Permit GraphShortlistSan Francisco building permits since 2000

Leandro Cabulay Columna

License
852468
State contractor license record
Listed as
contractor, designer
Firm
L Columna General Contractor
Based in
Concord
On San Francisco permits
Jun 2007 to Jun 2026

7 permits since 2000 (contractor on 6 permits, designer on 1 permit): 4 completed, 2 in progress, 1 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 10, 2026In progress
filed Jun 2026, not yet issued
478 Orizaba Avconvert g/f to j-adu. install new walls, insulation, window, door, bathroom,kitchen, electrical, plumbing, mini-split system, painting.
Details
Permit
202606102964
Status
triage
Filed
Jun 10, 2026
Declared cost
$25,000
Address
478 Orizaba Av

convert g/f to j-adu. install new walls, insulation, window, door, bathroom,kitchen, electrical, plumbing, mini-split system, painting.

Open the permit page

$25,000
Sep 15, 2025In progress
issued Sep 2025
478 Orizaba AvL Columna General Contractorreplace in kind kitchen cabinets, counter tops, sink, faucet, p trap. repalce old outlets and wires. repplace in kind shower, lavatory, toilet, and paint bathroom. like for like.
Details
Permit
202509155317
Status
issued
Filed
Sep 15, 2025
Permit issued
Sep 15, 2025
Declared cost
$18,000
Address
478 Orizaba Av

replace in kind kitchen cabinets, counter tops, sink, faucet, p trap. repalce old outlets and wires. repplace in kind shower, lavatory, toilet, and paint bathroom. like for like.

Open the permit page

$18,000
Feb 22, 2024Completed
final sign-off Oct 2024
261 Chicago WyL Columna General Contractorrevision to pa#202310178843 revise scope of work to" this permit is for work to be performed in general conformance with the california existing building code (cebc) appendix chapter a3 (sfbc ab-108)
Details
Permit
202402226398
Status
complete
Filed
Feb 22, 2024
Permit issued
Feb 26, 2024
Final sign-off
Oct 18, 2024
Address
261 Chicago Wy

revision to pa#202310178843 revise scope of work to" this permit is for work to be performed in general conformance with the california existing building code (cebc) appendix chapter a3 (sfbc ab-108)

Open the permit page

Feb 5, 2024Completed
final sign-off Apr 2024
119 Delano AvL Columna General Contractorbathroom remodel. replacing flooring with like for like material. replacing tub with stand alone (relocate plumbing lines). relocating toilet. replacing double sink with single. removing dividing wall btwn tub & shower. install 4 ceiling canned lights. replacing wall tiling like for like.
Details
Permit
202402055233
Status
complete
Filed
Feb 5, 2024
Permit issued
Feb 5, 2024
Final sign-off
Apr 30, 2024
Declared cost
$17,850
Address
119 Delano Av

bathroom remodel. replacing flooring with like for like material. replacing tub with stand alone (relocate plumbing lines). relocating toilet. replacing double sink with single. removing dividing wall btwn tub & shower. install 4 ceiling canned lights. replacing wall tiling like for like.

Open the permit page

$17,850
Oct 17, 2023Completed
final sign-off Oct 2024
261 Chicago WyL Columna General Contractorvoluntary structural strengthening at ground floor
Details
Permit
202310178843
Status
complete
Filed
Oct 17, 2023
Permit issued
Feb 1, 2024
Final sign-off
Oct 18, 2024
Declared cost
$12,500
Address
261 Chicago Wy

voluntary structural strengthening at ground floor

Open the permit page

$12,500
Sep 13, 2022Completed
final sign-off Oct 2022
357 Elizabeth StL Columna General Contractor1 bathroom remodel: replace tub and shower. tile on floor and walls, replace toilet, sink, and faucet. install vanity and painting. no alteration of wall, window, or door.
Details
Permit
202209132362
Status
complete
Filed
Sep 13, 2022
Permit issued
Sep 13, 2022
Final sign-off
Oct 19, 2022
Declared cost
$15,225
Address
357 Elizabeth St

1 bathroom remodel: replace tub and shower. tile on floor and walls, replace toilet, sink, and faucet. install vanity and painting. no alteration of wall, window, or door.

Open the permit page

$15,225
Jun 29, 2007Never finaled
issued Jul 2008, no final
25 Baker StL Columna General Contractorrenovation of ground floor and basement floor. floor & partition walls to finishing. convert unoccupied basement to habitable rooms.
Details
Permit
200706295601
Status
issued
Filed
Jun 29, 2007
Permit issued
Jul 8, 2008
Declared cost
$58,000
Address
25 Baker St

renovation of ground floor and basement floor. floor & partition walls to finishing. convert unoccupied basement to habitable rooms.

Open the permit page