Scott Philip Davis
- Listed as
- authorized agent-others, contractor
- Firm
- Standardconstr/Standardroof
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Jun 2026
1,854 permits since 2000 (contractor on 1,854 permits, authorized agent-others on 3 permits): 775 completed, 19 in progress, 679 never finaled, 381 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 1,854.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 23, 2026 | Completed final sign-off Jul 2026 | 347 Joost Av | Standardconstr/Standardroof | reroofing with torch down.Details
reroofing with torch down. | $23,500 |
| Jun 16, 2026 | Completed final sign-off Jul 2026 | 927 Ashbury St | Standardconstr/Standardroof | reroofing: no hot works. tear off (e) roof on top main sloped roof, dermers & lower rear sloped roof. install new one layer 30lb underlayment & 30 yr certainteed landmark asphalt shingles to upper southside dermer and lower rear sloped roof. install new certainteed flintastic base sheet & cap sheet.Details
reroofing: no hot works. tear off (e) roof on top main sloped roof, dermers & lower rear sloped roof. install new one layer 30lb underlayment & 30 yr certainteed landmark asphalt shingles to upper southside dermer and lower rear sloped roof. install new certainteed flintastic base sheet & cap sheet. | $40,500 |
| May 13, 2026 | Completed final sign-off Jun 2026 | 1930 Taraval St | Standardconstr/Standardroof | reroof w/ hot work.Details
reroof w/ hot work. | $51,000 |
| May 13, 2026 | Completed final sign-off Jun 2026 | 912 Filbert St | Standardconstr/Standardroof | reroof w/ hot work.Details
reroof w/ hot work. | $30,500 |
| Apr 30, 2026 | Completed final sign-off May 2026 | 1863 Church St | Standardconstr/Standardroof | reroofing no hot worksDetails
reroofing no hot works | $27,500 |
| Mar 23, 2026 | Completed final sign-off Apr 2026 | 2 Garcia Av | Standardconstr/Standardroof | reroofing hot worksDetails
reroofing hot works | $17,500 |
| Mar 23, 2026 | Completed final sign-off May 2026 | 494 Lansdale Av | Standardconstr/Standardroof | re roofing no hot worksDetails
re roofing no hot works | $32,000 |
| Feb 18, 2026 | In progress issued Feb 2026 | 2076 Jackson St | Standardconstr/Standardroof | reroofing- hot work .Details
reroofing- hot work . | $16,500 |
| Jan 13, 2026 | Completed final sign-off Feb 2026 | 2355 Jones St | Standardconstr/Standardroof | reroof, no hot work - reroof for south side deck only. remove (e) roof. install (n) one layer certainteed flintlestic sa base sheet, two layers sa ply sheet, and one layer sa cap sheet.Details
reroof, no hot work - reroof for south side deck only. remove (e) roof. install (n) one layer certainteed flintlestic sa base sheet, two layers sa ply sheet, and one layer sa cap sheet. | $17,500 |
| Dec 2, 2025 | Completed final sign-off Dec 2025 | 100 Devonshire Wy | Standardconstr/Standardroof | reroofing, hot work. tear off (e) top main flat roof. install (n) one layer fiberglass base sheet. (32) layers. no plysheet, hot asphalt flood coat and gravelDetails
reroofing, hot work. tear off (e) top main flat roof. install (n) one layer fiberglass base sheet. (32) layers. no plysheet, hot asphalt flood coat and gravel | $31,500 |
| Dec 2, 2025 | In progress issued Dec 2025 | 2162 25th Av | Standardconstr/Standardroof | reroofing, hot work. tear off (e) top main flat roof. install (n) one layer fiberglass base sheet. (32) layers. no plysheet, hot asphalt flood coat and gravelDetails
reroofing, hot work. tear off (e) top main flat roof. install (n) one layer fiberglass base sheet. (32) layers. no plysheet, hot asphalt flood coat and gravel | $28,000 |
| Dec 2, 2025 | Completed final sign-off Feb 2026 | 935 Chestnut St | Standardconstr/Standardroof | reroofing, no hot work. tear off (e) top main flat roof. install (n) one layer fiberglass base sheet. (32) layers. no plysheet, hot asphalt flood coat and gravelDetails
reroofing, no hot work. tear off (e) top main flat roof. install (n) one layer fiberglass base sheet. (32) layers. no plysheet, hot asphalt flood coat and gravel | $26,500 |
| Oct 28, 2025 | Completed final sign-off Dec 2025 | 2320 Vallejo St | Standardconstr/Standardroof | re-roofing (no hot works)Details
re-roofing (no hot works) | $79,000 |
| Oct 28, 2025 | Completed final sign-off Dec 2025 | 2320 Vallejo St | Standardconstr/Standardroof | install new half inch (1/2") cdx plywood sheathing to lower front sloped roof.Details
install new half inch (1/2") cdx plywood sheathing to lower front sloped roof. | $12,000 |
| Oct 28, 2025 | Completed final sign-off Nov 2025 | 392 Chestnut St | Standardconstr/Standardroof | re-roofing (w/ hot works)Details
re-roofing (w/ hot works) | $22,500 |
| Sep 16, 2025 | Completed final sign-off Sep 2025 | 427 35th Av | Standardconstr/Standardroof | install new 2" insulation board. eliminate one 0.5" roof jack, one 10" chimney and one 20" chimney. re-roofing permit #202509094863.Details
install new 2" insulation board. eliminate one 0.5" roof jack, one 10" chimney and one 20" chimney. re-roofing permit #202509094863. | $21,500 |
| Sep 9, 2025 | Completed final sign-off Oct 2025 | 2654 Greenwich St | Standardconstr/Standardroof | re-roofing (no hot works) at main flat roof and upper rear flat roof. no work to (e) roof structural sheathing.Details
re-roofing (no hot works) at main flat roof and upper rear flat roof. no work to (e) roof structural sheathing. | $42,500 |
| Sep 9, 2025 | Completed final sign-off Sep 2025 | 320 San Benito Wy | Standardconstr/Standardroof | re-roofing (no hot works) at main flat roof. no work to (e) roof structural sheathing.Details
re-roofing (no hot works) at main flat roof. no work to (e) roof structural sheathing. | $18,500 |
| Sep 9, 2025 | Completed final sign-off Sep 2025 | 427 35th Av | Standardconstr/Standardroof | re-roofing (no hot works). no work to (e) roof structural sheathing.Details
re-roofing (no hot works). no work to (e) roof structural sheathing. | $24,000 |
| Aug 12, 2025 | Completed final sign-off Sep 2025 | 147 Maddux Av | Standardconstr/Standardroof | re roofing at flat roof. no hot works. no work to (e) roof structural sheathing.Details
re roofing at flat roof. no hot works. no work to (e) roof structural sheathing. | $23,500 |
| Aug 12, 2025 | Completed final sign-off Sep 2025 | 2912 Pacific Av | Standardconstr/Standardroof | re roofing at flat roof. no hot works. tear off existing gravel roof top main flat roof. install layer of fiber glass base sheet, 3 layers of no 11 lb plysheet, hot asphalt flood coat and gravel. no work to (e) roof structural sheathing.Details
re roofing at flat roof. no hot works. tear off existing gravel roof top main flat roof. install layer of fiber glass base sheet, 3 layers of no 11 lb plysheet, hot asphalt flood coat and gravel. no work to (e) roof structural sheathing. | $26,250 |
| Aug 7, 2025 | Completed final sign-off Oct 2025 | 240 Santa Clara Av | Standardconstr/Standardroof | re roofing: no torch down.Details
re roofing: no torch down. | $58,500 |
| Jul 11, 2025 | Completed final sign-off Jul 2025 | 407 Congo St | Standardconstr/Standardroof | re roofing: no hot work. remove existing roof, install new layer fiberglass base sheet, 3 layers mid ply no. 11lb hot asphalt and one layer certained flintlastic sbc rusher cap sheet.Details
re roofing: no hot work. remove existing roof, install new layer fiberglass base sheet, 3 layers mid ply no. 11lb hot asphalt and one layer certained flintlastic sbc rusher cap sheet. | $24,000 |
| May 12, 2025 | In progress issued May 2025 | 2445 Polk St | Standardconstr/Standardroof | re-roofing no torch downDetails
re-roofing no torch down | $30,000 |
| Feb 24, 2025 | Completed final sign-off Mar 2025 | 118 Kensington Wy | Standardconstr/Standardroof | re-roofing (hot work)Details
re-roofing (hot work) | $44,000 |
| Feb 5, 2025 | Completed final sign-off Mar 2025 | 3923 California St | Standardconstr/Standardroof | re-roofing; no hot works. no work to (e) roof structural sheathing.Details
re-roofing; no hot works. no work to (e) roof structural sheathing. | $38,450 |
| Feb 5, 2025 | Completed final sign-off Apr 2025 | 148 Wetmore St | Standardconstr/Standardroof | re-roofing; hotworks. no work to (e) roof structural sheathing.Details
re-roofing; hotworks. no work to (e) roof structural sheathing. | $32,250 |
| Jan 17, 2025 | Completed final sign-off Jan 2025 | 1201 Stanyan St | Standardconstr/Standardroof | re-roofing. no torch down. remove (e) tar and gravel roof on top main flat roof and parpate. install new roof with one larger fiber glass base sheet. 3 layer of no 11 lb ply sheet, hot asphalt flood coatDetails
re-roofing. no torch down. remove (e) tar and gravel roof on top main flat roof and parpate. install new roof with one larger fiber glass base sheet. 3 layer of no 11 lb ply sheet, hot asphalt flood coat | $24,000 |
| Jan 14, 2025 | Completed final sign-off Feb 2025 | 2151 27th Av | Standardconstr/Standardroof | roof replacement: remove existing tar and gravel roof. install new one layer fiberglass base-sheet, one layer mid ply and one layer certainteed flintlastic gta cap sheet. torch downDetails
roof replacement: remove existing tar and gravel roof. install new one layer fiberglass base-sheet, one layer mid ply and one layer certainteed flintlastic gta cap sheet. torch down | $28,000 |
| Dec 13, 2024 | Completed final sign-off Jan 2025 | 595 Rhode Island St | Standardconstr/Standardroof | re-roofing to top main flat roof only. remove existing roof and install one layer fiberglass base sheet, 3 layers no. 11lb ply sheet, hot asphalt flood coat and one layer certainteed flintlastic sbs rubber cap sheet.Details
re-roofing to top main flat roof only. remove existing roof and install one layer fiberglass base sheet, 3 layers no. 11lb ply sheet, hot asphalt flood coat and one layer certainteed flintlastic sbs rubber cap sheet. | $39,250 |
| Dec 13, 2024 | Completed final sign-off Feb 2025 | 2040 Scott St | Standardconstr/Standardroof | re-roofing to north side sloped roof only. remove existing asphalt shingles and install new one layer 30lb underlayment and certainteed landmark shingled to match existing. - no hot work.Details
re-roofing to north side sloped roof only. remove existing asphalt shingles and install new one layer 30lb underlayment and certainteed landmark shingled to match existing. - no hot work. | $34,500 |
| Oct 9, 2024 | In progress issued Oct 2024 | 770 10th Av | Standardconstr/Standardroof | reroofDetails
reroof | $32,000 |
| Oct 9, 2024 | Completed final sign-off Dec 2024 | 1224 27th Av | Standardconstr/Standardroof | reroofDetails
reroof | $42,000 |
| Sep 26, 2024 | Completed final sign-off Oct 2024 | 340 Eureka St | Standardconstr/Standardroof | reroofingDetails
reroofing | $26,500 |
| Sep 12, 2024 | In progress issued Sep 2024 | 2841 Lincoln Wy | Standardconstr/Standardroof | reroofingDetails
reroofing | $39,500 |
| Aug 29, 2024 | Completed final sign-off Sep 2024 | 663 19th Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $30,000 |
| Aug 29, 2024 | Completed final sign-off Oct 2024 | 201 San Marcos Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $63,000 |
| Aug 14, 2024 | In progress issued Aug 2024 | 726 10th Av | Standardconstr/Standardroof | re-roofing - ref roof repair bpa: 202408148650Details
re-roofing - ref roof repair bpa: 202408148650 | $38,000 |
| Aug 14, 2024 | In progress issued Aug 2024 | 726 10th Av | Standardconstr/Standardroof | install new half inch cdx pywood sheating to top main sloped roof. ref reroofing bpa: 202408148649Details
install new half inch cdx pywood sheating to top main sloped roof. ref reroofing bpa: 202408148649 | $6,000 |
| Jul 11, 2024 | Completed final sign-off Aug 2024 | 160 Hartford St | Standardconstr/Standardroof | reroofing. no work to (e) roof structural sheathing. (e) roof structural sheathing to remain.Details
reroofing. no work to (e) roof structural sheathing. (e) roof structural sheathing to remain. | $29,500 |
| Jul 11, 2024 | Completed final sign-off Aug 2024 | 154 23rd Av | Standardconstr/Standardroof | reroofing. no work to (e) roof structural sheathing - (e) roof structural sheathing to remain.Details
reroofing. no work to (e) roof structural sheathing - (e) roof structural sheathing to remain. | $34,500 |
| Jun 25, 2024 | Completed final sign-off Jul 2024 | 2650 Scott St | Standardconstr/Standardroof | reroofingDetails
reroofing | $36,250 |
| Jun 17, 2024 | Completed final sign-off Jul 2024 | 4107 23rd St | Standardconstr/Standardroof | reroofingDetails
reroofing | $52,500 |
| May 23, 2024 | Completed final sign-off Jul 2024 | 3126 Geary Bl | Standardconstr/Standardroof | reroofingDetails
reroofing | $34,500 |
| May 23, 2024 | In progress issued May 2024 | 3616 21st St | Standardconstr/Standardroof | reroofingDetails
reroofing | $36,500 |
| Apr 29, 2024 | In progress issued Apr 2024 | 133 07th Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $36,500 |
| Apr 26, 2024 | Completed final sign-off Feb 2025 | 2628 15th Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $33,750 |
| Apr 17, 2024 | Completed final sign-off Jan 2025 | 1930 Funston Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $23,000 |
| Apr 17, 2024 | In progress issued Apr 2024 | 26 Portola Dr | Standardconstr/Standardroof | reroofingDetails
reroofing | $26,500 |
| Apr 11, 2024 | In progress issued Apr 2024 | 1639 Beach St | Standardconstr/Standardroof | reroofingDetails
reroofing | $12,500 |
| Mar 15, 2024 | In progress issued Mar 2024 | 275 Christopher Dr | Standardconstr/Standardroof | re-roofingDetails
re-roofing | $34,500 |
| Mar 5, 2024 | In progress issued Mar 2024 | 60 Stanyan St | Standardconstr/Standardroof | reroofing: tear off (e) tar and gravel roof on top main roof install one longer fiber glass large sheet (3) layers no 111b ply sheet and one layer certainteed flintastic sbs rubber cap sheetDetails
reroofing: tear off (e) tar and gravel roof on top main roof install one longer fiber glass large sheet (3) layers no 111b ply sheet and one layer certainteed flintastic sbs rubber cap sheet | $44,500 |
| Feb 29, 2024 | Completed final sign-off Apr 2024 | 2080 03rd St | Standardconstr/Standardroof | reroofingDetails
reroofing | $19,250 |
| Feb 29, 2024 | In progress issued Feb 2024 | 2080 03rd St | Standardconstr/Standardroof | repair lightwell penthouse walls. remove wood siding and concrete topping slab. replace dryrot damage siding and sheathing. install new 3/4" pressure treated plywood siding. approx 1000sf or wall repairDetails
repair lightwell penthouse walls. remove wood siding and concrete topping slab. replace dryrot damage siding and sheathing. install new 3/4" pressure treated plywood siding. approx 1000sf or wall repair | $17,500 |
| Dec 29, 2023 | Completed final sign-off Jan 2025 | 344 Warren Dr | Standardconstr/Standardroof | reroofingDetails
reroofing | $29,250 |
| Dec 5, 2023 | In progress issued Dec 2023 | 2558 39th Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $25,000 |
| Nov 13, 2023 | In progress issued Nov 2023 | 744 Head St | Standardconstr/Standardroof | reroofingDetails
reroofing | $39,000 |
| Nov 13, 2023 | In progress issued Nov 2023 | 172 Forest Side Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $26,000 |
| Oct 10, 2023 | In progress issued Oct 2023 | 4415 Lincoln Wy | Standardconstr/Standardroof | reroofingDetails
reroofing | $26,000 |
| Oct 10, 2023 | In progress issued Oct 2023 | 1875 16th Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $21,000 |
| Oct 4, 2023 | Never finaled issued Oct 2023, no final | 508 Belvedere St | Standardconstr/Standardroof | reroofingDetails
reroofing | $35,000 |
| Oct 4, 2023 | Never finaled issued Oct 2023, no final | 1724 Fillmore St | Standardconstr/Standardroof | reroofingDetails
reroofing | $29,000 |
| Sep 29, 2023 | Never finaled issued Sep 2023, no final | 2247 25th Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $39,000 |
| Sep 29, 2023 | Never finaled issued Sep 2023, no final | 33 Heather Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $44,000 |
| Sep 5, 2023 | Never finaled issued Sep 2023, no final | 2040 Scott St | Standardconstr/Standardroof | reroofingDetails
reroofing | $55,000 |
| Sep 5, 2023 | Never finaled issued Sep 2023, no final | 84 Fortuna Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $56,000 |
| Aug 11, 2023 | Never finaled issued Aug 2023, no final | 205 Downey St | Standardconstr/Standardroof | reroofingDetails
reroofing | $49,000 |
| Aug 11, 2023 | Never finaled issued Aug 2023, no final | 144 09th Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $60,000 |
| Aug 1, 2023 | Never finaled issued Aug 2023, no final | 1881 Pine St | Standardconstr/Standardroof | reroofingDetails
reroofing | $27,000 |
| Jul 17, 2023 | Never finaled issued Jul 2023, no final | 52 Coleridge St | Standardconstr/Standardroof | reroofingDetails
reroofing | $27,000 |
| Jul 17, 2023 | Completed final sign-off Jul 2023 | 332 Pierce St | Standardconstr/Standardroof | remove and replace dry rot damaged wood siding in northside lightwellDetails
remove and replace dry rot damaged wood siding in northside lightwell | $8,000 |
| Jun 26, 2023 | Completed final sign-off Jun 2023 | 639 Lyon St | Standardconstr/Standardroof | reroofingDetails
reroofing | $9,000 |
| Jun 22, 2023 | Completed final sign-off Jul 2023 | 1434 10th Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $25,000 |
| Jun 22, 2023 | Never finaled issued Jun 2023, no final | 140 09th Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $40,000 |
| Jun 6, 2023 | Never finaled issued Jun 2023, no final | 2424 28th Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $15,000 |
| Jun 6, 2023 | Never finaled issued Jun 2023, no final | 179 14th Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $50,000 |
| May 24, 2023 | Completed final sign-off Aug 2023 | 245 Downey St | Standardconstr/Standardroof | reroofingDetails
reroofing | $65,000 |
| May 24, 2023 | Completed final sign-off Jun 2023 | 2443 Lincoln Wy | Standardconstr/Standardroof | reroofingDetails
reroofing | $39,000 |
| Apr 3, 2023 | Never finaled issued Apr 2023, no final | 1404 Church St | Standardconstr/Standardroof | reroofingDetails
reroofing | $40,000 |
| Apr 3, 2023 | Never finaled issued Apr 2023, no final | 825 Burnett Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $100,000 |
| Feb 14, 2023 | Completed final sign-off Apr 2023 | 90 Jersey St | Standardconstr/Standardroof | reroofingDetails
reroofing | $30,000 |
| Feb 7, 2023 | Completed final sign-off Apr 2023 | 150 Santa Ana Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $35,000 |
| Feb 7, 2023 | Expired or cancelled cancelled Aug 2023 | 946 Ingerson Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $30,000 |
| Dec 13, 2022 | Completed final sign-off Apr 2023 | 639 Lyon St | Standardconstr/Standardroof | reroofingDetails
reroofing | $45,000 |
| Nov 15, 2022 | Never finaled issued Nov 2022, no final | 2412 28th Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $30,000 |
| Nov 15, 2022 | Never finaled issued Nov 2022, no final | 40 25th Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $30,000 |
| Jul 25, 2022 | Never finaled issued Jul 2022, no final | 911 Lincoln Wy | Standardconstr/Standardroof | reroofingDetails
reroofing | $18,000 |
| Jul 20, 2022 | Never finaled issued Jul 2022, no final | 3701 22nd St | Standardconstr/Standardroof | reroofing.Details
reroofing. | $20,000 |
| Jul 20, 2022 | Never finaled issued Jul 2022, no final | 2932 Jackson St | Standardconstr/Standardroof | reroofing.Details
reroofing. | $49,000 |
| Jul 13, 2022 | Never finaled issued Jul 2022, no final | 3421 Clement St | Standardconstr/Standardroof | reroofingDetails
reroofing | $26,000 |
| Jul 13, 2022 | Completed final sign-off Aug 2022 | 2610 Lake St | Standardconstr/Standardroof | reroofingDetails
reroofing | $83,000 |
| Jul 13, 2022 | Never finaled issued Jul 2022, no final | 2666 Pine St | Standardconstr/Standardroof | reroofingDetails
reroofing | $56,000 |
| Jun 28, 2022 | Completed final sign-off Jun 2023 | 1542 44th Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $16,000 |
| Jun 24, 2022 | Never finaled issued Jun 2022, no final | 2026 44th Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $17,000 |
| May 19, 2022 | Completed final sign-off Jun 2022 | 25 Guerrero St | Standardconstr/Standardroof | reroofingDetails
reroofing | $23,000 |
| Apr 26, 2022 | Never finaled issued Apr 2022, no final | 2079 17th Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $25,000 |
| Apr 21, 2022 | Never finaled issued Apr 2022, no final | 230 Santa Clara Av | Standardconstr/Standardroof | reroofing. tear off shingles, install galvanized metal eave, gaf storm guar/tiger paw, new galvanized metal grip flashing, gaf pro start/timberline shingles, remove tar/gravel, install (1) layer fiberglass base sheet, (3) ply, #11 lb. fiberglass plysheet, (1) layer sbs rubber cap sheetDetails
reroofing. tear off shingles, install galvanized metal eave, gaf storm guar/tiger paw, new galvanized metal grip flashing, gaf pro start/timberline shingles, remove tar/gravel, install (1) layer fiberglass base sheet, (3) ply, #11 lb. fiberglass plysheet, (1) layer sbs rubber cap sheet | $28,000 |
| Apr 5, 2022 | Never finaled issued Apr 2022, no final | 1260 08th Av | Standardconstr/Standardroof | reroofing. remove shingle layers, install new galvanized metal eaves/gutter lines, gaf 5 part (storm guard, tiger paw, prostart), gaf timberline ultra hd shingles, reroof built-in gutters, 2 lightwells, replace drain, vents, etc., as neededDetails
reroofing. remove shingle layers, install new galvanized metal eaves/gutter lines, gaf 5 part (storm guard, tiger paw, prostart), gaf timberline ultra hd shingles, reroof built-in gutters, 2 lightwells, replace drain, vents, etc., as needed | $22,150 |
| Mar 10, 2022 | Never finaled issued Mar 2022, no final | 80 Crestline Dr | Standardconstr/Standardroof | reroofingDetails
reroofing | $76,000 |
| Feb 10, 2022 | Never finaled issued Feb 2022, no final | 419 Central Av | Standardconstr/Standardroof | reroofing.Details
reroofing. | $25,000 |