Permit GraphShortlistSan Francisco building permits since 2000

Brittany D. Dhawan

License
C36879
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C36879 at the Board for Professional Engineers
Listed as
architect, authorized agent-others, engineer
Firm
Studio 144
Based in
Oakland
On San Francisco permits
Jan 2019 to Jan 2026

13 permits since 2000 (architect on 10 permits, authorized agent-others on 2 permits, engineer on 1 permit): 9 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Curran & Associates General Contractors (2), P C Building And Construction (2), Add A Garage Inc., California Mobility Inc, Crane Construction Company Inc., Vision Builders
Architects
Robert Sargenti
Engineers
Benjamin Lai

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jan 6, 2026In progress
issued Oct 2026
204 Ortega Stlegalize (e) space on ground floor as an adu state program. upgrade exit corridor to 1 hr rating by addition of gypsum board layer, upgrade ceiling of the exit corridor & garage to 1 hr rating by the addition of a gypsum board layer. enlarge adu unit bedroom window to eero req's. replace 2 doors for
Details
Permit
202511139498
Permit issued
Oct 28, 2026

legalize (e) space on ground floor as an adu state program. upgrade exit corridor to 1 hr rating by addition of gypsum board layer, upgrade ceiling of the exit corridor & garage to 1 hr rating by the addition of a gypsum board layer. enlarge adu unit bedroom window to eero req's. replace 2 doors for

Open the permit page

$25,000
Jun 21, 2024Completed
final sign-off Sep 2024
1156 Clement Stto permit the work under notice of violation #202420194. an (e) exterior stairs located at the rear of the 1156 clement property was enclosed 10 years ago. additional unpermitted work includes exterior wall and extention of the side walls and a roof.
Details
Permit
202406215008
Permit issued
Jun 27, 2024
Final sign-off
Sep 3, 2024

to permit the work under notice of violation #202420194. an (e) exterior stairs located at the rear of the 1156 clement property was enclosed 10 years ago. additional unpermitted work includes exterior wall and extention of the side walls and a roof.

Open the permit page

$50,000
Jun 5, 2023Completed
final sign-off Jun 2024
2757 Vallejo StAdd A Garage Inc.(n) retaining wall over 2 parcels to provide a replacement for the (e) unreinforced concrete retaining wall covering rear yard line of 2750 broadway. (e) retaining wall to be continuous as shown over part of rear yard of 2757 vallejo st. each of 3 addresses will have same permit application w/ plans
Details
Permit
202306059222
Permit issued
Aug 17, 2023
Final sign-off
Jun 13, 2024

(n) retaining wall over 2 parcels to provide a replacement for the (e) unreinforced concrete retaining wall covering rear yard line of 2750 broadway. (e) retaining wall to be continuous as shown over part of rear yard of 2757 vallejo st. each of 3 addresses will have same permit application w/ plans

Open the permit page

$7,500
Apr 25, 2023Completed
final sign-off May 2023
1256 Folsom Stto comply with abe program ord 51-16 this is a technical infeasibility for an ave program permit is building is a 1911 category a historic building with a 57 1/2" level change from sidewalk level at folsom st and on existing non conforming staircase from street to entries. abe 201912059292
Details
Permit
202304256411
Permit issued
May 9, 2023
Final sign-off
May 22, 2023

to comply with abe program ord 51-16 this is a technical infeasibility for an ave program permit is building is a 1911 category a historic building with a 57 1/2" level change from sidewalk level at folsom st and on existing non conforming staircase from street to entries. abe 201912059292

Open the permit page

Nov 29, 2022Completed
final sign-off Jan 2023
2750 BroadwayCalifornia Mobility Incinstall home elevator between 1st & 2nd floors. stiltz duo model, cut and finish hole in floor for elevator. install 3 form screen at 1st floor.
Details
Permit
202211297296
Permit issued
Dec 21, 2022
Final sign-off
Jan 24, 2023

install home elevator between 1st & 2nd floors. stiltz duo model, cut and finish hole in floor for elevator. install 3 form screen at 1st floor.

Open the permit page

$45,000
Nov 2, 2021Completed
final sign-off May 2022
2651 20th AvP C Building And Constructionrev. to 2021-0211-4503: remove existing unpermitted skylights from lower rear roof & patch back. more over washer/dryer location within kitchen of adu because of (e)plumbing drainn line. remove(e)whirlpool tub in adu & replace with shower.
Details
Permit
202111021631
Permit issued
May 4, 2022
Final sign-off
May 13, 2022

rev. to 2021-0211-4503: remove existing unpermitted skylights from lower rear roof & patch back. more over washer/dryer location within kitchen of adu because of (e)plumbing drainn line. remove(e)whirlpool tub in adu & replace with shower.

Open the permit page

$10,000
Jul 22, 2021Expired or cancelled
withdrawn Jun 2022
2651 20th AvP C Building And Constructionnew duct chase at second flr in artrium for new mechanical ducts to exhaust at roof. emergency escape and rescue route, opening to 60' rear yard.
Details
Permit
202107224871

new duct chase at second flr in artrium for new mechanical ducts to exhaust at roof. emergency escape and rescue route, opening to 60' rear yard.

Open the permit page

$30,000
Dec 1, 2020Completed
final sign-off Nov 2022
400 Precita Avpour new concrete curb and new landing to provide for better accessibility to entry. add power door threshold for requirment of the accessible business entrance program.
Details
Permit
202012019984
Permit issued
Jul 16, 2021
Final sign-off
Nov 29, 2022

pour new concrete curb and new landing to provide for better accessibility to entry. add power door threshold for requirment of the accessible business entrance program.

Open the permit page

$2,500
Nov 19, 2020Never finaled
issued Mar 2021, no final
1943 Divisadero StCurran & Associates General Contractors1943: for compliance with abe program certification - new power door operator, threshold work, new hardware
Details
Permit
202011199245
Permit issued
Mar 16, 2021

1943: for compliance with abe program certification - new power door operator, threshold work, new hardware

Open the permit page

$3,000
Nov 19, 2020Completed
final sign-off Jul 2021
490 Taraval StVision Buildersto comply with abe program per ordinance 51-16 - new power door operator to be installed. new entry door. replacement in kind to existing.
Details
Permit
202011199248
Permit issued
Jul 9, 2021
Final sign-off
Jul 30, 2021

to comply with abe program per ordinance 51-16 - new power door operator to be installed. new entry door. replacement in kind to existing.

Open the permit page

$1,200
Oct 1, 2020Never finaled
issued Feb 2021, no final
1939 Divisadero StCurran & Associates General Contractorsto comply with abe program -technical infeasibility request for upgrading the entrance to accessible for 1939 divisadero street. minor upgrades to hardware at (e) gate and entry door per ordinance 51-16.
Details
Permit
202010015691
Permit issued
Feb 19, 2021

to comply with abe program -technical infeasibility request for upgrading the entrance to accessible for 1939 divisadero street. minor upgrades to hardware at (e) gate and entry door per ordinance 51-16.

Open the permit page

$1,200
Oct 1, 2020Completed
final sign-off Jan 2022
1947 Divisadero Sttechnical infeaibility request for upgrading the entrance to accessible for 1947 divisadero street. minor upgrades to hardware at (e) gate and entry door per ordinance 51-16.
Details
Permit
202010015690
Permit issued
Oct 30, 2020
Final sign-off
Jan 26, 2022

technical infeaibility request for upgrading the entrance to accessible for 1947 divisadero street. minor upgrades to hardware at (e) gate and entry door per ordinance 51-16.

Open the permit page

$1,200
Jan 9, 2019Completed
final sign-off Apr 2019
865 Market StCrane Construction Company Inc.space 106: tenant improvement (e) 1st fl retail space in mall. new interior partitions, new storefront, new hvac sytem, modification of (e) to remain, elec system. maher n/a.
Details
Permit
201901099890
Permit issued
Jan 23, 2019
Final sign-off
Apr 18, 2019

space 106: tenant improvement (e) 1st fl retail space in mall. new interior partitions, new storefront, new hvac sytem, modification of (e) to remain, elec system. maher n/a.

Open the permit page

$150,000