Pozner Zachary & Dera-Jill L
- Listed as
- architect
- Firm
- Pozner Architecture & Design
- On San Francisco permits
- Dec 2015 to May 2022
11 permits since 2000 (architect on 11 permits): 7 completed, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 16, 2022 | Completed final sign-off Oct 2023 | 3865 19th St | Stricklin Construciton | unit 2: revision to permit # 202111172601. revised storage room to a dry saunaDetails
unit 2: revision to permit # 202111172601. revised storage room to a dry sauna | $5,000 |
| Jan 14, 2022 | Completed final sign-off Oct 2023 | 3865 19th St | Stricklin Construciton | revision to issued permit# 2021-1117-2601. replace existing rotted deck framing in kind. revised height of exterior retaining wall and add structural design.Details
revision to issued permit# 2021-1117-2601. replace existing rotted deck framing in kind. revised height of exterior retaining wall and add structural design. | |
| Feb 2, 2021 | Completed final sign-off Jan 2022 | 1101 Green St | Nob Hill Construction | revision to pa 201911086850. revise wall layout.Details
revision to pa 201911086850. revise wall layout. | |
| Dec 23, 2020 | Completed final sign-off Jun 2021 | 1200 California St | Nob Hill Construction | unit 16a: revision to no plan pa 202010136372. enlarge master closet at master bedroom. renovate (e) kitchen. modify coat closet and living room wall. renovate (e) guest and master baths.Details
unit 16a: revision to no plan pa 202010136372. enlarge master closet at master bedroom. renovate (e) kitchen. modify coat closet and living room wall. renovate (e) guest and master baths. | $150,000 |
| Sep 30, 2020 | Never finaled issued Dec 2021, no final | 244 16th Av | interior/exterior renovation and rear horizontal expansion of (e) 4 bedrm, 2.5 bath sfh to a 5-bedrm, 4.5 bath with a new rear deck. seismic upgrades. replace windows/doors/roof/interior stair/skylights. (n) sprinkler system under separate permit.Details
interior/exterior renovation and rear horizontal expansion of (e) 4 bedrm, 2.5 bath sfh to a 5-bedrm, 4.5 bath with a new rear deck. seismic upgrades. replace windows/doors/roof/interior stair/skylights. (n) sprinkler system under separate permit. | $500,000 | |
| Dec 19, 2019 | Expired or cancelled withdrawn Aug 2021 | 1618 Fulton St | demo: kitchen, partial load-bearing wall & posts, exterior doors, laundry, relocate kitchen, living, dining, laundry. add: clearspan joist, moments frame, door & windows. new electrical wiring, rough plumbing, finishes & fixtures.Details
demo: kitchen, partial load-bearing wall & posts, exterior doors, laundry, relocate kitchen, living, dining, laundry. add: clearspan joist, moments frame, door & windows. new electrical wiring, rough plumbing, finishes & fixtures. | $50,000 | |
| Nov 8, 2019 | Completed final sign-off Jan 2022 | 1101 Green St | Nob Hill Construction | full remodel to include new flooring and paint, new kitchen cabinets and appliances, new bathroom cabinets and finishes, new led lgihting throughout. no structural work.Details
full remodel to include new flooring and paint, new kitchen cabinets and appliances, new bathroom cabinets and finishes, new led lgihting throughout. no structural work. | $350,000 |
| Oct 17, 2017 | Completed final sign-off Sep 2019 | 1177 California St | remove (1) non-load bearing interior wall between (2) dwelling units. patch & repair flooring & ceiling to match (e).Details
remove (1) non-load bearing interior wall between (2) dwelling units. patch & repair flooring & ceiling to match (e). | $8,000 | |
| Dec 30, 2016 | Expired or cancelled withdrawn Nov 2021 | 3865 19th St | unit #2: build out (e) ground floor shell space; entry foyer, bathroom, wine storage, office, nedia room,gym, mechanical roomsDetails
unit #2: build out (e) ground floor shell space; entry foyer, bathroom, wine storage, office, nedia room,gym, mechanical rooms | $100,000 | |
| Aug 22, 2016 | Completed final sign-off Dec 2018 | 730 Lyon St | unit legalize per ord 43-14 on first floor, formerly storage. fire sprinkler under separate permit.Details
unit legalize per ord 43-14 on first floor, formerly storage. fire sprinkler under separate permit. | $30,000 | |
| Dec 30, 2015 | Never finaled issued Jul 2017, no final | 1177 California St | Avila & Wadlington Contractors Inc | revision to 201505267146: new contractor and architect from previous plans. this permit is to document the as-built conditions of unit #329. pa 2015-0526-7146 was issued and received a final inspection. however no permit was issued to document the changes to the layout of unit and replacement ofDetails
revision to 201505267146: new contractor and architect from previous plans. this permit is to document the as-built conditions of unit #329. pa 2015-0526-7146 was issued and received a final inspection. however no permit was issued to document the changes to the layout of unit and replacement of | $90,000 |