Lauren Goldman
- License
- C33828
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect, authorized agent-others
- Firm
- L'oro Designs
- Based in
- San Francisco
- On San Francisco permits
- Jul 2012 to Nov 2026
13 permits since 2000 (architect on 12 permits, authorized agent-others on 1 permit): 10 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Blake Sanford Construction (3), Keen Construction Incorporated (2), Current Construction, K & R Builders Inc, Newel&Co.Inc. Dba:Robertson- Jensen &Co., Nicky Dineen Construction, Vk Construction
- Engineers
- Engin Yagmur (2), Christian Divis, Larry Wong, Robert Smith, Santos & Urrutia
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 8
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 18, 2026 | In progress filed Nov 2026, not yet issued | 250 Jersey St | main & lower kitchen interior remodel replacing plumbing & appliances, finishes, & cabinetry. bath interior remodel throughout house in-kind & same location for fixtures. decorative light fixtures throughtout. new interior paint & door hardware throughout. (e) sliding closet doors replace w/ new.Details
main & lower kitchen interior remodel replacing plumbing & appliances, finishes, & cabinetry. bath interior remodel throughout house in-kind & same location for fixtures. decorative light fixtures throughtout. new interior paint & door hardware throughout. (e) sliding closet doors replace w/ new. | $400,000 | |
| Jun 26, 2019 | Completed final sign-off Mar 2021 | 2816 Broderick St | Blake Sanford Construction | interior remodel of extg 2 story bldg residence include small conversion of extg attached garage partially to conditioned space. adding bath.Details
interior remodel of extg 2 story bldg residence include small conversion of extg attached garage partially to conditioned space. adding bath. | $100,000 |
| May 16, 2019 | Completed final sign-off May 2021 | 1446 Francisco St | Blake Sanford Construction | interior remodel & small addition to (e) 3 story residence with (e) garage. 2 new bed & 1 new bath.Details
interior remodel & small addition to (e) 3 story residence with (e) garage. 2 new bed & 1 new bath. | $125,000 |
| Nov 13, 2018 | Completed final sign-off May 2021 | 1446 Francisco St | Blake Sanford Construction | interior remodel to an (e) three-story residence with an (e) garage. g/f: (n) office & mudroom. remodel (e) 3x bathrooms, kitchen and rooms per plans.Details
interior remodel to an (e) three-story residence with an (e) garage. g/f: (n) office & mudroom. remodel (e) 3x bathrooms, kitchen and rooms per plans. | $500,000 |
| Nov 15, 2017 | Completed final sign-off May 2018 | 1824 Union St | Nicky Dineen Construction | ti for new tenant - electrical upgrade and update change im use (room)Details
ti for new tenant - electrical upgrade and update change im use (room) | $55,000 |
| Jul 31, 2017 | Completed final sign-off Aug 2018 | 1147 Fell St | remodel 2 kitchens & 2 baths. replace/cover all lathe & plaster with drywall. replace side & rear windowsDetails
remodel 2 kitchens & 2 baths. replace/cover all lathe & plaster with drywall. replace side & rear windows | $82,500 | |
| Jul 18, 2017 | Completed final sign-off Dec 2017 | 553 Pacific Av | Vk Construction | 1/f - new lighting at existing office, t.i. under pa#201704244666Details
1/f - new lighting at existing office, t.i. under pa#201704244666 | $5,000 |
| Jun 22, 2017 | Expired or cancelled cancelled Dec 2018 | 1147 Fell St | portion of garage converted to habitable space to include master bedroom with full bath, laundry rm. remodel existing kitchen and bath. all work in lower unitDetails
portion of garage converted to habitable space to include master bedroom with full bath, laundry rm. remodel existing kitchen and bath. all work in lower unit | $340,000 | |
| Jul 14, 2016 | Completed final sign-off Dec 2023 | 417 Mississippi St | Current Construction | vertical & horizontal additional, building back into yard, new front & rear facades, new decks, new interior walls, electrical & plumbing. current 3 bed, 2 bath. change to 5 bed, 4.5 bath.Details
vertical & horizontal additional, building back into yard, new front & rear facades, new decks, new interior walls, electrical & plumbing. current 3 bed, 2 bath. change to 5 bed, 4.5 bath. | $975,000 |
| Feb 16, 2016 | Completed final sign-off Jul 2016 | 2924 Fillmore St | K & R Builders Inc | this project consists of a bathroom addition with the footprint of the (e) building. no walls to be demolished.Details
this project consists of a bathroom addition with the footprint of the (e) building. no walls to be demolished. | $6,000 |
| Mar 13, 2014 | Completed final sign-off Jul 2014 | 33 Clementina St | Keen Construction Incorporated | expansion of (e) mezzanine @ 3rd floor unit (5) & redefinition of mezzanine to be a new story which will include addition of 1 bedroom & bedroom. (e) hvac & sprinkler system to be extended to new bedroom under separate permit. ** maher: compliance with ordinance no# 155-13 not required **Details
expansion of (e) mezzanine @ 3rd floor unit (5) & redefinition of mezzanine to be a new story which will include addition of 1 bedroom & bedroom. (e) hvac & sprinkler system to be extended to new bedroom under separate permit. ** maher: compliance with ordinance no# 155-13 not required ** | $25,000 |
| Jan 27, 2014 | Never finaled issued Feb 2014, no final | 2978 Pine St | Newel&Co.Inc. Dba:Robertson- Jensen &Co. | kitchen remodel and replacement of dining room windows and 3 new skylightsDetails
kitchen remodel and replacement of dining room windows and 3 new skylights | $45,000 |
| Jul 9, 2012 | Completed final sign-off Sep 2012 | 3038 Steiner St | Keen Construction Incorporated | interior remodel in (e) apartment-no exterior renovations to be made, (e) half wall in 3rd bedroom to be made full wall & addition of a closet into the 3rd bedroomDetails
interior remodel in (e) apartment-no exterior renovations to be made, (e) half wall in 3rd bedroom to be made full wall & addition of a closet into the 3rd bedroom | $10,000 |