Philip Dagostino
- License
- C8267
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect, authorized agent-others, pmt consultant/expediter
- Firm
- Sgpa Architecture & Planning
- Based in
- San Francisco
- On San Francisco permits
- Feb 2005 to Apr 2010
7 permits since 2000 (architect on 5 permits, authorized agent-others on 1 permit, pmt consultant/expediter on 1 permit): 7 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Gci, Inc (2), Gold Medallion Inc. (2), Ward Alan Emery Construction Inc. (2)
- Engineers
- Dan Bech (2), David Auch, Stephen M. Glatt
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 12, 2010 | Completed final sign-off Nov 2010 | 77 Ofarrell St | Ward Alan Emery Construction Inc. | construction of a closure wall to enable abandonement of approx 1400 sf of existing building area located in the basement beneath the sidewalk and outside the property line. no change in use. tenant improvements under seperate permit.Details
construction of a closure wall to enable abandonement of approx 1400 sf of existing building area located in the basement beneath the sidewalk and outside the property line. no change in use. tenant improvements under seperate permit. | $250,000 |
| Apr 12, 2010 | Completed final sign-off Nov 2010 | 2 Stockton St | Ward Alan Emery Construction Inc. | construction of a closure wall to enable abandonment of approx 1800 sf of (e) building area located in the basement beneath the sidewalk & outside the property line. new gas meter roots new fire service line connection. no change in use.Details
construction of a closure wall to enable abandonment of approx 1800 sf of (e) building area located in the basement beneath the sidewalk & outside the property line. new gas meter roots new fire service line connection. no change in use. | $350,000 |
| Jul 21, 2009 | Completed final sign-off Nov 2009 | 10 United Nations Pz | Gci, Inc | structural t.i. work to fill in pit & floor at existing elevator shaft and add raised concrete slab over existing slab on grade. please refer to application 200904136135.Details
structural t.i. work to fill in pit & floor at existing elevator shaft and add raised concrete slab over existing slab on grade. please refer to application 200904136135. | $10,000 |
| May 29, 2009 | Completed final sign-off Aug 2009 | 1569 Sloat Bl | Gold Medallion Inc. | suite #300-interior office tenant improvement of (e) office building. remove 3 walls, new suspended ceiling in 1 office, new carpet & paint. new doors & hardware. electrical & low voltageDetails
suite #300-interior office tenant improvement of (e) office building. remove 3 walls, new suspended ceiling in 1 office, new carpet & paint. new doors & hardware. electrical & low voltage | $111,000 |
| Jul 25, 2008 | Completed final sign-off Mar 2009 | 3981 Alemany Bl | landlord improvements of an (e) retail space, sub-dividing into 3 small spaces. adding non-structural interior partitions. m.e.p seperate permitDetails
landlord improvements of an (e) retail space, sub-dividing into 3 small spaces. adding non-structural interior partitions. m.e.p seperate permit | $10,000 | |
| Oct 30, 2006 | Completed final sign-off Jan 2007 | 1569 Sloat Bl | Gold Medallion Inc. | interior tenant improvement for an (e) 2,197 s.f. second floor demised space. work involves demolition of walls and other building system components and some new partitions, mechanical, electrical and plumbing work.Details
interior tenant improvement for an (e) 2,197 s.f. second floor demised space. work involves demolition of walls and other building system components and some new partitions, mechanical, electrical and plumbing work. | $110,000 |
| Feb 1, 2005 | Completed final sign-off Mar 2005 | 185 Berry St | Gci, Inc | oti-2 5/f me, elDetails
oti-2 5/f me, el | $35,000 |