Patrick (Padraig) Gavin
- Listed as
- authorized agent-others, contractor
- Firm
- Gavin Construction Inc
- Based in
- South San Francisco
- On San Francisco permits
- Dec 2022 to Jun 2026
19 permits since 2000 (contractor on 19 permits, authorized agent-others on 2 permits): 15 completed, 3 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 2, 2026 | Completed final sign-off Jun 2026 | 423 Waller St | Gavin Construction Inc | to obtain final inspection for work approved under pa# 202011027977. all work is complete.Details
to obtain final inspection for work approved under pa# 202011027977. all work is complete. | |
| Mar 2, 2026 | Completed final sign-off May 2026 | 1375 18th Av | Gavin Construction Inc | unit# 4: kitchen and bath remodel (work in-kind). electrical upgrade (panel).Details
unit# 4: kitchen and bath remodel (work in-kind). electrical upgrade (panel). | $20,000 |
| Dec 23, 2025 | Completed final sign-off Aug 2026 | 554 Natoma St | Gavin Construction Inc | unit a: replace 14 windows with new vinyl windows, street facing.Details
unit a: replace 14 windows with new vinyl windows, street facing. | $12,000 |
| Dec 9, 2025 | Completed final sign-off Jun 2026 | 554 Natoma St | Gavin Construction Inc | unit a: remodel of kitchen and two bathrooms. no structual work, update electrical and plumbing, new gas lie for furnace.Details
unit a: remodel of kitchen and two bathrooms. no structual work, update electrical and plumbing, new gas lie for furnace. | $35,000 |
| Nov 7, 2025 | Completed final sign-off May 2026 | 1201 Shrader St | Gavin Construction Inc | bathroom renovation: remove and repplace existing baseboard, tiles, shower, bathtub, bidet toilet, shower valve, fixtures. remove jacuzzi feature in tub. insall new shwer door panel, ceiling lights, extractor fan. install double sink in vanity.Details
bathroom renovation: remove and repplace existing baseboard, tiles, shower, bathtub, bidet toilet, shower valve, fixtures. remove jacuzzi feature in tub. insall new shwer door panel, ceiling lights, extractor fan. install double sink in vanity. | $30,000 |
| Sep 29, 2025 | Completed final sign-off Jan 2026 | 2313 Jones St | Gavin Construction Inc | remove all crown plaster molding in living & dining r. insulate all exterior perimeter walls. install sheetrock to all walls & ceiling spaces where plaster was removed. joint tape & joint compound to all walls & celings. install new baseboard.Details
remove all crown plaster molding in living & dining r. insulate all exterior perimeter walls. install sheetrock to all walls & ceiling spaces where plaster was removed. joint tape & joint compound to all walls & celings. install new baseboard. | $8,000 |
| Aug 22, 2025 | Completed final sign-off Aug 2025 | 2033 Leavenworth St | Gavin Construction Inc | like in kind repair to the parapet wall, repair is less than 10%. non structual repair, remove all the stucco 10-12 inches on the parapet wall above the weep screed. install new plastic weep screed. install a new water resistent barrier, one scratch coat and two coats of stucco. approx. 38 sq ft.Details
like in kind repair to the parapet wall, repair is less than 10%. non structual repair, remove all the stucco 10-12 inches on the parapet wall above the weep screed. install new plastic weep screed. install a new water resistent barrier, one scratch coat and two coats of stucco. approx. 38 sq ft. | $9,900 |
| Aug 15, 2025 | In progress issued Aug 2025 | 301 Masonic Av | Gavin Construction Inc | dryrot repair per on-site inspections report #1974 items 9a and 10a. 9a: 3rd fl: remove approx. 16 sq ft of walkable roof membrane and repair subroof in kind. re-install membrane. 10a: (2nd floor) repair approx. 80 sq ft of dry-rotted framing in kind at window. re-cover wall with sheet rock in kind.Details
dryrot repair per on-site inspections report #1974 items 9a and 10a. 9a: 3rd fl: remove approx. 16 sq ft of walkable roof membrane and repair subroof in kind. re-install membrane. 10a: (2nd floor) repair approx. 80 sq ft of dry-rotted framing in kind at window. re-cover wall with sheet rock in kind. | $18,000 |
| May 19, 2025 | In progress issued Oct 2025 | 2508 Bush St | Gavin Construction Inc | rear bldg, 2508 a bush st 1st fl - existing brick foundation replacement; addition of new bedroom and bathroom; 2nd fl - new staircasew to connect 1st and 2nd fl; existing bathroom remodelDetails
rear bldg, 2508 a bush st 1st fl - existing brick foundation replacement; addition of new bedroom and bathroom; 2nd fl - new staircasew to connect 1st and 2nd fl; existing bathroom remodel | $80,000 |
| Jul 12, 2024 | In progress issued Aug 2024 | 1246 Filbert St | Gavin Construction Inc | installation of new 400 a service and 3 electrical meters accessible from garage roof. new access gate 7" max above middle step and flat roofDetails
installation of new 400 a service and 3 electrical meters accessible from garage roof. new access gate 7" max above middle step and flat roof | $10,000 |
| Oct 18, 2023 | Completed final sign-off Mar 2024 | 5322 California St | Gavin Construction Inc | section 4a on report by on site inspection 09/21/23 - repair to porch and steps (less than 50% of steps damaged). see report section 4a only (in kind repair)Details
section 4a on report by on site inspection 09/21/23 - repair to porch and steps (less than 50% of steps damaged). see report section 4a only (in kind repair) | $8,500 |
| Sep 8, 2023 | Completed final sign-off Oct 2023 | 3644 24th St | Gavin Construction Inc | reduced permit #202307061593 4a- fungus damage stair framing rear stairs and rail members 11c- fundamge support beam repair left of rear corner 11e- fungus damaged plywood upper unit exit doorDetails
reduced permit #202307061593 4a- fungus damage stair framing rear stairs and rail members 11c- fundamge support beam repair left of rear corner 11e- fungus damaged plywood upper unit exit door | $11,374 |
| Jul 6, 2023 | Completed final sign-off Oct 2023 | 3644 24th St | Gavin Construction Inc | repairs according to report #1564 dated 6/20/23 by onsite inspection. sections 1a, 4a; 5a, 10c, 11a, 11b, 11c, 11d, 11e, 11g. no structural changers to building, repairs only.Details
repairs according to report #1564 dated 6/20/23 by onsite inspection. sections 1a, 4a; 5a, 10c, 11a, 11b, 11c, 11d, 11e, 11g. no structural changers to building, repairs only. | $16,050 |
| Apr 26, 2023 | Completed final sign-off Dec 2023 | 17 San Pablo Av | Gavin Construction Inc | installation of new garage door (wooden door) mdxDetails
installation of new garage door (wooden door) mdx | $3,550 |
| Mar 24, 2023 | Completed final sign-off Dec 2023 | 17 San Pablo Av | Gavin Construction Inc | repair damaged dry rot - stucco & wood damaged & will be repaired according to the attached termite report by onsite inspectionDetails
repair damaged dry rot - stucco & wood damaged & will be repaired according to the attached termite report by onsite inspection | $23,000 |
| Mar 9, 2023 | Completed final sign-off Jul 2023 | 1426 48th Av | Gavin Construction Inc | remove damaged stucco and repair to dryrot area. at the front and right side of the house - repair- replace same less than 50% exploratory work as dry rot is found.- in kindDetails
remove damaged stucco and repair to dryrot area. at the front and right side of the house - repair- replace same less than 50% exploratory work as dry rot is found.- in kind | $9,000 |
| Mar 9, 2023 | Completed final sign-off Aug 2023 | 2728 Golden Gate Av | Gavin Construction Inc | replace 5 windows at the front of the house with the windows exactly same as existing windows. windows to be wood hung windows.Details
replace 5 windows at the front of the house with the windows exactly same as existing windows. windows to be wood hung windows. | $5,000 |
| Feb 10, 2023 | Never finaled issued Feb 2023, no final | 3819 Divisadero St | Gavin Construction Inc | unit #5: remove exisitng cabinets doors, replace counter top- replace sink install new sink and garbage disposal install new floor, replace lights and in fan bathroom, replace bath tub, vanity, sink and install new fan, shower valve. no structural work.Details
unit #5: remove exisitng cabinets doors, replace counter top- replace sink install new sink and garbage disposal install new floor, replace lights and in fan bathroom, replace bath tub, vanity, sink and install new fan, shower valve. no structural work. | $18,000 |
| Dec 14, 2022 | Completed final sign-off Aug 2023 | 2728 Golden Gate Av | Gavin Construction Inc | replace less than 50% of front wood staircase in-kind due to dry-rot.Details
replace less than 50% of front wood staircase in-kind due to dry-rot. | $5,000 |