Randall B Stockwell
- Listed as
- architect
- Firm
- Randall B. Stockwell Aia
- On San Francisco permits
- Apr 2012 to Jan 2019
9 permits since 2000 (architect on 9 permits): 8 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 10, 2019 | Never finaled issued Jan 2019, no final | 765 Market St | Black Mountain Development | #36f -new plm fix, tile, counter, tibs appl. new cabintry, pocket doors. trim & moulding. new recessed light fix, modernized shades. new hardwood floors and carpet and tile. new paint/wallpaper throughout. remove mstr bedrm opening, remove kit pony wall, remove ceiling projector/screen & wood panelDetails
#36f -new plm fix, tile, counter, tibs appl. new cabintry, pocket doors. trim & moulding. new recessed light fix, modernized shades. new hardwood floors and carpet and tile. new paint/wallpaper throughout. remove mstr bedrm opening, remove kit pony wall, remove ceiling projector/screen & wood panel | $650,000 |
| Jun 29, 2018 | Completed final sign-off May 2019 | 2121 Webster St | Black Mountain Development | unit #608 remove non structural walls as noted and referenced/ replace 3 decorative light fixtures. finish carpentry, repaint entire unit. remove hall bathtub, cap plumbing, use area as a storage closet. tile and hardwood repairs. install audio/video system maher naDetails
unit #608 remove non structural walls as noted and referenced/ replace 3 decorative light fixtures. finish carpentry, repaint entire unit. remove hall bathtub, cap plumbing, use area as a storage closet. tile and hardwood repairs. install audio/video system maher na | $55,000 |
| Jun 20, 2014 | Completed final sign-off May 2015 | 188 Minna St | Black Mountain Development | #28f - new vanity, backsplashes, countertops & faces, sinks, faucets. replace door jambs, add soffit, valances, pocket door, wall for pocket door. new hardwood flooring & paint throughout. new recessed & track lighting thruout. add whisper fan, hot water dispenser/filter.Details
#28f - new vanity, backsplashes, countertops & faces, sinks, faucets. replace door jambs, add soffit, valances, pocket door, wall for pocket door. new hardwood flooring & paint throughout. new recessed & track lighting thruout. add whisper fan, hot water dispenser/filter. | $150,000 |
| Apr 8, 2014 | Completed final sign-off Sep 2014 | 999 Green St | Black Mountain Development | dry wall repair. tile repair, addl lighting, and painting.Details
dry wall repair. tile repair, addl lighting, and painting. | $45,000 |
| Jan 15, 2014 | Completed final sign-off Jan 2016 | 765 Market St | Black Mountain Development | soft demo pocket door installation, sheetrock, paint to matchDetails
soft demo pocket door installation, sheetrock, paint to match | $50,000 |
| Sep 11, 2013 | Completed final sign-off Oct 2014 | 188 Minna St | Black Mountain Development | unit #26f-interior renovation of (e) condo unit including: kitchen- remove high seperation wall, new countertops & backsplash. paint, plaster or wall covering all locations. change several (e) doors to pocket doors. new light fixtures, ceiling fans, cover plates, switches throughoutDetails
unit #26f-interior renovation of (e) condo unit including: kitchen- remove high seperation wall, new countertops & backsplash. paint, plaster or wall covering all locations. change several (e) doors to pocket doors. new light fixtures, ceiling fans, cover plates, switches throughout | $98,000 |
| Jan 23, 2013 | Completed final sign-off Sep 2013 | 188 Minna St | Black Mountain Development | unit #25f - remove and replace: 2 bathrooms, hardwoos floor, kitchen counter. install:pocket doors, drop ceilings, soffit, recess lighting, cabinetry, medicine cabinets, mirrors, stone finishes. sprinklers separate permitDetails
unit #25f - remove and replace: 2 bathrooms, hardwoos floor, kitchen counter. install:pocket doors, drop ceilings, soffit, recess lighting, cabinetry, medicine cabinets, mirrors, stone finishes. sprinklers separate permit | $165,000 |
| Apr 6, 2012 | Completed final sign-off Jun 2012 | 188 Minna St | Black Mountain Development | #23e - remove (e) lighting for new elect system, remove closet door & wall to expand opening @ master closet. install nw track lighting in living rm and bedrms, install new electrical outlet in bdrm and closet, install new closet system in mstr of entry closets, install new motorized shades,Details
#23e - remove (e) lighting for new elect system, remove closet door & wall to expand opening @ master closet. install nw track lighting in living rm and bedrms, install new electrical outlet in bdrm and closet, install new closet system in mstr of entry closets, install new motorized shades, | $95,000 |
| Apr 6, 2012 | Completed final sign-off Jul 2012 | 301 Mission St | Black Mountain Development | #40-b -remove extg lighting for replacement, remove (e) carpet, replace (e) ceiling fans, drop living room soffit to allow for new recessed lighting, add new lighting in living rm. kitchens, bathrms, hallways. remove fire safety system permits by others. paint, new hardwd @ bedrms, repair drywall.Details
#40-b -remove extg lighting for replacement, remove (e) carpet, replace (e) ceiling fans, drop living room soffit to allow for new recessed lighting, add new lighting in living rm. kitchens, bathrms, hallways. remove fire safety system permits by others. paint, new hardwd @ bedrms, repair drywall. | $80,000 |