General Construction Inc | kitchen remodel-cabinets installation, tile installation. no adding or removing wallDetails
kitchen remodel-cabinets installation, tile installation. no adding or removing wall | $11,000 |