L Columna General Contractor
- Based in
- Concord
- On San Francisco permits
- Jun 2007 to Sep 2025
- Last 24 months
- 1 permit filed
6 permits since 2000: 4 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 15, 2025 | In progress issued Sep 2025 | 478 Orizaba Av | replace in kind kitchen cabinets, counter tops, sink, faucet, p trap. repalce old outlets and wires. repplace in kind shower, lavatory, toilet, and paint bathroom. like for like.Details
replace in kind kitchen cabinets, counter tops, sink, faucet, p trap. repalce old outlets and wires. repplace in kind shower, lavatory, toilet, and paint bathroom. like for like. | $18,000 |
| Feb 22, 2024 | Completed final sign-off Oct 2024 | 261 Chicago Wy | revision to pa#202310178843 revise scope of work to" this permit is for work to be performed in general conformance with the california existing building code (cebc) appendix chapter a3 (sfbc ab-108)Details
revision to pa#202310178843 revise scope of work to" this permit is for work to be performed in general conformance with the california existing building code (cebc) appendix chapter a3 (sfbc ab-108) | |
| Feb 5, 2024 | Completed final sign-off Apr 2024 | 119 Delano Av | bathroom remodel. replacing flooring with like for like material. replacing tub with stand alone (relocate plumbing lines). relocating toilet. replacing double sink with single. removing dividing wall btwn tub & shower. install 4 ceiling canned lights. replacing wall tiling like for like.Details
bathroom remodel. replacing flooring with like for like material. replacing tub with stand alone (relocate plumbing lines). relocating toilet. replacing double sink with single. removing dividing wall btwn tub & shower. install 4 ceiling canned lights. replacing wall tiling like for like. | $17,850 |
| Oct 17, 2023 | Completed final sign-off Oct 2024 | 261 Chicago Wy | voluntary structural strengthening at ground floorDetails
voluntary structural strengthening at ground floor | $12,500 |
| Sep 13, 2022 | Completed final sign-off Oct 2022 | 357 Elizabeth St | 1 bathroom remodel: replace tub and shower. tile on floor and walls, replace toilet, sink, and faucet. install vanity and painting. no alteration of wall, window, or door.Details
1 bathroom remodel: replace tub and shower. tile on floor and walls, replace toilet, sink, and faucet. install vanity and painting. no alteration of wall, window, or door. | $15,225 |
| Jun 29, 2007 | Never finaled issued Jul 2008, no final | 25 Baker St | renovation of ground floor and basement floor. floor & partition walls to finishing. convert unoccupied basement to habitable rooms.Details
renovation of ground floor and basement floor. floor & partition walls to finishing. convert unoccupied basement to habitable rooms. | $58,000 |