Marvin Richard Frankel
- Listed as
- contractor, designer
- Firm
- F P Investments Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2010 to Feb 2022
26 permits since 2000 (contractor on 26 permits, designer on 1 permit): 18 completed, 1 in progress, 3 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 24, 2022 | In progress issued Jan 2024 | 359 Green St | F P Investments Inc | install entry gate to the entrance of rear building. all work not visible from street.Details
install entry gate to the entrance of rear building. all work not visible from street. | $10,000 |
| Jun 1, 2021 | Completed final sign-off Nov 2021 | 359 Green St | F P Investments Inc | install entry gate on front of building.Details
install entry gate on front of building. | $10,000 |
| Nov 7, 2019 | Never finaled filed Nov 2019, never issued | 1534 Taylor St | F P Investments Inc | to comply with nov #201987601. soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
to comply with nov #201987601. soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $20,000 |
| Mar 20, 2018 | Completed final sign-off May 2018 | 988 Pine St | F P Investments Inc | to obtain final inspection for work approved under pa#201610076536. all work is complete.Details
to obtain final inspection for work approved under pa#201610076536. all work is complete. | |
| Mar 6, 2018 | Never finaled issued Feb 2020, no final | 1534 Taylor St | F P Investments Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $20,000 |
| Mar 6, 2018 | Completed final sign-off Nov 2019 | 359 Green St | F P Investments Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $100,000 |
| Jun 2, 2017 | Completed final sign-off Apr 2018 | 2300 Buchanan St | F P Investments Inc | window replacement in kind unit #8 only. 12 in the front.Details
window replacement in kind unit #8 only. 12 in the front. | $25,000 |
| Mar 16, 2017 | Completed final sign-off Nov 2017 | 988 Pine St | F P Investments Inc | to comply with nov 201618641 replace in kind rear stairs. work at common areaDetails
to comply with nov 201618641 replace in kind rear stairs. work at common area | $20,000 |
| Dec 13, 2016 | Completed final sign-off Dec 2017 | 988 Pine St | F P Investments Inc | lowering trademan walkway to meet side door;'s height req' revision to 201405236636 for basement unitDetails
lowering trademan walkway to meet side door;'s height req' revision to 201405236636 for basement unit | $5,000 |
| Oct 31, 2016 | Completed final sign-off Jun 2018 | 2135 California St | F P Investments Inc | add unit per ordinance no# 162-16. convert (e) unconditioned utility / storage area & portion of (e) lightwell into new 2201 sf accessory dwelling unit.Details
add unit per ordinance no# 162-16. convert (e) unconditioned utility / storage area & portion of (e) lightwell into new 2201 sf accessory dwelling unit. | $300,000 |
| Feb 26, 2016 | Completed final sign-off Jun 2018 | 2135 California St | F P Investments Inc | interior alterations & remodeling at 12 (e)apartments including related alterations to structural,mech,plmbg & elec systems.alterations @1st flr garage & storage/utility area related to structural/utility changes @residential floors above.no changes to footprint,floor area,occupancy use,height orDetails
interior alterations & remodeling at 12 (e)apartments including related alterations to structural,mech,plmbg & elec systems.alterations @1st flr garage & storage/utility area related to structural/utility changes @residential floors above.no changes to footprint,floor area,occupancy use,height or | $750,000 |
| Feb 3, 2016 | Expired or cancelled cancelled Aug 2016 | 2135 California St | F P Investments Inc | remodel 1 bathroom in-kind at unit#2Details
remodel 1 bathroom in-kind at unit#2 | $12,000 |
| Jan 7, 2016 | Completed final sign-off May 2018 | 988 Pine St | F P Investments Inc | revision to 2014-0523-6636. moving furnace from rear mechanical room to hallway closet; lowering slab downstairs to accomodate ceiling height.Details
revision to 2014-0523-6636. moving furnace from rear mechanical room to hallway closet; lowering slab downstairs to accomodate ceiling height. | $7,000 |
| Jul 14, 2015 | Expired or cancelled expired May 2018 | 768 09th Av | F P Investments Inc | remodel existing apt unit 4. replcate e kitchen and install new cabinets, fixtures, appliances. relocate e bath, convert portion of e liv rm into new bedroom and bath. relocate e wh and boiler, upgrade e lighting, net increase 1 bedrm, 1 bath. no change occupancy,use,floor area, setbacks,heights...Details
remodel existing apt unit 4. replcate e kitchen and install new cabinets, fixtures, appliances. relocate e bath, convert portion of e liv rm into new bedroom and bath. relocate e wh and boiler, upgrade e lighting, net increase 1 bedrm, 1 bath. no change occupancy,use,floor area, setbacks,heights... | $50,000 |
| Aug 20, 2014 | Never finaled issued Aug 2014, no final | 120 Parker Av | F P Investments Inc | we are replacing our manual garage doors with automatic doors. same design and carriage style doors.Details
we are replacing our manual garage doors with automatic doors. same design and carriage style doors. | $10,000 |
| May 23, 2014 | Completed final sign-off May 2018 | 992 Pine St | F P Investments Inc | interior remodeling to the street level & 1st floor level. conversion of (e) office / storage at at street level into 2 bedrms, 2 baths residential apartment unit, street level and converting 2 bedrooms, 2 baths to 3 bedrooms 3 baths on the 1st floor. no work on top two levels.Details
interior remodeling to the street level & 1st floor level. conversion of (e) office / storage at at street level into 2 bedrms, 2 baths residential apartment unit, street level and converting 2 bedrooms, 2 baths to 3 bedrooms 3 baths on the 1st floor. no work on top two levels. | $100,000 |
| May 7, 2014 | Completed final sign-off Jul 2014 | 768 09th Av | F P Investments Inc | unit 12: close a door, move entrance from kitcen to hallway. replace kitchen cabinetry. bring kitchen electrical & plumbing up to code. remodel bathroom busfloors & walls. replace sink & tub. bring bathroom up to plumbing code.Details
unit 12: close a door, move entrance from kitcen to hallway. replace kitchen cabinetry. bring kitchen electrical & plumbing up to code. remodel bathroom busfloors & walls. replace sink & tub. bring bathroom up to plumbing code. | $10,000 |
| Nov 14, 2013 | Completed final sign-off Apr 2014 | 120 Parker Av | F P Investments Inc | amendment to pa #2012.12.13.6112 - increasing cost an additional $30,000.Details
amendment to pa #2012.12.13.6112 - increasing cost an additional $30,000. | $30,000 |
| Dec 13, 2012 | Completed final sign-off Apr 2014 | 120 Parker Av | F P Investments Inc | renovation of apartment #301 & #304 - 2 bathroom & 2 kitchen remodel. add additional bathroom in each unitDetails
renovation of apartment #301 & #304 - 2 bathroom & 2 kitchen remodel. add additional bathroom in each unit | $60,000 |
| Sep 13, 2012 | Completed final sign-off Apr 2014 | 1534 Taylor St | F P Investments Inc | foundation retrofit along rear wall of existing bldg. no additional floor area is proposed.Details
foundation retrofit along rear wall of existing bldg. no additional floor area is proposed. | $6,000 |
| Jul 10, 2012 | Expired or cancelled expired Feb 2024 | 1534 Taylor St | F P Investments Inc | revision to appl#2011-1223-1252. change in footings, posts & beamx of original permit.Details
revision to appl#2011-1223-1252. change in footings, posts & beamx of original permit. | |
| May 29, 2012 | Completed final sign-off Dec 2012 | 120 Parker Av | F P Investments Inc | to obtain final inspection for work approved under pa 200412131250; all work is complete (orig permit was for kitchen & bthroom remodel in unit #320)Details
to obtain final inspection for work approved under pa 200412131250; all work is complete (orig permit was for kitchen & bthroom remodel in unit #320) | |
| Dec 23, 2011 | Expired or cancelled expired Feb 2024 | 1534 Taylor St | F P Investments Inc | move 1544 #6 from the 3rd floor to basement. use the old space of 1544 #6 as 1534 #6, basement addition "game room" to 1534 #6.Details
move 1544 #6 from the 3rd floor to basement. use the old space of 1544 #6 as 1534 #6, basement addition "game room" to 1534 #6. | $120,000 |
| Sep 6, 2011 | Completed final sign-off Nov 2011 | 435 Locust St | F P Investments Inc | adding bath to unit #3. converting 2 bed/1 bath to 2 bed and bath apartment.Details
adding bath to unit #3. converting 2 bed/1 bath to 2 bed and bath apartment. | $15,000 |
| May 18, 2011 | Completed final sign-off Nov 2011 | 435 Locust St | F P Investments Inc | change entrance to unit #2 & add 1 bedroomDetails
change entrance to unit #2 & add 1 bedroom | $10,000 |
| Nov 23, 2010 | Completed final sign-off Sep 2011 | 988 Pine St | F P Investments Inc | convert 1/2 bathroom to full bathroom. add 3rd bathroom, work on #988 only.Details
convert 1/2 bathroom to full bathroom. add 3rd bathroom, work on #988 only. | $33,834 |