Lloyd Fruchtman
- License
- C37925
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Apr 2022 to May 2025
3 permits since 2000 (architect on 3 permits): 1 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Premier Structures Inc (2)
- Engineers
- Abby Banerjee
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 9, 2025 | In progress issued Jun 2025 | 75 Geary St | Premier Structures Inc | minor interior renovation to extg retail space inc. lighting, cabinetry, finishes, & partition work. electrical will be modified for new lighting & power, low voltage systems will be installed, hvac existing & with the addtion of outside air & rework of distribution only.Details
minor interior renovation to extg retail space inc. lighting, cabinetry, finishes, & partition work. electrical will be modified for new lighting & power, low voltage systems will be installed, hvac existing & with the addtion of outside air & rework of distribution only. | $180,375 |
| Apr 25, 2022 | Expired or cancelled cancelled Jan 2026 | 2109 Fillmore St | install 1 new, non-electric, single faced wall sign. (moscot)Details
install 1 new, non-electric, single faced wall sign. (moscot) | $2,000 | |
| Apr 25, 2022 | Never finaled issued Jul 2022, no final | 2109 Fillmore St | Premier Structures Inc | renovation to (e) retail space: lighting, cabinetry finishes & partition work. elec - (n) lighting, power & minor (n) plumbing added. low voltage systems. hvac will be split systems w/ air handlers & condension units. (n) storefront system. mino demolition. no change to occupancy. no structural workDetails
renovation to (e) retail space: lighting, cabinetry finishes & partition work. elec - (n) lighting, power & minor (n) plumbing added. low voltage systems. hvac will be split systems w/ air handlers & condension units. (n) storefront system. mino demolition. no change to occupancy. no structural work | $148,000 |