Regina Marie Regan
- Listed as
- authorized agent-others, contractor
- Firm
- Regan Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2022 to Sep 2026
10 permits since 2000 (contractor on 10 permits, authorized agent-others on 1 permit): 6 completed, 3 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2026 | In progress issued Sep 2026 | 208 Union St | Regan Construction | repairs and adding automatic gate opener to (e) fence and cate, previously approved and built under pa 201404234002. gate visible from street.Details
repairs and adding automatic gate opener to (e) fence and cate, previously approved and built under pa 201404234002. gate visible from street. | $15,000 |
| Sep 2, 2026 | In progress issued Sep 2026 | 1490 Francisco St | Regan Construction | unit #5-partial bathroom remodel, new shower surround tile, new vanity, floor tile and toilet remain unchanged.Details
unit #5-partial bathroom remodel, new shower surround tile, new vanity, floor tile and toilet remain unchanged. | $5,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 1490 Francisco St | Regan Construction | unit 2-kitchen and bathroom remodel in kind. no wall removal or layout change. to include replace toilet, faucet and tub in kind.Details
unit 2-kitchen and bathroom remodel in kind. no wall removal or layout change. to include replace toilet, faucet and tub in kind. | $25,000 |
| Mar 26, 2026 | Completed final sign-off Jul 2026 | 34 Bennington St | Regan Construction | to obtain final inspection for work approved under 200710256436. all work is completeDetails
to obtain final inspection for work approved under 200710256436. all work is complete | |
| Mar 23, 2026 | Completed final sign-off Aug 2026 | 1570 Green St | Regan Construction | partial remodel of (1) bathroom: new bathroom sink, toilet, and laundry.Details
partial remodel of (1) bathroom: new bathroom sink, toilet, and laundry. | $10,000 |
| Mar 3, 2026 | Completed final sign-off Apr 2026 | 1572 Green St | Regan Construction | remodel 2 bathrooms, new toilet, vanity, shower valves, tiles. replace nob and tubes, new kitchen countertops, sink and faucet.Details
remodel 2 bathrooms, new toilet, vanity, shower valves, tiles. replace nob and tubes, new kitchen countertops, sink and faucet. | $30,000 |
| Jan 20, 2026 | Completed final sign-off Jul 2026 | 34 Bennington St | Regan Construction | fl1: partial bathroom remodel (toilet, vanity/faucet, shower valve). throughout house: upgrade elec. and replace sheet rock(5/8x) in kind @ select demo (for electrical): 1st fl: office, 2nd fl: living and dining room. 3rd fl: bedroom. approx 300 sq ft for all sheet rock replacement.new sub-panel fl1Details
fl1: partial bathroom remodel (toilet, vanity/faucet, shower valve). throughout house: upgrade elec. and replace sheet rock(5/8x) in kind @ select demo (for electrical): 1st fl: office, 2nd fl: living and dining room. 3rd fl: bedroom. approx 300 sq ft for all sheet rock replacement.new sub-panel fl1 | $18,000 |
| Dec 15, 2025 | Completed final sign-off Apr 2026 | 1501 Howard St | Regan Construction | to comply with nov 2025-46552 to remove 1/fl non structural infill partitions, remove dropped ceiling, remove illegally installed hvac system, return space back to its pre-illegal construction condition.Details
to comply with nov 2025-46552 to remove 1/fl non structural infill partitions, remove dropped ceiling, remove illegally installed hvac system, return space back to its pre-illegal construction condition. | $15,000 |
| Sep 2, 2025 | Completed final sign-off Oct 2025 | 4076 24th St | Regan Construction | rear stair repair, less than 50%, ceiling repair at 4078 24th st, less than 40 sq ft. replace 1 kitchen cabinet, sink and faucet at 4076 24th street. to comply with nov #202536671 item #2,#3, & #5Details
rear stair repair, less than 50%, ceiling repair at 4078 24th st, less than 40 sq ft. replace 1 kitchen cabinet, sink and faucet at 4076 24th street. to comply with nov #202536671 item #2,#3, & #5 | $15,000 |
| Dec 5, 2022 | Never finaled issued Dec 2022, no final | 2649 Mission St | Regan Construction | 2/flr apt# 1: interior remodel- 1080sqft that will include kitchen & bathroom remodel, new mini split, new tankless water heater. no exterior work.Details
2/flr apt# 1: interior remodel- 1080sqft that will include kitchen & bathroom remodel, new mini split, new tankless water heater. no exterior work. | $50,000 |