Jorge Romero
- License
- C67729
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C67729 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Sustainable-Ce
- Based in
- San Francisco
- On San Francisco permits
- Jun 2024 to Aug 2026
6 permits since 2000 (architect on 3 permits, engineer on 3 permits): 1 completed, 2 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Sf Craftsman
- Architects
- Landscape Architect Jimmy H Chan
- Engineers
- Albert Urrutia
Where they worked
- Single-family 4
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 31, 2026 | In progress filed Aug 2026, not yet issued | 112 Kirkwood Av | common area work only, within (e) common landscape spaces for mariners village community will implement 6 bioretention planters (brp's) & related improvements incl. 1)underdrains related to cleanouts & overflow drain, 2)concrete retainers, 3)excavation of soils; 4)liner at bottom of brp's; 5)placemeDetails
common area work only, within (e) common landscape spaces for mariners village community will implement 6 bioretention planters (brp's) & related improvements incl. 1)underdrains related to cleanouts & overflow drain, 2)concrete retainers, 3)excavation of soils; 4)liner at bottom of brp's; 5)placeme | $892,524 | |
| Mar 16, 2026 | Expired or cancelled cancelled Apr 2026 | 71 Margaret Av | build 160 sqft deck in the back part of the house including stairs from 2nd floor to garden. create two new door openings to access deck.Details
build 160 sqft deck in the back part of the house including stairs from 2nd floor to garden. create two new door openings to access deck. | $6,100 | |
| Dec 9, 2025 | Expired or cancelled cancelled Jan 2026 | 1780 Revere Av | new deck with stairs leading to backyard. add door to access deck from 2/f.Details
new deck with stairs leading to backyard. add door to access deck from 2/f. | $13,000 | |
| Aug 16, 2024 | In progress filed Aug 2024, not yet issued | 98 Cortland Av | to erect a 1-story,type v,no basement. 1-adu detached strcucture at rear of main building.Details
to erect a 1-story,type v,no basement. 1-adu detached strcucture at rear of main building. | $100,000 | |
| Aug 8, 2024 | Completed final sign-off Mar 2026 | 61 Majestic Av | Sf Craftsman | to comply with nov 202376545 for dpw encorachment to adjust and meet code requierments at (e) non conforming property line fence at front property line adjust height from 6ft to 3ftDetails
to comply with nov 202376545 for dpw encorachment to adjust and meet code requierments at (e) non conforming property line fence at front property line adjust height from 6ft to 3ft | $3,000 |
| Jun 25, 2024 | Expired or cancelled cancelled Jul 2024 | 98 Cortland Av | to erect a 1-story, 1-adu detached strcucture at rear of main building.Details
to erect a 1-story, 1-adu detached strcucture at rear of main building. | $75,000 |