Kourosh Baradaran
- License
- C26517
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Kourosh Baradaran Arch.
- Based in
- Belvedere
- On San Francisco permits
- Feb 2008 to Apr 2014
5 permits since 2000 (architect on 5 permits): 4 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- M-Projects (4), Everbuilt Construction, Inc.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 15, 2014 | Completed final sign-off Jul 2014 | 2027 Fillmore St | Everbuilt Construction, Inc. | accessibility upgrade at extg 2 restrooms serving extg retail spaces. interior remodel only.Details
accessibility upgrade at extg 2 restrooms serving extg retail spaces. interior remodel only. | $45,000 |
| Sep 27, 2010 | Completed final sign-off Jul 2012 | 3020 Laguna St | M-Projects | to demolish 2 stories, single family residence.Details
to demolish 2 stories, single family residence. | $10,000 |
| Sep 27, 2010 | Never finaled issued Mar 2012, no final | 3020 Laguna St | M-Projects | to erect 4 stories, 2 units residential building.Details
to erect 4 stories, 2 units residential building. | $400,000 |
| Mar 16, 2009 | Completed final sign-off Dec 2009 | 3051 Clay St | M-Projects | convert closet to full bathroom, add a door.Details
convert closet to full bathroom, add a door. | $10,000 |
| Feb 4, 2008 | Completed final sign-off Nov 2009 | 1155 Vallejo St | M-Projects | new third floor vertical addition for 2 bedrooms, 2 bathrooms to (e) 2-story building; 1st floor: new bedroom, bath, stair and laundry; 2nd floor: fill (e) deck for new bedroom and remove part of kitchen for a new deck; 2 bath & mew roof decks on 2nd and 3rd floors.Details
new third floor vertical addition for 2 bedrooms, 2 bathrooms to (e) 2-story building; 1st floor: new bedroom, bath, stair and laundry; 2nd floor: fill (e) deck for new bedroom and remove part of kitchen for a new deck; 2 bath & mew roof decks on 2nd and 3rd floors. | $185,000 |