Jamie L. Knollmiller
- Listed as
- architect
- Firm
- Knollmiller Architects
- Based in
- Irvine
- On San Francisco permits
- Sep 2020 to May 2023
5 permits since 2000 (architect on 5 permits): 5 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 31, 2023 | Completed final sign-off Aug 2023 | 2765 16th St | Constructive Solutions Inc. | installation of factory prefabricated rooftop unit curbs on (e) concrete curbs and (02) factory prefabricated exhaust fan curbsDetails
installation of factory prefabricated rooftop unit curbs on (e) concrete curbs and (02) factory prefabricated exhaust fan curbs | $15,000 |
| Jan 13, 2022 | Completed final sign-off Feb 2022 | 2765 16th St | Constructive Solutions Inc. | revisoin to pa 2021-0608-1938 to add shotcrete to north wall and memorialize correct and verified roof height dimensions. no added height to roof from approved scope under 2021-0608-1938Details
revisoin to pa 2021-0608-1938 to add shotcrete to north wall and memorialize correct and verified roof height dimensions. no added height to roof from approved scope under 2021-0608-1938 | |
| Oct 22, 2021 | Completed final sign-off Jan 2022 | 2765 16th St | Constructive Solutions Inc. | revision to pa 202106081938 to lower parapet height due to parapet wall thinness discovered in the field.Details
revision to pa 202106081938 to lower parapet height due to parapet wall thinness discovered in the field. | |
| Jun 8, 2021 | Completed final sign-off Jan 2023 | 2765 16th St | Constructive Solutions Inc. | remodel of (e) 174,160 sf building to create (n) tenant suites, suite a suite b & suite c, building uprades incl. replacement of roof, storefront system, seismic and structural upgrades, mep deferredDetails
remodel of (e) 174,160 sf building to create (n) tenant suites, suite a suite b & suite c, building uprades incl. replacement of roof, storefront system, seismic and structural upgrades, mep deferred | $2,162,160 |
| Sep 27, 2020 | Completed final sign-off Dec 2021 | 2765 16th St | Constructive Solutions Inc. | demolition of non-structural interior partitions walls & (e) 2nd fl per ab-017. maher n/aDetails
demolition of non-structural interior partitions walls & (e) 2nd fl per ab-017. maher n/a | $20,000 |