Robin Chard
- License
- C13956
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Apr 2011 to Jun 2011
3 permits since 2000 (architect on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Centric Construction Inc (3)
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 22, 2011 | Completed final sign-off Jul 2011 | 1 Jefferson St | Centric Construction Inc | revision to 201103252864: remove scope of work. tube steel structure at exterior wall not to be installed.Details
revision to 201103252864: remove scope of work. tube steel structure at exterior wall not to be installed. | |
| Jun 22, 2011 | Completed final sign-off Jul 2011 | 1 Jefferson St | Centric Construction Inc | reduction in scope of work for app 201104289960: no new hvac units to be installed. no new nana wall at exterior will be installed. no fireplaces installed, no fireplace structure or seismic support installedDetails
reduction in scope of work for app 201104289960: no new hvac units to be installed. no new nana wall at exterior will be installed. no fireplaces installed, no fireplace structure or seismic support installed | |
| Apr 28, 2011 | Completed final sign-off Jul 2011 | 1 Jefferson St | Centric Construction Inc | non-structural tenant improvements including:new enty doors, metal stud and drywall dividing walls, new lighting, new mechanical and enhance extg mechanical including condensate drains, new finishes, new fire places.Details
non-structural tenant improvements including:new enty doors, metal stud and drywall dividing walls, new lighting, new mechanical and enhance extg mechanical including condensate drains, new finishes, new fire places. | $400,000 |