Robert Bernardin
- Listed as
- architect
- On San Francisco permits
- Dec 2008 to Jan 2025
7 permits since 2000 (architect on 7 permits): 3 completed, 1 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 3, 2025 | In progress issued Mar 2025 | 15 Leland Av | interior remodel and change of use of a former retail space into a bingo parlor. non structural partitions and remodel (e) toilet room.Details
interior remodel and change of use of a former retail space into a bingo parlor. non structural partitions and remodel (e) toilet room. | $15,000 | |
| Jul 21, 2020 | Completed final sign-off Sep 2022 | 2141 Filbert St | Dcs Plumbing Llc | partial infill of (e) lightwell with (n) bathroom. removal of (e) chimney. maher n/a.Details
partial infill of (e) lightwell with (n) bathroom. removal of (e) chimney. maher n/a. | $80,000 |
| Nov 6, 2019 | Never finaled issued Dec 2019, no final | 559 Clay St | Custom Contracting Services | install one single-faced illuminated wall sign for "one medical".Details
install one single-faced illuminated wall sign for "one medical". | $500 |
| Dec 18, 2018 | Expired or cancelled cancelled Jan 2026 | 281 Monterey Bl | W. John Build-General Con | remodel (e0 bathroom. remove 3rd story of (e) rear yard addition and convert to open deck/2 storiesDetails
remodel (e0 bathroom. remove 3rd story of (e) rear yard addition and convert to open deck/2 stories | $20,000 |
| Jun 7, 2013 | Expired or cancelled cancelled Jan 2026 | 151 Alice B Toklas Pl | reconfigure the non-structural wall between room 519 and 520, making 520 larger. add vents on existing supply ducts in 520. provide an extension from the existing separate fire exhaust/damper system and connect to new walls in the waste room. add a dedicated 120v circuits in room 520.Details
reconfigure the non-structural wall between room 519 and 520, making 520 larger. add vents on existing supply ducts in 520. provide an extension from the existing separate fire exhaust/damper system and connect to new walls in the waste room. add a dedicated 120v circuits in room 520. | $12,000 | |
| Mar 11, 2011 | Completed final sign-off Nov 2011 | 2141 Filbert St | Mulhall Construction Inc. | horizontial extension of rear of building existing deck to be cut back to accept addition.Details
horizontial extension of rear of building existing deck to be cut back to accept addition. | $100,000 |
| Dec 23, 2008 | Completed final sign-off Jan 2010 | 735 Dolores St | Sierra Construction | remove (e) dryrotting side yard egress deck and replace with modifications.Details
remove (e) dryrotting side yard egress deck and replace with modifications. | $15,000 |