Larry Friesen
- Listed as
- architect, designer
- Firm
- Friessen Archetects
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to May 2022
22 permits since 2000 (architect on 21 permits, designer on 1 permit): 17 completed, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 19, 2022 | Completed final sign-off Sep 2024 | 3936 20th St | Royal Lyon Construction | construct (n) roof dormer on (e) roof install (n) roofishingles on (e) roof, replace 4 windows in (e) window openings remove (e) bathtub & install (n) bath tub, install (n) bath room vanites, install (n) shower pan in (e) shower refinish (e) wd flrs, replace (e) front porcu flr. with (n) tileDetails
construct (n) roof dormer on (e) roof install (n) roofishingles on (e) roof, replace 4 windows in (e) window openings remove (e) bathtub & install (n) bath tub, install (n) bath room vanites, install (n) shower pan in (e) shower refinish (e) wd flrs, replace (e) front porcu flr. with (n) tile | $175,000 |
| Feb 3, 2022 | Completed final sign-off Jun 2022 | 164 Banks St | Royal Lyon Construction | interior renovation of (e) one kitchen & one bathroom with the (e) space, in-kind. (n) windows replacement will be install in each space & a (n) pati8o door will be install in (e) openings. no change of size or location.(n) cabinets & finishes will be installed. non structural work. all work in kindDetails
interior renovation of (e) one kitchen & one bathroom with the (e) space, in-kind. (n) windows replacement will be install in each space & a (n) pati8o door will be install in (e) openings. no change of size or location.(n) cabinets & finishes will be installed. non structural work. all work in kind | $42,000 |
| Nov 24, 2020 | Completed final sign-off Aug 2021 | 2008 Lyon St | Royal Lyon Construction | interior changes to a single rm within (e) house. (e) office converted to (n) butler's pantry. (n) cabinets, sink w/ gar disp, dw, refrig and wine cooler installed. no new walls will be constructed, no (e) walls removed. 1 (e) window will remain. all work is within (e) envelope. no exterior changesDetails
interior changes to a single rm within (e) house. (e) office converted to (n) butler's pantry. (n) cabinets, sink w/ gar disp, dw, refrig and wine cooler installed. no new walls will be constructed, no (e) walls removed. 1 (e) window will remain. all work is within (e) envelope. no exterior changes | $22,000 |
| Oct 8, 2019 | Completed final sign-off May 2021 | 1977 Green St | 1st floor renovate extg bath. 2nd fl. remove extg recessed lights & install new recessed lights. install 3 nw windows in extg openings. install nw french doors in extg opening. 3rd fl: construct nw bath in extg dressing rm, remove extg bath & connect to nw bedroom. renovate extg bath.Details
1st floor renovate extg bath. 2nd fl. remove extg recessed lights & install new recessed lights. install 3 nw windows in extg openings. install nw french doors in extg opening. 3rd fl: construct nw bath in extg dressing rm, remove extg bath & connect to nw bedroom. renovate extg bath. | $232,200 | |
| Jan 17, 2019 | Completed final sign-off Dec 2020 | 3018 Washington St | Dave Mason Building | interior modification to g/f garage & 1/f unit 3018 washington. garage parking will be enlarged into extg storage to provide 2 tandem parking spaces. the e kitchen & dining will be demolished & new open kitchen. dining & sitting area will b const. e bathroom is demolish 2 n bathrooms are constructedDetails
interior modification to g/f garage & 1/f unit 3018 washington. garage parking will be enlarged into extg storage to provide 2 tandem parking spaces. the e kitchen & dining will be demolished & new open kitchen. dining & sitting area will b const. e bathroom is demolish 2 n bathrooms are constructed | $225,000 |
| Dec 14, 2017 | Expired or cancelled withdrawn Aug 2018 | 825 Duncan St | add a 3rd flr addition to an (e) 2 floor house. the (n) 3rd floor will have (3) bedrms, 2 baths, laundry closet & roof deck. a (n) interior stairs will connect the 3rd flr to 2nd flr causing minor modifications to the 2nd flr.Details
add a 3rd flr addition to an (e) 2 floor house. the (n) 3rd floor will have (3) bedrms, 2 baths, laundry closet & roof deck. a (n) interior stairs will connect the 3rd flr to 2nd flr causing minor modifications to the 2nd flr. | $350,000 | |
| Dec 14, 2016 | Completed final sign-off Jun 2018 | 864 Union St | Dave Mason Building | demolish e kitchen, kitchen storage/laundry and bath. new kitchen with laundry closet and dining area in e space. new bath in e space. add lavatory sink in e water closet spaceDetails
demolish e kitchen, kitchen storage/laundry and bath. new kitchen with laundry closet and dining area in e space. new bath in e space. add lavatory sink in e water closet space | $76,200 |
| Dec 14, 2016 | Completed final sign-off May 2018 | 866 Union St | Dave Mason Building | demolish e bathroom, new bath in space. new sink added in e water closet spaceDetails
demolish e bathroom, new bath in space. new sink added in e water closet space | $23,500 |
| Mar 23, 2016 | Completed final sign-off Dec 2016 | 639 12th Av | Royal Lyon Construction | 2nd flr: demo (e)kitchen & powder rm, install new kitchen & powder rm within (e)spaces,3rd flr: demo (e) en suite bathrm, install a new bathrm in space. all construction is within (e)bldg envelope.no new addition or sq.ft. will be added.Details
2nd flr: demo (e)kitchen & powder rm, install new kitchen & powder rm within (e)spaces,3rd flr: demo (e) en suite bathrm, install a new bathrm in space. all construction is within (e)bldg envelope.no new addition or sq.ft. will be added. | $35,200 |
| Dec 21, 2015 | Expired or cancelled disapproved Sep 2018 | 3560 Jackson St | metal emergency platfors were install at levls 4,3&2 to provide access to the(e)original ladder at the exterior read wall. the platforms were installed without bldg permit. this appln is for review & approval of the emergency escape. platform addressing complian #13085Details
metal emergency platfors were install at levls 4,3&2 to provide access to the(e)original ladder at the exterior read wall. the platforms were installed without bldg permit. this appln is for review & approval of the emergency escape. platform addressing complian #13085 | $7,690 | |
| Sep 17, 2015 | Never finaled issued Oct 2015, no final | 162 Alhambra St | Build To Please | construct a new res. unit in an (e) 2 unit, 3 story bld. the new unit will be on the ground floor, within the (e) envelope in (e) garage & storage space, the unit will have liv & dining arears, kitchen, 1 bath, 1 bedrm. automatic fire sprinklers wll be installed throughout grnd lvl -under sep permitDetails
construct a new res. unit in an (e) 2 unit, 3 story bld. the new unit will be on the ground floor, within the (e) envelope in (e) garage & storage space, the unit will have liv & dining arears, kitchen, 1 bath, 1 bedrm. automatic fire sprinklers wll be installed throughout grnd lvl -under sep permit | $305,000 |
| Jul 15, 2015 | Completed final sign-off Sep 2015 | 639 12th Av | Royal Lyon Construction | remove existing deck, replace with new deck.Details
remove existing deck, replace with new deck. | $8,000 |
| Apr 23, 2015 | Expired or cancelled cancelled Oct 2017 | 2 Romain St | Royal Lyon Construction | a new vertical addition to (e) 2 story single family res'd. add a 3rd level to an (e) 2 level house. constructed over a porton of the (e) roof. the (n) 3rd level will have a home office, multi purpose rm. a media area & bathrm. a roof deck will also be constructed. a (n) interior stairs will be addDetails
a new vertical addition to (e) 2 story single family res'd. add a 3rd level to an (e) 2 level house. constructed over a porton of the (e) roof. the (n) 3rd level will have a home office, multi purpose rm. a media area & bathrm. a roof deck will also be constructed. a (n) interior stairs will be add | $230,000 |
| Jun 19, 2014 | Completed final sign-off Jan 2015 | 2237 15th Av | Royal Lyon Construction | demolition of existing kitchen and bath on second floor. relocation of kitchen and add home office. remodel existing bathroom. replace existing windows per plan and all windows are not visible from street. relocation and install new furnace. relocate existing water heater.Details
demolition of existing kitchen and bath on second floor. relocation of kitchen and add home office. remodel existing bathroom. replace existing windows per plan and all windows are not visible from street. relocation and install new furnace. relocate existing water heater. | $58,000 |
| Jan 28, 2014 | Completed final sign-off Mar 2015 | 498 Capistrano Av | Dave Mason Building | construct (n) 2-story addition. lower level will be a covered (new bath above) open air exit passage & garden area. upper level will have a (n) bathrm. 2 (e) windows will be removed & opening in filled. 3 (e) window will be replaced w/(n) windows. all of these are in the side & rear yards.Details
construct (n) 2-story addition. lower level will be a covered (new bath above) open air exit passage & garden area. upper level will have a (n) bathrm. 2 (e) windows will be removed & opening in filled. 3 (e) window will be replaced w/(n) windows. all of these are in the side & rear yards. | $61,200 |
| Jun 17, 2011 | Completed final sign-off Dec 2011 | 5 Saturn St | Royal Lyon Construction | remove two existing windows that leak, enlarge window openings. install two new windows. patch & repair existing interior & exterior wall finishes as required. window are located at rear of the bldg. not visible from street.Details
remove two existing windows that leak, enlarge window openings. install two new windows. patch & repair existing interior & exterior wall finishes as required. window are located at rear of the bldg. not visible from street. | $6,000 |
| Nov 21, 2006 | Never finaled issued Nov 2006, no final | 74 Aztec St | Royal Lyon Construction | construct half bath on lower level of (e) house. this is a construction modification to work under appl#200601182434Details
construct half bath on lower level of (e) house. this is a construction modification to work under appl#200601182434 | $6,400 |
| Mar 3, 2006 | Completed final sign-off Jan 2007 | 2647 Leavenworth St | Upscale Construction Inc. | construction of a multi purpose room with bath room within extg storage area on the 1st floor/construct a new exterior stairway from the 3rd floor to an extg deck/minor modification to extg decksDetails
construction of a multi purpose room with bath room within extg storage area on the 1st floor/construct a new exterior stairway from the 3rd floor to an extg deck/minor modification to extg decks | $38,000 |
| Jan 18, 2006 | Completed final sign-off Aug 2007 | 74 Aztec St | Royal Lyon Construction | add a 3rd level to the (e) house for 2 new bedrooms & 1 bathroom. add a new interior & exterior stairway. renovate (e) kitchen, add a powder room & convert (e) bedroom into dinning room on (e) 2nd floor.Details
add a 3rd level to the (e) house for 2 new bedrooms & 1 bathroom. add a new interior & exterior stairway. renovate (e) kitchen, add a powder room & convert (e) bedroom into dinning room on (e) 2nd floor. | $305,000 |
| Jan 18, 2006 | Completed final sign-off Jan 2007 | 2647 Leavenworth St | Upscale Construction Inc. | demolish (e) kitchen & bathroom. install new kitchen & 2 bathooms. install new skylight. install new cabinetry.Details
demolish (e) kitchen & bathroom. install new kitchen & 2 bathooms. install new skylight. install new cabinetry. | $210,000 |
| Jul 8, 2005 | Completed final sign-off Jul 2005 | 730 Polk St | E B W Builders Inc | revise to app #2005/02/17/5717 change ada requirements from 100% complying in 4th floor bathrms toDetails
revise to app #2005/02/17/5717 change ada requirements from 100% complying in 4th floor bathrms to | |
| Nov 24, 2004 | Completed final sign-off Sep 2006 | 84 Mangels Av | remove (e) single story non complying addition in rear yard const. nfew single story addition in**Details
remove (e) single story non complying addition in rear yard const. nfew single story addition in** | $120,000 |