Peter Van Dine
- Listed as
- architect, engineer
- Firm
- Studio 3ida
- Based in
- Sausalito
- On San Francisco permits
- Jul 2005 to Jul 2019
9 permits since 2000 (architect on 8 permits, engineer on 1 permit): 5 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 1, 2019 | Expired or cancelled expired May 2025 | 505 Howard St | Skyline Construction | additions of new private offices on flrs 8-10Details
additions of new private offices on flrs 8-10 | $350,000 |
| Aug 9, 2017 | Completed final sign-off Dec 2017 | 315 Montgomery St | Bcci Construction Company | 13th fl: accessibility upgrades of the 13th fl mens and womens multiple accomodation toilet rooms. there will be no change in occupancy, no change in floor area.Details
13th fl: accessibility upgrades of the 13th fl mens and womens multiple accomodation toilet rooms. there will be no change in occupancy, no change in floor area. | $61,074 |
| Aug 9, 2017 | Completed final sign-off Feb 2018 | 315 Montgomery St | Bcci Construction Company | 17th fl: demolition of existing non-structural door and windows. new construction of 2 non-structural roof deck, planters, doors, and lighting added to the existing roof of the unoccupied 17th fl (previously 16th fl) no change in occupancy. maher naDetails
17th fl: demolition of existing non-structural door and windows. new construction of 2 non-structural roof deck, planters, doors, and lighting added to the existing roof of the unoccupied 17th fl (previously 16th fl) no change in occupancy. maher na | $75,192 |
| Nov 13, 2006 | Completed final sign-off Feb 2007 | 1940 Broadway | remove (e) linoleum flooring in 7th floor foyer. replace w/ new stone. the floor is occupied by a single unit.Details
remove (e) linoleum flooring in 7th floor foyer. replace w/ new stone. the floor is occupied by a single unit. | $5,000 | |
| Mar 6, 2006 | Expired or cancelled expired Jan 2007 | 1940 Broadway | remodel (e) master bathroom & dressing room. no change in connected electrical loads.no exterior work.Details
remodel (e) master bathroom & dressing room. no change in connected electrical loads.no exterior work. | $25,000 | |
| Sep 20, 2005 | Expired or cancelled cancelled Jun 2009 | 755 Ashbury St | Mario Sarmento | glaze seven (e) arch openings on exterior wall of loggia. loggia is more than 50% enclosed. no changDetails
glaze seven (e) arch openings on exterior wall of loggia. loggia is more than 50% enclosed. no chang | $25,000 |
| Aug 17, 2005 | Completed final sign-off Dec 2005 | 1638 Post St | to erect electric single faced sign.Details
to erect electric single faced sign. | ||
| Aug 2, 2005 | Expired or cancelled expired Feb 2007 | 455 Mariposa St | convert (e) mezz to 2nd floor by add new floor (996 sf) inside (e) volume. new mech, plumbing &Details
convert (e) mezz to 2nd floor by add new floor (996 sf) inside (e) volume. new mech, plumbing & | $75,000 | |
| Jul 26, 2005 | Completed final sign-off Aug 2007 | 140 San Leandro Wy | horizontal addition- reconfigure roof over (e) sunroom, add deck to rear of house, remodel bathroomsDetails
horizontal addition- reconfigure roof over (e) sunroom, add deck to rear of house, remodel bathrooms | $180,000 |