Reece Relatores
- Listed as
- engineer
- Firm
- Relatores Structural
- Based in
- San Francisco
- On San Francisco permits
- Oct 2023 to Jun 2026
12 permits since 2000 (engineer on 12 permits): 2 completed, 8 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 29, 2026 | In progress filed Jun 2026, not yet issued | 608 Teresita Bl | new bathroom & interior wall layout (remodel @ 1stfloor) new kitchen layout 48 sf infill addition @ an existing . interior lightwell @ 2nd fl w/(n) 5'x10' light monitor @ roof levelDetails
new bathroom & interior wall layout (remodel @ 1stfloor) new kitchen layout 48 sf infill addition @ an existing . interior lightwell @ 2nd fl w/(n) 5'x10' light monitor @ roof level | $90,000 | |
| May 13, 2026 | In progress filed May 2026, not yet issued | 191 San Felipe Av | Hunter Dale Builders Inc. | demo type 5b 2-car garage at rear.Details
demo type 5b 2-car garage at rear. | $10,000 |
| May 13, 2026 | In progress filed May 2026, not yet issued | 191 San Felipe Av | Hunter Dale Builders Inc. | attached adu addition @ basement level of (e) rear yard. minor interior remodel at the lower level only, new deck at lower level. construction of new, one-car garage at the rear yard, and new grading and surface improvements to (e) shared access driveway at the alley. demo garage under seperate pa.Details
attached adu addition @ basement level of (e) rear yard. minor interior remodel at the lower level only, new deck at lower level. construction of new, one-car garage at the rear yard, and new grading and surface improvements to (e) shared access driveway at the alley. demo garage under seperate pa. | $390,000 |
| Apr 9, 2026 | In progress issued Jul 2026 | 4019 Cesar Chavez St | Perez Construction Llc. | interior remodel (no changes to exterior facade) including additon of 2 new baths, 1 new office space @ garage. associated structural work as required.Details
interior remodel (no changes to exterior facade) including additon of 2 new baths, 1 new office space @ garage. associated structural work as required. | $150,000 |
| Sep 24, 2025 | In progress filed Sep 2025, not yet issued | 608 Teresita Bl | 2 story partial renovation (380 sf) of an existing 2 story single family home; scope includes new adu access corridor & entry door (adu under separate permit); new sair, kitchen & master suite and new rear deckDetails
2 story partial renovation (380 sf) of an existing 2 story single family home; scope includes new adu access corridor & entry door (adu under separate permit); new sair, kitchen & master suite and new rear deck | $350,000 | |
| Jul 1, 2025 | Completed final sign-off Dec 2025 | 377 Park St | Ortizlaw Construction | revision to pa#: 202307313330 s1 (addendum 1); removal of west sheerwall per engineer letter.Details
revision to pa#: 202307313330 s1 (addendum 1); removal of west sheerwall per engineer letter. | $5 |
| May 21, 2024 | Completed final sign-off Nov 2024 | 451 Sanchez St | Edenavow Construction & Design | voluntary strengthening of an existing masonry and concrete foundationDetails
voluntary strengthening of an existing masonry and concrete foundation | $150,000 |
| Apr 19, 2024 | In progress issued May 2024 | 2900 Vallejo St | G-Man Construction, Deluxe Shotcrete & Concrete Construction | new landscaping wall at front wall to provide an adequate vertical distance from existing residence foundation wall to grade. no change in existing grade height.Details
new landscaping wall at front wall to provide an adequate vertical distance from existing residence foundation wall to grade. no change in existing grade height. | $40,000 |
| Mar 28, 2024 | Expired or cancelled cancelled Jul 2024 | 191 San Felipe Av | construction of a(n) attached accessory dwelling unit,addition @ the basement level of the(e)rear yard,minor interior remodel @ lower level only,(n)deck @lower level,construction of a(n) deck @ lower level,construction of a(n) one car garageDetails
construction of a(n) attached accessory dwelling unit,addition @ the basement level of the(e)rear yard,minor interior remodel @ lower level only,(n)deck @lower level,construction of a(n) deck @ lower level,construction of a(n) one car garage | $350,000 | |
| Dec 5, 2023 | In progress issued Dec 2023 | 2900 Vallejo St | G-Man Construction | revision to 202110049761. original concrete is not appropriate to drill in, need to remove the soft material & expose the original concrete steps to be able to drill into. structural engineer service req to provide a new detail & calcDetails
revision to 202110049761. original concrete is not appropriate to drill in, need to remove the soft material & expose the original concrete steps to be able to drill into. structural engineer service req to provide a new detail & calc | $15,000 |
| Dec 1, 2023 | In progress issued Oct 2024 | 1462 11th Av | Elite Engineering Contractors | 941 sf vert addition of (n) 3rd flr to incl: 3 bdrms,2 baths. (n)doors, wndws & skylites. int partition chnges @ 1st & 2nd flrs. (n)2nd fl blcny & stair to rear yd. 9sf court infill 2nd fl. relocate 1st fl mech equip. full seismic upgrd of bldg. rmdl entry hall at level 1. relocate garage door.Details
941 sf vert addition of (n) 3rd flr to incl: 3 bdrms,2 baths. (n)doors, wndws & skylites. int partition chnges @ 1st & 2nd flrs. (n)2nd fl blcny & stair to rear yd. 9sf court infill 2nd fl. relocate 1st fl mech equip. full seismic upgrd of bldg. rmdl entry hall at level 1. relocate garage door. | $450,000 |
| Oct 3, 2023 | Never finaled issued Oct 2023, no final | 210 27th St | repair of the top of an (e) concrete retaining wall (about 2ft wide) at exterior wall not part of dwelling.Details
repair of the top of an (e) concrete retaining wall (about 2ft wide) at exterior wall not part of dwelling. | $2,000 |