Pieter Colenbrander
- License
- 14738
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- On San Francisco permits
- May 2022 to Aug 2022
3 permits since 2000 (engineer on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Skyline Construction
- Architects
- Lisa Gelfand (3)
- Engineers
- Ronald M Blue (3)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 2, 2022 | Completed final sign-off Mar 2023 | 447 Minna St | Skyline Construction | revision to pa#202205234784. reconfigure bathroom. no change to number of plumbing fixtures.Details
revision to pa#202205234784. reconfigure bathroom. no change to number of plumbing fixtures. | |
| Jun 24, 2022 | Completed final sign-off Mar 2023 | 447 Minna St | commercial t.i. including kitchenette (sink, cabinet only). finishes + hvac on 3/f. add hvac on 1/f.Details
commercial t.i. including kitchenette (sink, cabinet only). finishes + hvac on 3/f. add hvac on 1/f. | $165,000 | |
| May 23, 2022 | Completed final sign-off Mar 2023 | 447 Minna St | 2nd fl - commercial ti inc - ada bathroom; kitchenette (only sinks and cabinets) and finishes only sinks and cabinetsDetails
2nd fl - commercial ti inc - ada bathroom; kitchenette (only sinks and cabinets) and finishes only sinks and cabinets | $135,000 |