Robert Eynck
- Listed as
- engineer
- On San Francisco permits
- Jan 2022 to Dec 2022
2 permits since 2000 (engineer on 2 permits): 2 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 27, 2022 | Completed final sign-off May 2023 | 300 West Portal Av | Full Service Maintenance Inc | install automatic powered door operator and four push plates abe202002122026Details
install automatic powered door operator and four push plates abe202002122026 | $8,000 |
| Jan 20, 2022 | Completed final sign-off Aug 2022 | 548 07th St | Go Green Construction Inc | provide accessibility upgrades to remove the architectural barriers for the purpose of allowing equal access for persons with disabilities. proposed construction shall be limited to the location identified on sheet a1.3. demolish (e) ramp and install ada compliant ramp. to comply with abeDetails
provide accessibility upgrades to remove the architectural barriers for the purpose of allowing equal access for persons with disabilities. proposed construction shall be limited to the location identified on sheet a1.3. demolish (e) ramp and install ada compliant ramp. to comply with abe | $100,000 |