Permit GraphShortlistSan Francisco building permits since 2000

Milton Tong

License
C29254
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect
Firm
Mak Studio
Based in
San Francisco
On San Francisco permits
Jul 2006 to Aug 2015

8 permits since 2000 (architect on 8 permits): 8 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Royal Lyon Construction (2), H M W Development Inc, Jason Liu Construction Company, Kenneally Construction, Mac Naughton Builder, Inc.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 21, 2015Completed
final sign-off Jul 2016
239 Maynard Stlegalization of existing unauthorized "in law" dwelling unit per ordinance 43-14
Details
Permit
201508214997
Permit issued
Feb 16, 2016
Final sign-off
Jul 28, 2016

legalization of existing unauthorized "in law" dwelling unit per ordinance 43-14

Open the permit page

$9,650
Oct 27, 2014Completed
final sign-off Jan 2018
955 Natoma StRoyal Lyon Constructionvertical addition: 4th floor lounge addition. compliance w/ ordinance no. 155-13 is not required. ref pa# 2013/07/26/2927.
Details
Permit
201410270009
Permit issued
Mar 4, 2016
Final sign-off
Jan 8, 2018

vertical addition: 4th floor lounge addition. compliance w/ ordinance no. 155-13 is not required. ref pa# 2013/07/26/2927.

Open the permit page

$80,000
May 9, 2014Completed
final sign-off Feb 2018
556 28th StKenneally Constructionadditions & renovations incl: rear yard horizontal addition, vertical addition of a 3rd flr level(add 3 bedrms 3 baths); conversion of garage to a garage & add 1 bedrm 1 bath & fam rm) interior remodel throughout.add powder room @ 2nd level
Details
Permit
201405095328
Permit issued
Feb 10, 2016
Final sign-off
Feb 13, 2018

additions & renovations incl: rear yard horizontal addition, vertical addition of a 3rd flr level(add 3 bedrms 3 baths); conversion of garage to a garage & add 1 bedrm 1 bath & fam rm) interior remodel throughout.add powder room @ 2nd level

Open the permit page

$700,000
May 8, 2014Completed
final sign-off May 2019
2237 Union StH M W Development Inchorizontal addition & remodel. wk incl add elevator, rebuild in-kind previously (e) conical roof over (e)turret, repair/replace (e)siding, cornice & detail at front facade. horizontal addition at rear,(n)media room & bathroom at 1/fl, rebuild (e) int.stairs, new bathroom at 4/fl & new roof terrace.
Details
Permit
201405085281
Permit issued
Mar 2, 2016
Final sign-off
May 30, 2019

horizontal addition & remodel. wk incl add elevator, rebuild in-kind previously (e) conical roof over (e)turret, repair/replace (e)siding, cornice & detail at front facade. horizontal addition at rear,(n)media room & bathroom at 1/fl, rebuild (e) int.stairs, new bathroom at 4/fl & new roof terrace.

Open the permit page

$1,000,000
Jul 26, 2013Completed
final sign-off Jan 2018
955 Natoma StRoyal Lyon Constructionchange of use from f-1 to r-3. 3rd floor vertical addition. 1st & 2nd floors alteration. ** maher: compliance with ordinance no# 155-13 not required **
Details
Permit
201307262927
Permit issued
Feb 13, 2015
Final sign-off
Jan 8, 2018

change of use from f-1 to r-3. 3rd floor vertical addition. 1st & 2nd floors alteration. ** maher: compliance with ordinance no# 155-13 not required **

Open the permit page

$350,000
Mar 1, 2013Completed
final sign-off Nov 2015
562 28th StJason Liu Construction Companyerect three story single family dwelling.
Details
Permit
201303011275
Permit issued
Mar 7, 2014
Final sign-off
Nov 10, 2015

erect three story single family dwelling.

Open the permit page

$650,000
Mar 1, 2013Completed
final sign-off Jun 2014
562 28th Stdemolish 1 story single family.
Details
Permit
201303011285
Permit issued
Mar 7, 2014
Final sign-off
Jun 9, 2014

demolish 1 story single family.

Open the permit page

$10,000
Jul 5, 2006Completed
final sign-off Sep 2006
943 Pacific AvMac Naughton Builder, Inc.remove (e) exterior back stair & repair in-kind.
Details
Permit
200607055694
Permit issued
Jul 5, 2006
Final sign-off
Sep 12, 2006

remove (e) exterior back stair & repair in-kind.

Open the permit page

$14,000