Pak Yat Lee
- Listed as
- architect
- Firm
- Sedes Architecture
- Based in
- Milbrae
- On San Francisco permits
- Apr 2008 to Jan 2026
36 permits since 2000 (architect on 36 permits): 15 completed, 3 in progress, 5 never finaled, 13 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 13, 2026 | In progress issued Jun 2026 | 39 Sussex St | Fides Construction Inc. | add 2 (n) roof dormers on 3rd flr; interior remodel throughout all flrs; relocate kitchen and 2 (e) bathrooms; add a (n) powder room on 2nd flr; add a wet bar on 1st flr; create (n) interior connections between all 3 flrs; build a (n) rear deck on 1st flr.Details
add 2 (n) roof dormers on 3rd flr; interior remodel throughout all flrs; relocate kitchen and 2 (e) bathrooms; add a (n) powder room on 2nd flr; add a wet bar on 1st flr; create (n) interior connections between all 3 flrs; build a (n) rear deck on 1st flr. | $200,000 |
| Nov 24, 2025 | In progress issued Nov 2025 | 2109 Taraval St | Fides Construction Inc. | interior tenant improvement includes - remodel two ada restrooms. apply new paint and wall finishes on existing wall. grind and polish existing concrete floor.Details
interior tenant improvement includes - remodel two ada restrooms. apply new paint and wall finishes on existing wall. grind and polish existing concrete floor. | $30,000 |
| Feb 3, 2025 | Expired or cancelled expired Aug 2026 | 1828 29th Av | Fides Construction Inc. | revision to pa 202407226960 add new skylight. relocate two new skylights. modify the location of plumbing fixtures in the bath on 2nd fl. remodel the kitchenDetails
revision to pa 202407226960 add new skylight. relocate two new skylights. modify the location of plumbing fixtures in the bath on 2nd fl. remodel the kitchen | $25,000 |
| Dec 30, 2024 | In progress issued Feb 2025 | 39 Sussex St | Fides Construction Inc. | maintenance of property - exterior: repair and replace damaged siding and new deck at rear of the building.Details
maintenance of property - exterior: repair and replace damaged siding and new deck at rear of the building. | $8,000 |
| Jul 22, 2024 | Completed final sign-off Aug 2026 | 1828 29th Av | Fides Construction Inc. | 1st fl interior additions - bedroom & bathroom; 2nd fl interior remodel, enclose exterior stairs lightwell & bathroom lightwellDetails
1st fl interior additions - bedroom & bathroom; 2nd fl interior remodel, enclose exterior stairs lightwell & bathroom lightwell | $150,000 |
| Jul 31, 2023 | Completed final sign-off Sep 2025 | 567 45th Av | North Star Plumbing & Development Inc | 1st fl. horizontal addition, enclose (e) lightwell, complete interior remodel, add media room and bathoom on 1st fl. add full bath and half bathroom on 2nd fl.Details
1st fl. horizontal addition, enclose (e) lightwell, complete interior remodel, add media room and bathoom on 1st fl. add full bath and half bathroom on 2nd fl. | $300,000 |
| Feb 23, 2023 | Completed final sign-off Apr 2023 | 458 Pope St | revision to building permit 202102195049, changing the front landscaping to complete with pg&e meter.Details
revision to building permit 202102195049, changing the front landscaping to complete with pg&e meter. | $500 | |
| Apr 11, 2022 | Never finaled filed Apr 2022, never issued | 88 Stanford Heights Av | North Star Plumbing & Development Inc | complete remodel: remove kitchen floor to open below one enclosed lightwlal on 2/f. add kitchen and bathroom on g/f. add office, batrhoom and living room in (e) crawl space. remove stgairs at rear deck and infill with new deck.Details
complete remodel: remove kitchen floor to open below one enclosed lightwlal on 2/f. add kitchen and bathroom on g/f. add office, batrhoom and living room in (e) crawl space. remove stgairs at rear deck and infill with new deck. | $120,000 |
| Jun 21, 2019 | Expired or cancelled expired Jun 2024 | 4121 19th Av | Fides Construction Inc. | add 2 bedrooms, 2 bathrooms,office. use 5/8 type "x" drywall on ceiling and walls.Details
add 2 bedrooms, 2 bathrooms,office. use 5/8 type "x" drywall on ceiling and walls. | $60,000 |
| May 2, 2019 | Expired or cancelled expired Nov 2025 | 139 Sweeny St | Fides Construction Inc., T & W Construction Co Inc | to comply w/ complaints# 2015007000enf,2017015975prj,2017015977prj,20171133870,201711133867,201540932,201540913,201051068. legalize (e) unauthorized extension on 3rd flr per ndpor dated 2/27/18.Details
to comply w/ complaints# 2015007000enf,2017015975prj,2017015977prj,20171133870,201711133867,201540932,201540913,201051068. legalize (e) unauthorized extension on 3rd flr per ndpor dated 2/27/18. | $3,000 |
| Jul 11, 2018 | Never finaled issued Jul 2018, no final | 110 09th Av | Fides Construction Inc. | revision to pa 2018-0515-9097, add structural support at kitchenDetails
revision to pa 2018-0515-9097, add structural support at kitchen | $9,000 |
| May 15, 2018 | Completed final sign-off Aug 2019 | 110 09th Av | Fides Construction Inc. | kitchen remodel, half bath relocation on 2nd fl. master bath remodel, 2nd bath relocation on 3rd fl. window rpelacement rear only, replace all lath & plaster w/type "x" drywall on 2nd & 3rd fl. 200 amp electrical upgrade. electrical rewiring.Details
kitchen remodel, half bath relocation on 2nd fl. master bath remodel, 2nd bath relocation on 3rd fl. window rpelacement rear only, replace all lath & plaster w/type "x" drywall on 2nd & 3rd fl. 200 amp electrical upgrade. electrical rewiring. | $200,000 |
| Nov 13, 2017 | Expired or cancelled expired Nov 2025 | 139 Sweeny St | Fides Construction Inc., T & W Construction Co Inc | comply with complaint #201401781, #201553991, #201707841, #201710651 & #201712982. legalize one dwelling unit at 3rd flr per ord no 43-14. legalize as buit fl plans to approved bp# 200509062134 and removeDetails
comply with complaint #201401781, #201553991, #201707841, #201710651 & #201712982. legalize one dwelling unit at 3rd flr per ord no 43-14. legalize as buit fl plans to approved bp# 200509062134 and remove | $5,000 |
| Nov 13, 2017 | Expired or cancelled expired Nov 2025 | 139 Sweeny St | Fides Construction Inc., T & W Construction Co Inc | add one adu at 1st flr per ord no 162-16 under this permit. second unit legalized under app #2017-1113-3867.Details
add one adu at 1st flr per ord no 162-16 under this permit. second unit legalized under app #2017-1113-3867. | $15,000 |
| Aug 23, 2017 | Expired or cancelled expired Sep 2025 | 630 Precita Av | Fides Construction Inc. | add (n) unit. 1st unit on 1st fl & 2nd unit on 2nd & 3rd fl. horizontal addition on 1st & 2nd fl. vertical addition - 3rd fl. complete interior remodel. demolish (e) floor framing on 2nd fl. windows replacement all sides.Details
add (n) unit. 1st unit on 1st fl & 2nd unit on 2nd & 3rd fl. horizontal addition on 1st & 2nd fl. vertical addition - 3rd fl. complete interior remodel. demolish (e) floor framing on 2nd fl. windows replacement all sides. | $495,000 |
| Jul 25, 2017 | Completed final sign-off Mar 2018 | 265 Hester Av | Best Forever Construction Company | 1st fl: relocate bath, convert storage to office and media, and two alum slider windows and wood door on first floor, rear only. (n) wd siding to match (e) wd sidings. - patchwork only.Details
1st fl: relocate bath, convert storage to office and media, and two alum slider windows and wood door on first floor, rear only. (n) wd siding to match (e) wd sidings. - patchwork only. | $60,000 |
| Feb 14, 2017 | Completed final sign-off Sep 2018 | 128 Corona St | Fides Construction Inc. | remodel existing kitchen, bathroom, laundry, add one full bath & one 1/2 bath, windows replacement at sides & rear building.Details
remodel existing kitchen, bathroom, laundry, add one full bath & one 1/2 bath, windows replacement at sides & rear building. | $110,000 |
| Nov 30, 2015 | Expired or cancelled cancelled Jan 2026 | 107 Sagamore St | Fides Construction Inc. | interior remodel on 2/f only, add and modify (e) bedrooms and add a storage room on 2/f. n/a ordinance #155-13Details
interior remodel on 2/f only, add and modify (e) bedrooms and add a storage room on 2/f. n/a ordinance #155-13 | $50,000 |
| Sep 10, 2015 | Completed final sign-off Jul 2016 | 667 45th Av | replace (e) egress stair.Details
replace (e) egress stair. | $20,000 | |
| Dec 9, 2014 | Never finaled filed Dec 2014, never issued | 519 Kansas St | permit #201207306008; upgrade (e) front facade (west); add (n) property line windows @ side facade (north)Details
permit #201207306008; upgrade (e) front facade (west); add (n) property line windows @ side facade (north) | $80,000 | |
| Oct 24, 2014 | Completed final sign-off Jan 2018 | 519 Kansas St | revised pa#201207306008 1/f, 2/f & 3/f layout. remove all existing interior partition wall on 2/f, revise & replace (e) roof deck's structure.Details
revised pa#201207306008 1/f, 2/f & 3/f layout. remove all existing interior partition wall on 2/f, revise & replace (e) roof deck's structure. | $10,000 | |
| Oct 8, 2014 | Completed final sign-off Dec 2014 | 2480 Mission St | Threemile Construction | #331 & #332: comply to complaint# 201495751 interior t.i. remodel clinic office, provide (n) seperation walls between #331 & 332 at original location, provide (n) partition walls at original location in #331 & 332, provide (n) ada doors at new treatment rooms.Details
#331 & #332: comply to complaint# 201495751 interior t.i. remodel clinic office, provide (n) seperation walls between #331 & 332 at original location, provide (n) partition walls at original location in #331 & 332, provide (n) ada doors at new treatment rooms. | $15,000 |
| Sep 22, 2014 | Expired or cancelled expired Dec 2017 | 956 Valencia St | Fides Construction Inc. | interior t.i. for retail - install (n) ada cashier counter & display system.Details
interior t.i. for retail - install (n) ada cashier counter & display system. | $20,000 |
| May 17, 2013 | Expired or cancelled cancelled Dec 2013 | 2151 Lombard St | Fides Construction Inc. | interior tenant improvement (medical service establishment), new massage establishment includes: 6 treatment rooms, (n) ada restroom, (n) ada shower, (n) ada steam shower, no work at (e) entry, restroom and storage and no structural work.Details
interior tenant improvement (medical service establishment), new massage establishment includes: 6 treatment rooms, (n) ada restroom, (n) ada shower, (n) ada steam shower, no work at (e) entry, restroom and storage and no structural work. | $80,000 |
| Dec 5, 2012 | Never finaled issued Jun 2013, no final | 2612 Sutter St | revise & change work scope of pa#201205301417. add study, family room, bathroom, interior stairs, patior and exterior stair on basement level. remodel & modify (e) layout of living room, dining room & kitchen on 1st & 2nd floor add rear deck. add windows on rear and left side of building.Details
revise & change work scope of pa#201205301417. add study, family room, bathroom, interior stairs, patior and exterior stair on basement level. remodel & modify (e) layout of living room, dining room & kitchen on 1st & 2nd floor add rear deck. add windows on rear and left side of building. | $150,000 | |
| Aug 20, 2012 | Completed final sign-off Jul 2013 | 222 Roosevelt Wy | Fides Construction Inc. | interior remodel: add one (n) master bathroom, remodel (e) kitchen, bathroom and bedrooms. replace (e) rotted siding around the house. replace (e) lath and plaster with 5/8" type x gyp bd on wall & ceiling window & doors replacement.Details
interior remodel: add one (n) master bathroom, remodel (e) kitchen, bathroom and bedrooms. replace (e) rotted siding around the house. replace (e) lath and plaster with 5/8" type x gyp bd on wall & ceiling window & doors replacement. | $80,000 |
| May 30, 2012 | Never finaled issued Jun 2012, no final | 2612 Sutter St | window replacement in front of building. interior remodel for unit on 1st & 2nd floor. replace (e) lath & plaster with 5/8 type x gyp board. max u-factor .40Details
window replacement in front of building. interior remodel for unit on 1st & 2nd floor. replace (e) lath & plaster with 5/8 type x gyp board. max u-factor .40 | $60,000 | |
| Jun 24, 2011 | Completed final sign-off Nov 2012 | 2979 Lake St | Fides Construction Inc. | interior remodel on 2nd floor work includes:rearrange the layout of bedrooms, bathroom and study on 2nd floor. replace extg lath and plaster with gyp bd. for wall and ceiling on 2nd floor.new structural work for rearrangement.Details
interior remodel on 2nd floor work includes:rearrange the layout of bedrooms, bathroom and study on 2nd floor. replace extg lath and plaster with gyp bd. for wall and ceiling on 2nd floor.new structural work for rearrangement. | $100,000 |
| Apr 22, 2011 | Completed final sign-off Nov 2011 | 147 Milton St | Fides Construction Inc. | complete interior remodel on 1st floor and 2nd floor. add new study and new bathroom on 2nd floor. replace extg lath and plaster with gyp board. new mechanical, plmg and electrical throughout.Details
complete interior remodel on 1st floor and 2nd floor. add new study and new bathroom on 2nd floor. replace extg lath and plaster with gyp board. new mechanical, plmg and electrical throughout. | $46,000 |
| Jan 14, 2011 | Expired or cancelled expired Oct 2014 | 119 Corona St | 369 Construction | add new bathroom on 1st floor.no work on 2nd floor.Details
add new bathroom on 1st floor.no work on 2nd floor. | $10,000 |
| Jun 23, 2010 | Completed final sign-off Apr 2012 | 122 Escolta Wy | master bedroom additin, one story. legalize existing power room, replace existing fence.Details
master bedroom additin, one story. legalize existing power room, replace existing fence. | $80,000 | |
| Jul 24, 2009 | Expired or cancelled cancelled Mar 2020 | 673 26th Av | demolition of an existing 2-story, sfd ( rear building)Details
demolition of an existing 2-story, sfd ( rear building) | $12,000 | |
| Jul 24, 2009 | Expired or cancelled cancelled Mar 2020 | 671 26th Av | demolish existing 1-story , sfd ( front building)Details
demolish existing 1-story , sfd ( front building) | $8,000 | |
| Jul 24, 2009 | Expired or cancelled cancelled Mar 2020 | 671 26th Av | new construction of a 3-story, 2 dwelling unit building.Details
new construction of a 3-story, 2 dwelling unit building. | $900,000 | |
| Jun 9, 2008 | Completed final sign-off Apr 2010 | 715 Victoria St | Fides Construction Inc. | horizontal addtion/add new bathroom and closet at new addition/remodel extg bathroom on 1st floor -------conversion to full building permit as of 08/22/08--------Details
horizontal addtion/add new bathroom and closet at new addition/remodel extg bathroom on 1st floor -------conversion to full building permit as of 08/22/08-------- | $60,000 |
| Apr 21, 2008 | Completed final sign-off Feb 2009 | 618 Precita Av | Fides Construction Inc. | remodel e kitchen. add new bath on the 2nd floor. remodel e bathroom. add insulation and replace e gyp bd at envelope of conditioned space on 2nd floor. new hardwood floor, paint job.Details
remodel e kitchen. add new bath on the 2nd floor. remodel e bathroom. add insulation and replace e gyp bd at envelope of conditioned space on 2nd floor. new hardwood floor, paint job. | $40,000 |