Tony Lau
- Listed as
- authorized agent-others, contractor, pmt consultant/expediter
- Firm
- K A Lau Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2005 to Aug 2026
358 permits since 2000 (contractor on 358 permits, authorized agent-others on 16 permits, pmt consultant/expediter on 2 permits): 276 completed, 23 in progress, 49 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 358.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 27, 2026 | In progress issued Aug 2026 | 333 Main St | K A Lau Construction | remodel of a kitchen in a covered dwelling unit (building built 2008). no changes to layout configuration including reach ranges, clear floor spaces, and counter heights.Details
remodel of a kitchen in a covered dwelling unit (building built 2008). no changes to layout configuration including reach ranges, clear floor spaces, and counter heights. | $20,000 |
| Jul 29, 2026 | In progress issued Jul 2026 | 425 01st St | K A Lau Construction | unit #2602: kitchen remodel- replace cabinets, countertop, interior painting. 2 bathrooms remodel- replace electrical and plumbing fixture and replace tile. interior painting for unit. no wall relocation. new lighting shall comply with cec 150.0 (k)3 and (k)5.Details
unit #2602: kitchen remodel- replace cabinets, countertop, interior painting. 2 bathrooms remodel- replace electrical and plumbing fixture and replace tile. interior painting for unit. no wall relocation. new lighting shall comply with cec 150.0 (k)3 and (k)5. | $80,000 |
| Jul 15, 2026 | In progress issued Jul 2026 | 3367 17th St | K A Lau Construction | replace dryrot siding on south side & west side of building, replace existing siding with handiplank, dryrot approximately 120 sq ft, street visible.Details
replace dryrot siding on south side & west side of building, replace existing siding with handiplank, dryrot approximately 120 sq ft, street visible. | $45,000 |
| Jul 14, 2026 | In progress issued Sep 2026 | 2100 31st Av | K A Lau Construction | construct 1 bedroom, 1 full bath. relocate (e) kitchen, bedroom. remodel (e) bathroom, & replace (e) sheetrock w/ new at 2/f. construct family room, 1 full bath, & install wetbar at g/f.Details
construct 1 bedroom, 1 full bath. relocate (e) kitchen, bedroom. remodel (e) bathroom, & replace (e) sheetrock w/ new at 2/f. construct family room, 1 full bath, & install wetbar at g/f. | $250,000 |
| Jul 13, 2026 | In progress issued Jul 2026 | 647 21st Av | K A Lau Construction | replace 16 windows in kind in the yard (not facing the street) with vinyl windows - same size, same location, same opening, same operation, no structural work. maintain eero per cbc 1031 as required. replace 45 sq ft of siding at the rear in kind due to dryrot - no replacement of wall studs, no strDetails
replace 16 windows in kind in the yard (not facing the street) with vinyl windows - same size, same location, same opening, same operation, no structural work. maintain eero per cbc 1031 as required. replace 45 sq ft of siding at the rear in kind due to dryrot - no replacement of wall studs, no str | $9,500 |
| Jul 10, 2026 | In progress issued Aug 2026 | 969 Valencia St | K A Lau Construction | revision to #202404119830: remove/repair (e) stair w/ new (less than 50%) interior.Details
revision to #202404119830: remove/repair (e) stair w/ new (less than 50%) interior. | $10,000 |
| Jun 29, 2026 | In progress issued Jul 2026 | 1750 17th Av | K A Lau Construction | recommencement and completion of work approved under pa# 202403298904.Details
recommencement and completion of work approved under pa# 202403298904. | $2,500 |
| Jun 25, 2026 | In progress issued Jul 2026 | 3062 Franklin St | K A Lau Construction | 3/f: to comply with nov# 202656971. legalize as-built non-bearing wall removal, bathroom remodel, and kitchen relocation. entirely remove as-built decking at rooftop. legalize as-built window alterations on 2/f & 3/f @ north facade.Details
3/f: to comply with nov# 202656971. legalize as-built non-bearing wall removal, bathroom remodel, and kitchen relocation. entirely remove as-built decking at rooftop. legalize as-built window alterations on 2/f & 3/f @ north facade. | $30,000 |
| Jun 23, 2026 | In progress filed Jun 2026, not yet issued | 448 Country Club Dr | K A Lau Construction | remove (e) skylight & relocate w/ new skylight.Details
remove (e) skylight & relocate w/ new skylight. | $4,500 |
| Jun 18, 2026 | In progress issued Jun 2026 | 1131 Clay St | K A Lau Construction | install laundry area on gr level. add 1/2 bath on 2nd level. rearrange layout 3rd level.Details
install laundry area on gr level. add 1/2 bath on 2nd level. rearrange layout 3rd level. | $35,000 |
| Jun 9, 2026 | In progress issued Jun 2026 | 88 King St | K A Lau Construction | bathroom remodel - replace bathtub with shower, new flooringDetails
bathroom remodel - replace bathtub with shower, new flooring | $15,000 |
| Jun 2, 2026 | Completed final sign-off Sep 2026 | 2367 19th Av | K A Lau Construction | comply w/ nov 202654864:auto damage repair: replace damaged studs and foundation at front wall from garage opening to south property line. replace 4" damaged studs and foundation at south property line wall. expose stucco at underside of bay window and header to confirm structural damage is present.Details
comply w/ nov 202654864:auto damage repair: replace damaged studs and foundation at front wall from garage opening to south property line. replace 4" damaged studs and foundation at south property line wall. expose stucco at underside of bay window and header to confirm structural damage is present. | $45,000 |
| May 21, 2026 | In progress issued Jun 2026 | 3060 Franklin St | K A Lau Construction | to comply w/ complaints 202421659 and 202317490- clear debris from yard, remove scaffolds (item 2) 202429442 remove unpermitted siding and return to original. 3060 franklin: bathroom, laundry room, powderoom, kitchen remodel. 1271..Details
to comply w/ complaints 202421659 and 202317490- clear debris from yard, remove scaffolds (item 2) 202429442 remove unpermitted siding and return to original. 3060 franklin: bathroom, laundry room, powderoom, kitchen remodel. 1271.. | $20,000 |
| May 19, 2026 | In progress filed May 2026, not yet issued | 60 Rolph St | K A Lau Construction | remove and replace damaged drywall and flooring. replace damaged drainline from upper level.Details
remove and replace damaged drywall and flooring. replace damaged drainline from upper level. | $15,000 |
| Apr 27, 2026 | In progress issued Apr 2026 | 448 Country Club Dr | K A Lau Construction | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl with 0 shower pan(s). | $40,800 |
| Mar 31, 2026 | In progress issued Mar 2026 | 1237 27th Av | K A Lau Construction | kitchen and bathroom remodel. no layout change. all work in kind.Details
kitchen and bathroom remodel. no layout change. all work in kind. | $60,000 |
| Mar 16, 2026 | Completed final sign-off Aug 2026 | 2442 44th Av | K A Lau Construction | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $36,000 |
| Mar 9, 2026 | Completed final sign-off Jun 2026 | 1170 Sacramento St | K A Lau Construction | unit 18c: remodel kitchem, guest bathroom, and 2 primary bathrooms. install new recessed lights, living area and hallways. new flooring, interior paint of unit. remodel in-kind, no layout change.Details
unit 18c: remodel kitchem, guest bathroom, and 2 primary bathrooms. install new recessed lights, living area and hallways. new flooring, interior paint of unit. remodel in-kind, no layout change. | $89,000 |
| Jan 22, 2026 | Completed final sign-off Jun 2026 | 1650 Jackson St | K A Lau Construction | unit 509: bathroom remodel like for like. no layout change.Details
unit 509: bathroom remodel like for like. no layout change. | $10,000 |
| Jan 12, 2026 | Completed final sign-off May 2026 | 1085 Washington St | K A Lau Construction | unit #201: kitchen remodel no layout change. bathroom remodel no layout change. update electrical with new subpanel, new flooring and interor painiting.Details
unit #201: kitchen remodel no layout change. bathroom remodel no layout change. update electrical with new subpanel, new flooring and interor painiting. | $38,000 |
| Dec 15, 2025 | Completed final sign-off Feb 2026 | 1732 Fillmore St | K A Lau Construction | dryrot repair - repair front stair stringer and steps. replace similar in kind. no change. less than 50% repair.Details
dryrot repair - repair front stair stringer and steps. replace similar in kind. no change. less than 50% repair. | $12,000 |
| Dec 9, 2025 | Completed final sign-off Dec 2025 | 1840 Sacramento St | K A Lau Construction | revision to pa#: 202508183275. install laundry hook up in bathroom.Details
revision to pa#: 202508183275. install laundry hook up in bathroom. | |
| Dec 8, 2025 | Completed final sign-off Mar 2026 | 22 West View Av | K A Lau Construction | revision to 202510308571 to comply complaint 201776192 and 201532091. infill ground level. add front lawn back and obtain electrical permit to comply with 201632091.Details
revision to 202510308571 to comply complaint 201776192 and 201532091. infill ground level. add front lawn back and obtain electrical permit to comply with 201632091. | |
| Dec 8, 2025 | In progress issued Dec 2025 | 88 King St | K A Lau Construction | kitchen remodel, no layout change. master bathroom remodel. no layout change. guest bathroom remodel. no lat change. replace hardwood floor and interiorDetails
kitchen remodel, no layout change. master bathroom remodel. no layout change. guest bathroom remodel. no lat change. replace hardwood floor and interior | $68,000 |
| Nov 20, 2025 | Completed final sign-off Aug 2026 | 2590 Sacramento St | K A Lau Construction | comply with complaint # 202311083: repair wall damages and loose staircase in the back of the building. replace 73 windows in the building with white vinyl, single hung. (some windows are street facing)Details
comply with complaint # 202311083: repair wall damages and loose staircase in the back of the building. replace 73 windows in the building with white vinyl, single hung. (some windows are street facing) | $85,000 |
| Oct 30, 2025 | Completed final sign-off Mar 2026 | 22 West View Av | K A Lau Construction | comply with complaint 2017761928. remove rooms, bathroom, and cabinets on ground level. infill door at front.Details
comply with complaint 2017761928. remove rooms, bathroom, and cabinets on ground level. infill door at front. | $20,000 |
| Sep 22, 2025 | Completed final sign-off Oct 2025 | 333 Main St | K A Lau Construction | unit 5e revision to 202506259417: removing kitchen remodel from original work scope. only 2 bathroom remodels - like for like.Details
unit 5e revision to 202506259417: removing kitchen remodel from original work scope. only 2 bathroom remodels - like for like. | |
| Sep 22, 2025 | Completed final sign-off Dec 2025 | 1840 Sacramento St | K A Lau Construction | unit 302: kitchen remodel - no layout change. interior painting & new flooring.Details
unit 302: kitchen remodel - no layout change. interior painting & new flooring. | $35,000 |
| Sep 2, 2025 | Completed final sign-off Jan 2026 | 88 King St | K A Lau Construction | kitchen remodel - no layout change.Details
kitchen remodel - no layout change. | $36,000 |
| Sep 2, 2025 | Completed final sign-off Dec 2025 | 1458 Church St | K A Lau Construction | revision to permit: 202505277258; full bathroom remodel.Details
revision to permit: 202505277258; full bathroom remodel. | $40,000 |
| Sep 2, 2025 | In progress filed Sep 2025, not yet issued | 88 King St | K A Lau Construction | kitchen remodel - no layout change.Details
kitchen remodel - no layout change. | |
| Aug 25, 2025 | Completed final sign-off Dec 2025 | 270 26th Av | K A Lau Construction | unit #9: kitchen remodel and (2) bathroom remodel. no layout chnages. interior painting and electrical upgrade.Details
unit #9: kitchen remodel and (2) bathroom remodel. no layout chnages. interior painting and electrical upgrade. | $60,000 |
| Aug 18, 2025 | Completed final sign-off Dec 2025 | 1840 Sacramento St | K A Lau Construction | unit 401: kitchen remodel & bathroom remodel. no layout change. interial painting and new flooring.Details
unit 401: kitchen remodel & bathroom remodel. no layout change. interial painting and new flooring. | $60,000 |
| Jul 1, 2025 | Completed final sign-off Jul 2026 | 3620 Ulloa St | K A Lau Construction | 2 front window replacement. (same size and same location)Details
2 front window replacement. (same size and same location) | $2,500 |
| Jun 25, 2025 | Completed final sign-off Oct 2025 | 88 King St | K A Lau Construction | 3rd fl: demo existing business center curved wall with new millwork in lounge area. add 3 new outletsDetails
3rd fl: demo existing business center curved wall with new millwork in lounge area. add 3 new outlets | $20,000 |
| Jun 25, 2025 | Completed final sign-off Oct 2025 | 333 Main St | K A Lau Construction | 2 bathroom remodel 1 kitchen remodel no layout change (85 sq ft bath, 45 sq ft bath, 90 sq ft kitchen)Details
2 bathroom remodel 1 kitchen remodel no layout change (85 sq ft bath, 45 sq ft bath, 90 sq ft kitchen) | $65,000 |
| May 30, 2025 | Completed final sign-off Dec 2025 | 1840 Sacramento St | K A Lau Construction | unit #304 - to comply with complaint #202538154 - kitchen remodel, replace kitchen cabinet, no layout change.Details
unit #304 - to comply with complaint #202538154 - kitchen remodel, replace kitchen cabinet, no layout change. | $30,000 |
| May 27, 2025 | Completed final sign-off Oct 2025 | 4430 Anza St | K A Lau Construction | both units, 4430 & 4432 - 2 kitchen remodel, 4 bathroom remodel. no layout change. interior painting.Details
both units, 4430 & 4432 - 2 kitchen remodel, 4 bathroom remodel. no layout change. interior painting. | $60,000 |
| May 27, 2025 | Completed final sign-off Dec 2025 | 1458 Church St | K A Lau Construction | kitchen remodel- no layout changeDetails
kitchen remodel- no layout change | $35,000 |
| May 9, 2025 | Completed final sign-off Oct 2025 | 4377 Mission St | K A Lau Construction | change of occupancy and use from e (day care) to b (office) barrier removal: install new power door equipments and add an ada restroomDetails
change of occupancy and use from e (day care) to b (office) barrier removal: install new power door equipments and add an ada restroom | $1,500 |
| Apr 16, 2025 | Completed final sign-off Sep 2025 | 88 King St | K A Lau Construction | unit #1117 - kitchen remodel. no layout change. replace cabinet, update electrical.Details
unit #1117 - kitchen remodel. no layout change. replace cabinet, update electrical. | $32,000 |
| Apr 11, 2025 | In progress filed Apr 2025, not yet issued | 1101 Cole St | K A Lau Construction | permit 202305157766 complied abe #202204040165, apply for infeasibility due to one step.Details
permit 202305157766 complied abe #202204040165, apply for infeasibility due to one step. | |
| Mar 6, 2025 | Completed final sign-off Jul 2025 | 1840 Sacramento St | K A Lau Construction | unit #403: kitchen and bathroom remodel no layout changeDetails
unit #403: kitchen and bathroom remodel no layout change | $50,000 |
| Mar 6, 2025 | Completed final sign-off Apr 2025 | 270 26th Av | K A Lau Construction | replace damaged siding on the south and rear building approximately 2000 sq ft w/hanrdi plank complilance to complaint # 202534819Details
replace damaged siding on the south and rear building approximately 2000 sq ft w/hanrdi plank complilance to complaint # 202534819 | $22,000 |
| Mar 6, 2025 | Completed final sign-off Jul 2025 | 1840 Sacramento St | K A Lau Construction | unit #301: kitchen and bathroom remodel no layout change no change in plumbing fixture countDetails
unit #301: kitchen and bathroom remodel no layout change no change in plumbing fixture count | $50,000 |
| Oct 15, 2024 | In progress issued Oct 2024 | 61 Cora St | K A Lau Construction | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $25,000 |
| Sep 30, 2024 | Completed final sign-off Apr 2025 | 2340 Filbert St | K A Lau Construction | unit 10-kitchen and bath remodel. no sructural change.Details
unit 10-kitchen and bath remodel. no sructural change. | $45,000 |
| Sep 30, 2024 | Completed final sign-off Dec 2024 | 1840 Sacramento St | K A Lau Construction | unit# 203: kitchen and bath remodel. no structural changes.Details
unit# 203: kitchen and bath remodel. no structural changes. | $45,000 |
| Sep 30, 2024 | In progress issued Sep 2024 | 244 12th Av | K A Lau Construction | address correction for 202310108270 from 242 12th ave to 244 12th aveDetails
address correction for 202310108270 from 242 12th ave to 244 12th ave | |
| Jul 30, 2024 | In progress issued Jul 2024 | 1422 27th Av | K A Lau Construction | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $25,000 |
| Jul 1, 2024 | Completed final sign-off Nov 2024 | 80 San Pablo Av | K A Lau Construction | remove partial (e) wall. install 2 new steel beams. revision to pa#202404190326.Details
remove partial (e) wall. install 2 new steel beams. revision to pa#202404190326. | $30,000 |
| Jul 1, 2024 | Completed final sign-off Dec 2024 | 1840 Sacramento St | K A Lau Construction | unit #103, #203 & #201 kitchen and bathroom remodel- no layout changeDetails
unit #103, #203 & #201 kitchen and bathroom remodel- no layout change | $110,000 |
| May 29, 2024 | Completed final sign-off Nov 2024 | 80 San Pablo Av | K A Lau Construction | construct study room, media room, & bathroom at g/f. repair (e) interior staircase from 1/f to g/f.Details
construct study room, media room, & bathroom at g/f. repair (e) interior staircase from 1/f to g/f. | $111,300 |
| May 28, 2024 | Completed final sign-off Dec 2024 | 559 20th Av | K A Lau Construction | to comply with complaint #202424011 remodel kitchen and bathroom. no layout changeDetails
to comply with complaint #202424011 remodel kitchen and bathroom. no layout change | $36,000 |
| Apr 19, 2024 | Completed final sign-off Nov 2024 | 80 San Pablo Av | K A Lau Construction | one kitchen remodel and one bathroom remodel. no structural changes.Details
one kitchen remodel and one bathroom remodel. no structural changes. | $40,000 |
| Apr 12, 2024 | Completed final sign-off May 2025 | 2614 Sacramento St | K A Lau Construction | repair stairway on side of the house w/similar in-kind less than 50%Details
repair stairway on side of the house w/similar in-kind less than 50% | $4,000 |
| Apr 12, 2024 | Completed final sign-off Sep 2024 | 1745 Buchanan St | K A Lau Construction | kitchen remodel & bathrooms remodel - no wall changed. update electrical in the unitDetails
kitchen remodel & bathrooms remodel - no wall changed. update electrical in the unit | $60,000 |
| Apr 12, 2024 | Completed final sign-off Nov 2024 | 207 Gough St | K A Lau Construction | unit 42: kitchen and bathroom remodel. electrical upgrade in the unitDetails
unit 42: kitchen and bathroom remodel. electrical upgrade in the unit | $50,000 |
| Apr 11, 2024 | In progress issued Jul 2024 | 969 Valencia St | K A Lau Construction | repair fire damage to affected areas in building. restore apartment burned in fire (kitchen, bathroom, living room) and affected apartments. due to water and fire smoke damage, cosmetic work to be done such as painting, cleaning at lightwell on 2/f & 3/f.Details
repair fire damage to affected areas in building. restore apartment burned in fire (kitchen, bathroom, living room) and affected apartments. due to water and fire smoke damage, cosmetic work to be done such as painting, cleaning at lightwell on 2/f & 3/f. | $1,263,670 |
| Feb 20, 2024 | Completed final sign-off May 2025 | 2614 Sacramento St | K A Lau Construction | new structural framing alterations for minor wall. plan changes voluntary seismic retrofit of all stories per sfdbi ab-94 and 2022 cebc. (setback 20'-0" ft from property line) reference pa# 2023.1107.0315Details
new structural framing alterations for minor wall. plan changes voluntary seismic retrofit of all stories per sfdbi ab-94 and 2022 cebc. (setback 20'-0" ft from property line) reference pa# 2023.1107.0315 | $68,000 |
| Jan 24, 2024 | Completed final sign-off Mar 2024 | 2018 Sloat Bl | K A Lau Construction | repair dryrot at back siding. approx 250 sq ft. not facing the streetDetails
repair dryrot at back siding. approx 250 sq ft. not facing the street | $6,500 |
| Jan 23, 2024 | In progress issued Jan 2024 | 45 Lloyd St | K A Lau Construction | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $25,000 |
| Nov 15, 2023 | Completed final sign-off May 2024 | 2620 Larkin St | K A Lau Construction | dryrot repair in courtyard. rotted baseboard- approx 100sqftDetails
dryrot repair in courtyard. rotted baseboard- approx 100sqft | $12,000 |
| Nov 7, 2023 | Completed final sign-off May 2025 | 2614 Sacramento St | K A Lau Construction | revision under pa #202106182775: delete 1 bathroom, bedroom. relocate 1 bathroom at g/f. relocate powder room & hange single door to sliding door at 2/f. relocate closet at 3/f.Details
revision under pa #202106182775: delete 1 bathroom, bedroom. relocate 1 bathroom at g/f. relocate powder room & hange single door to sliding door at 2/f. relocate closet at 3/f. | |
| Nov 6, 2023 | Completed final sign-off Jul 2024 | 1106 Valencia St | K A Lau Construction | unit b; kitchen and bathroom remodel. simliar in kind. electrical update in the unit interior paintingDetails
unit b; kitchen and bathroom remodel. simliar in kind. electrical update in the unit interior painting | $46,000 |
| Oct 10, 2023 | Completed final sign-off Sep 2024 | 242 12th Av | K A Lau Construction | kitchen remodel- no structural chnage. upgrade electrical in the unit. replace exisitng kitchen window not street facing, same size and location. bathroom remodel- no structural change. interior painting.Details
kitchen remodel- no structural chnage. upgrade electrical in the unit. replace exisitng kitchen window not street facing, same size and location. bathroom remodel- no structural change. interior painting. | $60,000 |
| Oct 4, 2023 | Completed final sign-off Jan 2024 | 8 Everglade Dr | K A Lau Construction | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $20,000 |
| Sep 25, 2023 | Completed final sign-off May 2024 | 2620 Larkin St | K A Lau Construction | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $22,000 |
| Aug 22, 2023 | Completed final sign-off Sep 2024 | 2367 19th Av | K A Lau Construction | construct 2 bedroom, 1 full bathroom, family room & kitchenette at g/f. remodel (e) kitchen, bathroom, & construct 1 3'x3' skylight at 2/f. construct new staircase from 2nd fl down to rear yard.Details
construct 2 bedroom, 1 full bathroom, family room & kitchenette at g/f. remodel (e) kitchen, bathroom, & construct 1 3'x3' skylight at 2/f. construct new staircase from 2nd fl down to rear yard. | $162,000 |
| Aug 21, 2023 | Completed final sign-off Oct 2023 | 1845 Lincoln Wy | K A Lau Construction | repair dry rot (750 sq ft) in back wall. replace similar in kind. replace 7 windows - not facing street.Details
repair dry rot (750 sq ft) in back wall. replace similar in kind. replace 7 windows - not facing street. | $25,000 |
| Aug 18, 2023 | Completed final sign-off Apr 2024 | 1845 Lincoln Wy | K A Lau Construction | commencement of not started under previously approved permit 201709158495 for mandatory soft tory retrofit per sfbc ch34b. 2012 iebc appendix a4.Details
commencement of not started under previously approved permit 201709158495 for mandatory soft tory retrofit per sfbc ch34b. 2012 iebc appendix a4. | $85,000 |
| Aug 18, 2023 | Completed final sign-off Jan 2024 | 2018 Sloat Bl | K A Lau Construction | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $11,000 |
| Aug 7, 2023 | Completed final sign-off Apr 2024 | 1845 Lincoln Wy | K A Lau Construction | revision to pa# 201709158495, provide alternate spec. moment frame along grid 1 & 5Details
revision to pa# 201709158495, provide alternate spec. moment frame along grid 1 & 5 | |
| Jun 7, 2023 | Completed final sign-off Dec 2023 | 678 Haight St | K A Lau Construction | new ada restroom at 1st flr. new store front door & sidelight after infill front space.Details
new ada restroom at 1st flr. new store front door & sidelight after infill front space. | $24,500 |
| Jun 5, 2023 | Expired or cancelled cancelled Aug 2023 | 1845 Lincoln Wy | K A Lau Construction | commencement of not started under previously approved permit 201709158495 for mandatory soft tory retrofit per sfbc ch34b. 2012 iebc appendix a4.Details
commencement of not started under previously approved permit 201709158495 for mandatory soft tory retrofit per sfbc ch34b. 2012 iebc appendix a4. | $85,000 |
| May 26, 2023 | Completed final sign-off Jul 2023 | 1101 Cole St | K A Lau Construction | replace damage siding in both of the house with simliar in kind. dry rot approx 80sqft.Details
replace damage siding in both of the house with simliar in kind. dry rot approx 80sqft. | $40,000 |
| May 25, 2023 | Completed final sign-off Oct 2023 | 838 25th Av | K A Lau Construction | ground level- add 1 bedroom with walk-in closet, playroom and bathroomDetails
ground level- add 1 bedroom with walk-in closet, playroom and bathroom | $60,000 |
| May 15, 2023 | Completed final sign-off Apr 2025 | 1101 Cole St | K A Lau Construction | accessibility upgrades to 1st flr commercial unit per sf-abe survey req- modify extg step at entryway, add visual striping at step nosings, add handrails to both sides of both steps to provided accessible entry. new entry door, hardware and threshold. abe# 202204040165.Details
accessibility upgrades to 1st flr commercial unit per sf-abe survey req- modify extg step at entryway, add visual striping at step nosings, add handrails to both sides of both steps to provided accessible entry. new entry door, hardware and threshold. abe# 202204040165. | $1,000 |
| May 9, 2023 | Completed final sign-off Dec 2023 | 834 32nd Av | K A Lau Construction | ground level - add bathroom and family roomDetails
ground level - add bathroom and family room | $52,000 |
| Apr 26, 2023 | Never finaled issued Apr 2023, no final | 888 40th Av | K A Lau Construction | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl with 0 shower pan(s). | $35,000 |
| Apr 20, 2023 | Expired or cancelled cancelled Nov 2023 | 343 Clement St | K A Lau Construction | removal of awning & 2nd lvl signageDetails
removal of awning & 2nd lvl signage | $200 |
| Mar 30, 2023 | Completed final sign-off Mar 2024 | 88 King St | K A Lau Construction | kitchen: countertop replacement in kind. update electrical, new backsplash. new flooring in living room with new lighting.Details
kitchen: countertop replacement in kind. update electrical, new backsplash. new flooring in living room with new lighting. | $42,000 |
| Mar 30, 2023 | Completed final sign-off Aug 2023 | 1460 Church St | K A Lau Construction | kitchen remodel with electrical upgrade. no structural changeDetails
kitchen remodel with electrical upgrade. no structural change | $30,000 |
| Mar 30, 2023 | Completed final sign-off Dec 2023 | 207 Gough St | K A Lau Construction | unit 36: kitchen remodel, bathroom remodel: update electrical: no structural changeDetails
unit 36: kitchen remodel, bathroom remodel: update electrical: no structural change | $50,000 |
| Feb 27, 2023 | Completed final sign-off Jun 2023 | 250 King St | K A Lau Construction | #1465: kitchen remodel- replace bainets and flooring. no layout change.Details
#1465: kitchen remodel- replace bainets and flooring. no layout change. | $20,000 |
| Feb 27, 2023 | Completed final sign-off May 2023 | 73 Dolores Tr | K A Lau Construction | kitchen remodel - no structural change. replace cabninets.Details
kitchen remodel - no structural change. replace cabninets. | $20,000 |
| Feb 14, 2023 | Completed final sign-off Oct 2023 | 975 Valencia St | K A Lau Construction | unit 3- one kitchen and 1 bath remodel, electrical upgrade: unit 8: 1 kitchen and 1 bath remodel, electrical upgradeDetails
unit 3- one kitchen and 1 bath remodel, electrical upgrade: unit 8: 1 kitchen and 1 bath remodel, electrical upgrade | $60,000 |
| Jan 26, 2023 | Completed final sign-off Jan 2024 | 2018 Sloat Bl | K A Lau Construction | 1st/f: add bathroom in (e) room. 2nd/f: modify (e) bath, add 1 bathDetails
1st/f: add bathroom in (e) room. 2nd/f: modify (e) bath, add 1 bath | $45,000 |
| Jan 17, 2023 | Never finaled issued Jan 2023, no final | 1915 Judah St | K A Lau Construction | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $25,000 |
| Nov 17, 2022 | Completed final sign-off Apr 2023 | 641 Carolina St | K A Lau Construction | one bathroom remodel- no wall changes no layout changesDetails
one bathroom remodel- no wall changes no layout changes | $12,000 |
| Jul 25, 2022 | Completed final sign-off Mar 2023 | 2428 Funston Av | K A Lau Construction | construct bedroom, family room, office & 2 full bathroom. in-fill the open space under 2nd floor at g/f. remodel (e) kitchen, 2 (e) bathroom, & replace (e) sheet rock w/ new at 2nd floor.Details
construct bedroom, family room, office & 2 full bathroom. in-fill the open space under 2nd floor at g/f. remodel (e) kitchen, 2 (e) bathroom, & replace (e) sheet rock w/ new at 2nd floor. | $180,000 |
| Jul 7, 2022 | Completed final sign-off Nov 2022 | 1433 46th Av | K A Lau Construction | one kitchen remodel- replace cabinets, flooring, countertop. interior painting. no wall change.Details
one kitchen remodel- replace cabinets, flooring, countertop. interior painting. no wall change. | $16,000 |
| Jul 6, 2022 | Completed final sign-off Mar 2023 | 2428 Funston Av | K A Lau Construction | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $22,000 |
| Jun 23, 2022 | Completed final sign-off Mar 2023 | 207 Gough St | K A Lau Construction | unit 28 - interior remodel: remodel kitchen/bath; replace/add new fixtures, counters & flooring; (n) lighting, fans, outlets and switchesDetails
unit 28 - interior remodel: remodel kitchen/bath; replace/add new fixtures, counters & flooring; (n) lighting, fans, outlets and switches | $36,000 |
| May 24, 2022 | Completed final sign-off Aug 2022 | 3337 Steiner St | K A Lau Construction | unit #1: revision to pa# 202203180325. kitchen & bathroom remodel. upgrade electrical in unit. modify bathroom layout to install laundry area. close a pocket door between 2 rooms. dryrot repair due to water damage.Details
unit #1: revision to pa# 202203180325. kitchen & bathroom remodel. upgrade electrical in unit. modify bathroom layout to install laundry area. close a pocket door between 2 rooms. dryrot repair due to water damage. | $12,000 |
| May 16, 2022 | Completed final sign-off Jul 2022 | 601 04th St | K A Lau Construction | one kitchen remodel - no structural changes. replace cabinets & countertop. all work in-kind.Details
one kitchen remodel - no structural changes. replace cabinets & countertop. all work in-kind. | $20,000 |
| May 2, 2022 | Never finaled filed May 2022, never issued | 72 Mill St | K A Lau Construction | to comply with complaints 202057681, 202178471, 202185650. legalize rear deck. kitchen and bathroom (previously remodel) remodel in kind.Details
to comply with complaints 202057681, 202178471, 202185650. legalize rear deck. kitchen and bathroom (previously remodel) remodel in kind. | $15,000 |
| Apr 12, 2022 | Completed final sign-off May 2025 | 2614 Sacramento St | K A Lau Construction | repair dry rot around the house. will restore all damaged dryrot back to original design (100 sqft) front building. to comply with complaint 202289784. siding repair in-kind woodDetails
repair dry rot around the house. will restore all damaged dryrot back to original design (100 sqft) front building. to comply with complaint 202289784. siding repair in-kind wood | $18,000 |
| Mar 18, 2022 | Completed final sign-off Aug 2022 | 3337 Steiner St | K A Lau Construction | 3337 steiner #1: kitchen and bathroom remodel. no wall change update electriacl in the unit. interior paint with new flooring.Details
3337 steiner #1: kitchen and bathroom remodel. no wall change update electriacl in the unit. interior paint with new flooring. | $40,000 |
| Feb 17, 2022 | Never finaled issued Feb 2022, no final | 770 29th Av | K A Lau Construction | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $15,000 |