Nana Koami
- Listed as
- architect
- Firm
- Koami Architecture
- Based in
- Oakland
- On San Francisco permits
- Jan 2019 to Apr 2021
4 permits since 2000 (architect on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 21, 2021 | Completed final sign-off Jul 2022 | 85 Midcrest Wy | Alward Const. Co Inc A Ca Corp | revision to pa 20181206757 with following scope: 3 new non street facing fenestrations to be replaced in kind at (e) openings due to damage. 2 fenestration size reduced compared to originally approved. minor framing change at rear wall, floor/ceiling and exterior steps. 1 window removed.Details
revision to pa 20181206757 with following scope: 3 new non street facing fenestrations to be replaced in kind at (e) openings due to damage. 2 fenestration size reduced compared to originally approved. minor framing change at rear wall, floor/ceiling and exterior steps. 1 window removed. | |
| May 6, 2019 | Completed final sign-off Jan 2020 | 408 Sanchez St | Initial Construction | replace 5 windows on fron wall in kind; raise sill of (3) windows on upper level, create new sill to match (e), repair/apply painted wood siding to match (e)Details
replace 5 windows on fron wall in kind; raise sill of (3) windows on upper level, create new sill to match (e), repair/apply painted wood siding to match (e) | $40,000 |
| Jan 31, 2019 | Completed final sign-off Jan 2020 | 408 Sanchez St | Initial Construction | kitchen remodel: new kitchen. remove 1 int. wall between din & kitchen. bathrm remodel per plan. add 2 skylights. enclose (e) int. opening between living & bedrm. new closet. add a sink in toilet room. window replacements. remove fireplace. new furnace, water heater, light & elec per plan.Details
kitchen remodel: new kitchen. remove 1 int. wall between din & kitchen. bathrm remodel per plan. add 2 skylights. enclose (e) int. opening between living & bedrm. new closet. add a sink in toilet room. window replacements. remove fireplace. new furnace, water heater, light & elec per plan. | $150,000 |
| Jan 18, 2019 | Completed final sign-off Jul 2022 | 85 Midcrest Wy | G C Builders | add (1) bath, closet & family room under (e) bldg portion that is elevated from ground by column. add interior stair. add an exterior door, guard-height wall & steps on the side of the proposed addition. add gates.Details
add (1) bath, closet & family room under (e) bldg portion that is elevated from ground by column. add interior stair. add an exterior door, guard-height wall & steps on the side of the proposed addition. add gates. | $150,000 |