Moses Huang
- Listed as
- authorized agent-others, engineer
- Firm
- Mha Consultant
- Based in
- Sunnyvale
- On San Francisco permits
- Dec 2004 to Sep 2026
10 permits since 2000 (engineer on 9 permits, authorized agent-others on 1 permit): 3 completed, 2 in progress, 1 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 3, 2026 | In progress issued Sep 2026 | 2293 Powell St | Sandbank Construction, Inc | foundation work compacted fill and backfilling, pured in place concrete and masonaryDetails
foundation work compacted fill and backfilling, pured in place concrete and masonary | $50,000 |
| Jun 27, 2024 | In progress issued Sep 2024 | 3321 Pierce St | West Coast Builders | gr fl remodel (1) bathroom, create (1) new bathroom, relocate hallway, widening garage door and expand garage, eliminate main door. 2nd fl fireplace, guardrail @ deck, panoramic door. remove spiral staircase, remodel bath #3. 3rd fl no work.Details
gr fl remodel (1) bathroom, create (1) new bathroom, relocate hallway, widening garage door and expand garage, eliminate main door. 2nd fl fireplace, guardrail @ deck, panoramic door. remove spiral staircase, remodel bath #3. 3rd fl no work. | $150,000 |
| Mar 21, 2024 | Expired or cancelled withdrawn Sep 2026 | 2293 Powell St | Sandbank Construction, Inc | build retaining wall, fence wall, and fillDetails
build retaining wall, fence wall, and fill | $30,000 |
| Dec 3, 2021 | Expired or cancelled withdrawn Jun 2024 | 3321 Pierce St | ground floor: new extension to (e) garage within overhead door. remodel bath #1, (n) bath#2, (n) panoramic doors in bedrooms 1 &2; 2nd fl - (n) gas fireplace in living & family room; (n) panoramic door; 3rd fl -(n) door to deck#3, (n) extension @ top of stairsDetails
ground floor: new extension to (e) garage within overhead door. remodel bath #1, (n) bath#2, (n) panoramic doors in bedrooms 1 &2; 2nd fl - (n) gas fireplace in living & family room; (n) panoramic door; 3rd fl -(n) door to deck#3, (n) extension @ top of stairs | $200,000 | |
| Apr 12, 2016 | Expired or cancelled expired Feb 2019 | 3239 17th St | Anco Construction Company | revision to appl #201304305791 - reduce scope of work to miimize structure change form the current permit. for each unit on the 3rd floor, relcoate kitchen location, add one bedroom each to both unit 3239-a & 3239-b.Details
revision to appl #201304305791 - reduce scope of work to miimize structure change form the current permit. for each unit on the 3rd floor, relcoate kitchen location, add one bedroom each to both unit 3239-a & 3239-b. | |
| Aug 27, 2014 | Completed final sign-off Nov 2014 | 110 Santa Clara Av | Green Metro Inc | revision to structural and calcs for basement plan and 1st floor framing plan. revise a connection for beam detail. rererence: pa# 2013-1230-5175 & pa# 2014-0723-2006.Details
revision to structural and calcs for basement plan and 1st floor framing plan. revise a connection for beam detail. rererence: pa# 2013-1230-5175 & pa# 2014-0723-2006. | |
| May 29, 2012 | Completed final sign-off Aug 2012 | 1388 Gough St | Kd General Construction Inc | unit #703 - to remove upper cabinet & install new breakfast bar, install 1 pocket door at laundry room/closet, install hardwood floor in living room.Details
unit #703 - to remove upper cabinet & install new breakfast bar, install 1 pocket door at laundry room/closet, install hardwood floor in living room. | $12,000 |
| Apr 5, 2012 | Expired or cancelled expired Feb 2019 | 3239 17th St | interior update and remodel of 3rd floor. relocate kitchen and bath. window replacement on 2nd and 3rd floor in kind. no addition, no exterior change.Details
interior update and remodel of 3rd floor. relocate kitchen and bath. window replacement on 2nd and 3rd floor in kind. no addition, no exterior change. | $50,000 | |
| Nov 23, 2010 | Completed final sign-off Dec 2012 | 2955 26th St | Camarina Construction Corp | comply with nov# 200565040. remove illegal unit per plans. legalize rooms & bathroom @ ground floor. interior remodel & horizontal addition @ new corner of building.Details
comply with nov# 200565040. remove illegal unit per plans. legalize rooms & bathroom @ ground floor. interior remodel & horizontal addition @ new corner of building. | $75,000 |
| Dec 29, 2004 | Never finaled issued Sep 2005, no final | 1056 Haight St | erect a four story two unit dwellingDetails
erect a four story two unit dwelling | $500,000 |