Pedro Campos
- Listed as
- authorized agent-others, contractor
- Firm
- P C Building And Construction
- Based in
- San Jose
- On San Francisco permits
- Sep 2019 to Apr 2024
11 permits since 2000 (contractor on 11 permits, authorized agent-others on 1 permit): 10 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 19, 2024 | Completed final sign-off Jul 2024 | 2890 California St | P C Building And Construction | unit 105: one kitchen replace in kind: cabinets, counters, and appliances. add dishwasher- one bathroom, bathtub replace with shower and tiles. replace existing subpanel.Details
unit 105: one kitchen replace in kind: cabinets, counters, and appliances. add dishwasher- one bathroom, bathtub replace with shower and tiles. replace existing subpanel. | $30,000 |
| Jul 18, 2023 | Completed final sign-off Aug 2023 | 2799 California St | P C Building And Construction | demo wood partition wall. space is vacant. demo per ab-017.Details
demo wood partition wall. space is vacant. demo per ab-017. | $1,500 |
| Apr 21, 2023 | Completed final sign-off Apr 2023 | 1421 Quint St | P C Building And Construction | roofingDetails
roofing | $10,000 |
| Jul 8, 2022 | Completed final sign-off Mar 2023 | 60 Fair Av | P C Building And Construction | convert main level washer and dryer closet to half bath. relocate washer and dryer to upper level closet.Details
convert main level washer and dryer closet to half bath. relocate washer and dryer to upper level closet. | $6,000 |
| Mar 16, 2022 | Completed final sign-off Jul 2022 | 1141 Post St | P C Building And Construction | legalize laundry room to comply with nov 202174711, 202174868, 202184215, 202174875Details
legalize laundry room to comply with nov 202174711, 202174868, 202184215, 202174875 | $5,000 |
| Nov 2, 2021 | Completed final sign-off May 2022 | 2651 20th Av | P C Building And Construction | rev. to 2021-0211-4503: remove existing unpermitted skylights from lower rear roof & patch back. more over washer/dryer location within kitchen of adu because of (e)plumbing drainn line. remove(e)whirlpool tub in adu & replace with shower.Details
rev. to 2021-0211-4503: remove existing unpermitted skylights from lower rear roof & patch back. more over washer/dryer location within kitchen of adu because of (e)plumbing drainn line. remove(e)whirlpool tub in adu & replace with shower. | $10,000 |
| Oct 25, 2021 | Completed final sign-off Dec 2021 | 2890 California St | P C Building And Construction | addition of laundry room (2 washers & 2 gas dryers) to building ground level.Details
addition of laundry room (2 washers & 2 gas dryers) to building ground level. | $20,000 |
| Jul 22, 2021 | Completed final sign-off Jul 2022 | 960 Bay St | P C Building And Construction | unit 6: interior remodel. new partition wall to create a new bedroom, new egress windows. new bath at existing living room, new kitchen layout and kitchen cabinet to be replaced.Details
unit 6: interior remodel. new partition wall to create a new bedroom, new egress windows. new bath at existing living room, new kitchen layout and kitchen cabinet to be replaced. | $40,000 |
| Jul 22, 2021 | Expired or cancelled withdrawn Jun 2022 | 2651 20th Av | P C Building And Construction | new duct chase at second flr in artrium for new mechanical ducts to exhaust at roof. emergency escape and rescue route, opening to 60' rear yard.Details
new duct chase at second flr in artrium for new mechanical ducts to exhaust at roof. emergency escape and rescue route, opening to 60' rear yard. | $30,000 |
| Feb 11, 2021 | Completed final sign-off Apr 2022 | 2651 20th Av | P C Building And Construction | legalize existing unit as adu from 1980s with code required compliance upgrades and interior remodel. existing garage with code required upgrades to remain. provide a 1-hr exit and emergency escape and rescue route.Details
legalize existing unit as adu from 1980s with code required compliance upgrades and interior remodel. existing garage with code required upgrades to remain. provide a 1-hr exit and emergency escape and rescue route. | $50,000 |
| Sep 16, 2019 | Completed final sign-off Feb 2020 | 250 Point Lobos Av | P C Building And Construction | apt 302: add bedroom, removel/add interior walls, reconfigure closets, lighting to modified spaces.Details
apt 302: add bedroom, removel/add interior walls, reconfigure closets, lighting to modified spaces. | $10,000 |