Milton Tong
- Listed as
- architect
- Firm
- Mak Studio
- Based in
- San Francisco
- On San Francisco permits
- Jul 2006 to Aug 2015
8 permits since 2000 (architect on 8 permits): 8 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 21, 2015 | Completed final sign-off Jul 2016 | 239 Maynard St | legalization of existing unauthorized "in law" dwelling unit per ordinance 43-14Details
legalization of existing unauthorized "in law" dwelling unit per ordinance 43-14 | $9,650 | |
| Oct 27, 2014 | Completed final sign-off Jan 2018 | 955 Natoma St | Royal Lyon Construction | vertical addition: 4th floor lounge addition. compliance w/ ordinance no. 155-13 is not required. ref pa# 2013/07/26/2927.Details
vertical addition: 4th floor lounge addition. compliance w/ ordinance no. 155-13 is not required. ref pa# 2013/07/26/2927. | $80,000 |
| May 9, 2014 | Completed final sign-off Feb 2018 | 556 28th St | Kenneally Construction | additions & renovations incl: rear yard horizontal addition, vertical addition of a 3rd flr level(add 3 bedrms 3 baths); conversion of garage to a garage & add 1 bedrm 1 bath & fam rm) interior remodel throughout.add powder room @ 2nd levelDetails
additions & renovations incl: rear yard horizontal addition, vertical addition of a 3rd flr level(add 3 bedrms 3 baths); conversion of garage to a garage & add 1 bedrm 1 bath & fam rm) interior remodel throughout.add powder room @ 2nd level | $700,000 |
| May 8, 2014 | Completed final sign-off May 2019 | 2237 Union St | H M W Development Inc | horizontal addition & remodel. wk incl add elevator, rebuild in-kind previously (e) conical roof over (e)turret, repair/replace (e)siding, cornice & detail at front facade. horizontal addition at rear,(n)media room & bathroom at 1/fl, rebuild (e) int.stairs, new bathroom at 4/fl & new roof terrace.Details
horizontal addition & remodel. wk incl add elevator, rebuild in-kind previously (e) conical roof over (e)turret, repair/replace (e)siding, cornice & detail at front facade. horizontal addition at rear,(n)media room & bathroom at 1/fl, rebuild (e) int.stairs, new bathroom at 4/fl & new roof terrace. | $1,000,000 |
| Jul 26, 2013 | Completed final sign-off Jan 2018 | 955 Natoma St | Royal Lyon Construction | change of use from f-1 to r-3. 3rd floor vertical addition. 1st & 2nd floors alteration. ** maher: compliance with ordinance no# 155-13 not required **Details
change of use from f-1 to r-3. 3rd floor vertical addition. 1st & 2nd floors alteration. ** maher: compliance with ordinance no# 155-13 not required ** | $350,000 |
| Mar 1, 2013 | Completed final sign-off Nov 2015 | 562 28th St | Jason Liu Construction Company | erect three story single family dwelling.Details
erect three story single family dwelling. | $650,000 |
| Mar 1, 2013 | Completed final sign-off Jun 2014 | 562 28th St | demolish 1 story single family.Details
demolish 1 story single family. | $10,000 | |
| Jul 5, 2006 | Completed final sign-off Sep 2006 | 943 Pacific Av | Mac Naughton Builder, Inc. | remove (e) exterior back stair & repair in-kind.Details
remove (e) exterior back stair & repair in-kind. | $14,000 |