Antje Paiz
- Listed as
- architect, authorized agent-others
- Firm
- Raumfabrik
- Based in
- Berkeley
- On San Francisco permits
- Mar 2015 to Sep 2026
52 permits since 2000 (architect on 52 permits, authorized agent-others on 1 permit): 29 completed, 13 in progress, 6 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress issued Oct 2026 | 514 Clipper St | S C B Pro Builders | interior remodel of 2nd floor unit including replacing three windows on the east side, adding built ins at living room, modifying (e) skylight, adding new skylight.Details
interior remodel of 2nd floor unit including replacing three windows on the east side, adding built ins at living room, modifying (e) skylight, adding new skylight. | $160,000 |
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 145 Jordan Av | T T General Construction | full house remodel with rear addition at all levels, adding a total of 465 sf of floor area. no changes to front facade- slight expansion andd deckDetails
full house remodel with rear addition at all levels, adding a total of 465 sf of floor area. no changes to front facade- slight expansion andd deck | $1,100,000 |
| Sep 17, 2026 | In progress issued Sep 2026 | 410 Vienna St | Greenport Construction Inc | interior remodel of bathroom #1 on 2nd floor, construction of miscellaneous non-bearing walls, installation of new skylight and perform associated ceiling and roof framing.Details
interior remodel of bathroom #1 on 2nd floor, construction of miscellaneous non-bearing walls, installation of new skylight and perform associated ceiling and roof framing. | $60,000 |
| Sep 16, 2026 | In progress issued Sep 2026 | 410 Vienna St | revision to pa#202606102930 & 201802131186 to reflect actual work done in basement(per inspector). room is now called "office"(used as an office) and a door leads directly to garage.Details
revision to pa#202606102930 & 201802131186 to reflect actual work done in basement(per inspector). room is now called "office"(used as an office) and a door leads directly to garage. | ||
| Aug 6, 2026 | In progress filed Aug 2026, not yet issued | 34 St Marys Av | first floor horizozntal addition (increase of 131sq ft of habitable living space). second floor vertical addition (increase of 681 sq ft of habitable living space). rear patio replacement. interior remodel.Details
first floor horizozntal addition (increase of 131sq ft of habitable living space). second floor vertical addition (increase of 681 sq ft of habitable living space). rear patio replacement. interior remodel. | $480,000 | |
| May 14, 2026 | In progress issued May 2026 | 401 Montecito Av | Hearth Corporation | convert 1358 sf at lower floor storage area into living space to include 2 bedrooms, bathroom, living room with 2 burner kitchenette and laundry room with internal connection to upper floor. remodel storage and mech spaceDetails
convert 1358 sf at lower floor storage area into living space to include 2 bedrooms, bathroom, living room with 2 burner kitchenette and laundry room with internal connection to upper floor. remodel storage and mech space | $400,000 |
| Mar 13, 2026 | In progress issued Mar 2026 | 1269 05th Av | Schrobsdorff Construction | revision to #202507020073 - window changes + new skylight. addition of shoe cabinetDetails
revision to #202507020073 - window changes + new skylight. addition of shoe cabinet | |
| Feb 25, 2026 | Completed final sign-off May 2026 | 503 Hugo St | T T General Construction | g/f -convert (e) closet to half bath, replace 1 rear facing window in e) openingDetails
g/f -convert (e) closet to half bath, replace 1 rear facing window in e) opening | $14,000 |
| Dec 23, 2025 | In progress issued Dec 2025 | 367 16th Av | O'brien Contracting Inc | revision 202507080325- replace 2 windows in kind at 1st floor garage not facing street. and (n) door, replace landing and planting area and 2 stair steps at rear yard at grade.Details
revision 202507080325- replace 2 windows in kind at 1st floor garage not facing street. and (n) door, replace landing and planting area and 2 stair steps at rear yard at grade. | |
| Jul 15, 2025 | In progress issued Nov 2025 | 1269 05th Av | Schrobsdorff Construction | remodel of 2 unit bldg with 450 squre foot additon at 1st and 2nd floor(unit 1269) and 94 square foot additon at 3rd floor(unit 1271)Details
remodel of 2 unit bldg with 450 squre foot additon at 1st and 2nd floor(unit 1269) and 94 square foot additon at 3rd floor(unit 1271) | $700,000 |
| Jul 8, 2025 | In progress issued Oct 2025 | 367 16th Av | O'brien Contracting Inc | new 1st floor wine cellar. 2nd floor kitchen remodel. 2nd floor fireplace remodel. no exterior change and no new conditioned space.Details
new 1st floor wine cellar. 2nd floor kitchen remodel. 2nd floor fireplace remodel. no exterior change and no new conditioned space. | $117,000 |
| Jun 24, 2025 | In progress issued Feb 2026 | 2762 21st St | Wilko Builders Llc. | remodel of entire house and a 2nd story addition with front and rear roof decks on 2nd level.Details
remodel of entire house and a 2nd story addition with front and rear roof decks on 2nd level. | $650,000 |
| Apr 22, 2025 | Completed final sign-off Nov 2025 | 2938 Pierce St | Hearth Corporation | rev 202409160848: changes to layout, deck & basement framing.Details
rev 202409160848: changes to layout, deck & basement framing. | |
| Feb 7, 2025 | Completed final sign-off Sep 2025 | 1267 28th Av | Hearth Corporation | 3-story horizontal addition at rear for new elevator shaft. remodel laundry areaDetails
3-story horizontal addition at rear for new elevator shaft. remodel laundry area | $150,000 |
| May 16, 2024 | In progress filed May 2024, not yet issued | 146 Elsie St | T T General Construction | whole house remodel. backyard remodel w/ new deck 30" above grade. modifications to two bay windows exempt from 311 notification per municipal code section 136. addition at 2nd floor/ rear 2nd floor deckDetails
whole house remodel. backyard remodel w/ new deck 30" above grade. modifications to two bay windows exempt from 311 notification per municipal code section 136. addition at 2nd floor/ rear 2nd floor deck | $300,000 |
| Feb 9, 2024 | In progress filed Feb 2024, not yet issued | 64 Divisadero St | reconstruction of legal non-conforming deck in disrepair as permitted by planning code sec 181.6.4 sructural alterations required to reinforce the struture to meet the standards for seismic loads and forces of the building codeDetails
reconstruction of legal non-conforming deck in disrepair as permitted by planning code sec 181.6.4 sructural alterations required to reinforce the struture to meet the standards for seismic loads and forces of the building code | $25,000 | |
| Jan 18, 2024 | Completed final sign-off Aug 2024 | 40 Loraine Ct | Palacios Construction | one new window on front facade, wood frame window. new man door (fiberglass french door) at side of garage.Details
one new window on front facade, wood frame window. new man door (fiberglass french door) at side of garage. | $2,000 |
| Dec 19, 2023 | Completed final sign-off Aug 2024 | 40 Loraine Ct | Palacios Construction | g/f: convert 404sf of garage into living space to create a new mudroom, a bedroom, a bathroom and a study. 2/f: convert one full bath and one half bath into 2 full bathrooms.Details
g/f: convert 404sf of garage into living space to create a new mudroom, a bedroom, a bathroom and a study. 2/f: convert one full bath and one half bath into 2 full bathrooms. | $120,000 |
| Nov 15, 2023 | Completed final sign-off Apr 2025 | 619 Baker St | Hearth Corporation | remodel lower unnit (first flr) with new deck less than 30" above grade.Details
remodel lower unnit (first flr) with new deck less than 30" above grade. | $145,000 |
| Nov 3, 2023 | Completed final sign-off Apr 2025 | 621 Baker St | Hearth Corporation | revision to permit# 202304195985: changes to layout and addition of 2nd dormer meeting 311 notification exception.new front elevction windows will be double hung wood windows with integrated and new door with transom and casement wood window.Details
revision to permit# 202304195985: changes to layout and addition of 2nd dormer meeting 311 notification exception.new front elevction windows will be double hung wood windows with integrated and new door with transom and casement wood window. | $20,000 |
| Jun 8, 2023 | Completed final sign-off Jul 2023 | 259 Eureka St | Bradford Construction | revision to pa 2020-0824-2495 unit 259a build out 65 sf storage room under entry stairs; unit 259 move laundry from 4th fl to 3rd fl; change to attic access hatch configuration; change to landing layout; replace builtin planter box w/free standing plantersDetails
revision to pa 2020-0824-2495 unit 259a build out 65 sf storage room under entry stairs; unit 259 move laundry from 4th fl to 3rd fl; change to attic access hatch configuration; change to landing layout; replace builtin planter box w/free standing planters | $10,000 |
| Apr 21, 2023 | Completed final sign-off Dec 2023 | 3474 16th St | Hearth Corporation | hall bath, laundry room, primary bedroom and office remodel, new primary bathroom, new side windows in lightwell, new ducting.Details
hall bath, laundry room, primary bedroom and office remodel, new primary bathroom, new side windows in lightwell, new ducting. | $120,000 |
| Apr 7, 2023 | Completed final sign-off Jan 2024 | 218 Miguel St | T T General Construction | revision to pa# 202205275172, partial foundation replacement instead of full.Details
revision to pa# 202205275172, partial foundation replacement instead of full. | |
| Mar 9, 2023 | Never finaled filed Mar 2023, never issued | 1333 12th Av | unit# 1333: remodel & rear addition to result in 2 bedrm, 1 bath unit w/ 215 sq sf increase in living space. unit# 1335: remodel & rear addition to result in 4 bedrm, 3 bath unit w/ 184 sq sf increase in living space. new 244 sq ft deck and stair.Details
unit# 1333: remodel & rear addition to result in 2 bedrm, 1 bath unit w/ 215 sq sf increase in living space. unit# 1335: remodel & rear addition to result in 4 bedrm, 3 bath unit w/ 184 sq sf increase in living space. new 244 sq ft deck and stair. | $350,000 | |
| Jan 20, 2023 | Completed final sign-off Jun 2023 | 260 Romain St | Hearth Corporation | rev to pa202208170699: basement remodel: finish out new bathroom, kitchentte and den. 1/f remodel: relcoate primary bathroom & closet. (no burner @ kitchenette)Details
rev to pa202208170699: basement remodel: finish out new bathroom, kitchentte and den. 1/f remodel: relcoate primary bathroom & closet. (no burner @ kitchenette) | $30,000 |
| Jan 6, 2023 | Completed final sign-off Jan 2023 | 366 Chenery St | T T General Construction | revision to pa#202102134653. change to backyard fence height and new 29" retaining wall. change to mudroom/wc/storage layout, & single faucet at master bath. no shower at 3rd floor bath. square off landin at back yard stairs. no new trash enclosureDetails
revision to pa#202102134653. change to backyard fence height and new 29" retaining wall. change to mudroom/wc/storage layout, & single faucet at master bath. no shower at 3rd floor bath. square off landin at back yard stairs. no new trash enclosure | |
| Nov 3, 2022 | Completed final sign-off Jan 2025 | 64 Divisadero St | T T General Construction | convert unfinished 1st floor to living space, incl, 2 new bedrooms + hall bath convert (e) bedroom in to new dining room and 2nd flr remodel (e) 2nd floor bathrm. new int stair @ existing light well. no work on 3rd and 4th flrsDetails
convert unfinished 1st floor to living space, incl, 2 new bedrooms + hall bath convert (e) bedroom in to new dining room and 2nd flr remodel (e) 2nd floor bathrm. new int stair @ existing light well. no work on 3rd and 4th flrs | $200,000 |
| Oct 21, 2022 | Expired or cancelled withdrawn Mar 2023 | 72 Harper St | 1st fl: no work. 2nd fl: rebuild breakfast nook, rebuild front stairs. 3rd fl: remodel & addition, with new balcony off primary bedroom.Details
1st fl: no work. 2nd fl: rebuild breakfast nook, rebuild front stairs. 3rd fl: remodel & addition, with new balcony off primary bedroom. | $195,000 | |
| Aug 25, 2022 | Never finaled issued Sep 2022, no final | 72 Harper St | Bradford Construction | rec to pa 202201115724 new 1st floor bedroom and family room, 2nd floor interior remodel, new hardscape, replace fau with heat pump.Details
rec to pa 202201115724 new 1st floor bedroom and family room, 2nd floor interior remodel, new hardscape, replace fau with heat pump. | $200,000 |
| Aug 17, 2022 | Completed final sign-off Jun 2023 | 260 Romain St | Hearth Corporation | rev to pa202008222424: use stucco instead of wood siding for rear facade. relocate new deck in rear yard less than 3ft above grade. rough plumbing for future baths & wetbar.Details
rev to pa202008222424: use stucco instead of wood siding for rear facade. relocate new deck in rear yard less than 3ft above grade. rough plumbing for future baths & wetbar. | |
| Aug 8, 2022 | Never finaled issued Aug 2023, no final | 115 Gennessee St | Hearth Corporation | 1st and 2nd floor horizontal addition, interior remodel. new backyard hardscape.Details
1st and 2nd floor horizontal addition, interior remodel. new backyard hardscape. | $125,000 |
| Jun 23, 2022 | Expired or cancelled cancelled Jan 2026 | 542 Natoma St | address correction from building permit 202001212375Details
address correction from building permit 202001212375 | ||
| May 27, 2022 | Completed final sign-off Jan 2024 | 218 Miguel St | T T General Construction | 1st fl - remodeling including new family room, bath and bedroom; replace (e) brick foundationDetails
1st fl - remodeling including new family room, bath and bedroom; replace (e) brick foundation | $175,000 |
| May 13, 2022 | Completed final sign-off Feb 2023 | 1274 Guerrero St | Douglas Gower Dba Mesa Construction | interior remodel of 2/f bathroom / hallway. remodel of 3/f primary bedroom & bathroom.Details
interior remodel of 2/f bathroom / hallway. remodel of 3/f primary bedroom & bathroom. | $60,000 |
| May 4, 2022 | Completed final sign-off Jan 2023 | 1382 06th Av | Ideal Builders | 2nd fl remodel including remodeled kitchen & relocated half bath, and removal of (e) fire place. 3rd fl interior remodel including remodeled bathroom, new primary bathroom & closet. replace 4 windows (front facing) windows & rear patio door.Details
2nd fl remodel including remodeled kitchen & relocated half bath, and removal of (e) fire place. 3rd fl interior remodel including remodeled bathroom, new primary bathroom & closet. replace 4 windows (front facing) windows & rear patio door. | $200,000 |
| Apr 12, 2022 | Completed final sign-off Aug 2023 | 164 Delmar St | Beam Construction Enterprises Inc | new garage door 4 side door. new heat pump. remodel master suite and hall bath. resurface (e) roof deck. insulate attic replace skylights, re-roof. solar panels under seperate permitDetails
new garage door 4 side door. new heat pump. remodel master suite and hall bath. resurface (e) roof deck. insulate attic replace skylights, re-roof. solar panels under seperate permit | $95,000 |
| Feb 25, 2022 | Completed final sign-off Apr 2023 | 1980 Scott St | Hearth Corporation | interior remodel: replacement of interior stair, kitchen remodel, master bath remodel, new half bath. replace exterior doors and siding at 1/f in back. no changes to front facade.Details
interior remodel: replacement of interior stair, kitchen remodel, master bath remodel, new half bath. replace exterior doors and siding at 1/f in back. no changes to front facade. | $175,000 |
| Jan 28, 2022 | Never finaled issued Feb 2022, no final | 115 Gennessee St | Hearth Corporation | replace foundation. reloate laundry on 1st fl. remodel (e) 3rd fl bathroom.Details
replace foundation. reloate laundry on 1st fl. remodel (e) 3rd fl bathroom. | $75,000 |
| Jan 11, 2022 | Never finaled issued Jan 2022, no final | 72 Harper St | Bradford Construction | 1st floor: convert unfinished basement to living space, bathrom, and storage, replace foundation, replace extg stair to second floor. 2nd floor: remove walls per plans, new closet at bedroom 1, new bifold doors.Details
1st floor: convert unfinished basement to living space, bathrom, and storage, replace foundation, replace extg stair to second floor. 2nd floor: remove walls per plans, new closet at bedroom 1, new bifold doors. | $250,000 |
| Dec 2, 2021 | Expired or cancelled withdrawn Oct 2025 | 619 Baker St | basement level remodel of main residence including foundation repairs to create legal access to new adu.Details
basement level remodel of main residence including foundation repairs to create legal access to new adu. | $100,000 | |
| Dec 2, 2021 | Expired or cancelled withdrawn Oct 2025 | 619 Baker St | to demolish an unconditioned accessory structure (308 sqft) at rear of lot.Details
to demolish an unconditioned accessory structure (308 sqft) at rear of lot. | $1,000 | |
| Nov 3, 2021 | Completed final sign-off Jan 2025 | 160 Cresta Vista Dr | O Donoghue Construction Inc. | horizontal & vertical addition to add a new story below the (e) lower floor & extend the building into the rear yard at all levels.Details
horizontal & vertical addition to add a new story below the (e) lower floor & extend the building into the rear yard at all levels. | $650,000 |
| Jun 15, 2021 | Completed final sign-off Jul 2023 | 256 Mullen Av | Jose Martinez | new roof deck with internal stair at rear unit. new roof deck for front unit above garage.Details
new roof deck with internal stair at rear unit. new roof deck for front unit above garage. | $50,000 |
| Mar 30, 2021 | Completed final sign-off Mar 2022 | 720 03rd Av | T T General Construction | 3/f: hall bath and bedroom closets remodel, new master bath. 2/f: kitchen, vestibule and half bath remodel.Details
3/f: hall bath and bedroom closets remodel, new master bath. 2/f: kitchen, vestibule and half bath remodel. | $115,000 |
| Mar 4, 2021 | Completed final sign-off Jun 2021 | 3129 Mission St | revision to pa# 202009043553 (no new sink; alt guardrail detail; revisions to light fixture locations)Details
revision to pa# 202009043553 (no new sink; alt guardrail detail; revisions to light fixture locations) | ||
| Mar 12, 2020 | Completed final sign-off Jul 2023 | 259 Eureka St | Bradford Construction | demolition of past rear addition, interior remodel of 2nd & 3rd floors with minor additon within building envelope, new windows and doors in rear no change to front facadeDetails
demolition of past rear addition, interior remodel of 2nd & 3rd floors with minor additon within building envelope, new windows and doors in rear no change to front facade | $350,000 |
| Dec 6, 2018 | Completed final sign-off Dec 2019 | 200 Madrid St | T T General Construction | (n) 2-story spiral stair to rear yard. (n) window @ rear facade.Details
(n) 2-story spiral stair to rear yard. (n) window @ rear facade. | $25,000 |
| Jan 24, 2017 | Completed final sign-off Feb 2019 | 1279 Fitzgerald Av | T T General Construction | to erect 2 stories, no basement, type v-b, single family dwelling.Details
to erect 2 stories, no basement, type v-b, single family dwelling. | $385,000 |
| Jan 19, 2016 | Completed final sign-off Jul 2017 | 892 Ashbury St | Hearth Corporation | (n)attic dormer, skylights, & windows on east (rear) elev. extend ridge to east facade & remove collar ties. replace back brick chimney w/ (n)wood frames chimney enclosure & steel flue from 3rd flr up.Details
(n)attic dormer, skylights, & windows on east (rear) elev. extend ridge to east facade & remove collar ties. replace back brick chimney w/ (n)wood frames chimney enclosure & steel flue from 3rd flr up. | $25,000 |
| Oct 29, 2015 | Completed final sign-off Apr 2017 | 263 29th St | Carroll Commercial Inc | raise roof over laundry room at rear expanding mstr bedroom roof deck above by 59 s.f. install new transome windows at kitchen & new franch doors from mstr bedroom to roof deck.Details
raise roof over laundry room at rear expanding mstr bedroom roof deck above by 59 s.f. install new transome windows at kitchen & new franch doors from mstr bedroom to roof deck. | $25,000 |
| Mar 19, 2015 | Never finaled issued Jan 2016, no final | 130 San Buenaventura Wy | Pirman Construction | replace windows. (2) (n) exterior stairs from 1st fl to back yard. 81 sf laundry room addition at 2nd flDetails
replace windows. (2) (n) exterior stairs from 1st fl to back yard. 81 sf laundry room addition at 2nd fl | $70,000 |
| Mar 3, 2015 | Completed final sign-off Dec 2016 | 3303 Folsom St | T T General Construction | remodel of upper unit at 4th fl; 3rd fl, 125 sq ft back addition w/ equal size reduction of deck, new spiral stair; 4th fl, 115 sq ft addition master suite, expend roof deck by 169 sq ft. the size of usable attic space is to increase by 63 sq ft.Details
remodel of upper unit at 4th fl; 3rd fl, 125 sq ft back addition w/ equal size reduction of deck, new spiral stair; 4th fl, 115 sq ft addition master suite, expend roof deck by 169 sq ft. the size of usable attic space is to increase by 63 sq ft. | $95,000 |