John Popa
- Listed as
- engineer
- Firm
- Popa Engineers
- Based in
- Campbell
- On San Francisco permits
- Jan 2008 to Aug 2014
5 permits since 2000 (engineer on 5 permits): 1 completed, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2014 | Completed final sign-off Sep 2015 | 286 Cumberland St | construction exterior deck to replace existing deck of similar size and location, also a retaining wall of identical size is to be replaced.Details
construction exterior deck to replace existing deck of similar size and location, also a retaining wall of identical size is to be replaced. | $8,000 | |
| Jun 10, 2014 | Never finaled issued Jun 2014, no final | 1330 Waller St | Cal - Bay Craftsmen Inc | revision to apppl #2013.0904.5958, 2014.0212.8421 & 2014.0325.1668 - #1 proposed new underpinning of existing foundaiton. minor ceiling framing modifications.Details
revision to apppl #2013.0904.5958, 2014.0212.8421 & 2014.0325.1668 - #1 proposed new underpinning of existing foundaiton. minor ceiling framing modifications. | $3,000 |
| Jan 7, 2014 | Never finaled issued Apr 2014, no final | 704 Kearny St | Lushov Construction Inc | revision to pa# 201304295711 change fire escape location.Details
revision to pa# 201304295711 change fire escape location. | $1,200 |
| Apr 29, 2013 | Never finaled issued Sep 2013, no final | 704 Kearny St | Lushov Construction Inc | change of occupancy. two facials & cellalite weight loss rooms, plus 1 shower room. one (e) handicap restroom; all on street level. basement; build two facials & weight lost rooms plus one shower, one restroom. one (e) mop sink & washer/dryer assets. 1 heater central air & 1 water heater.Details
change of occupancy. two facials & cellalite weight loss rooms, plus 1 shower room. one (e) handicap restroom; all on street level. basement; build two facials & weight lost rooms plus one shower, one restroom. one (e) mop sink & washer/dryer assets. 1 heater central air & 1 water heater. | $20,000 |
| Jan 11, 2008 | Expired or cancelled cancelled Jul 2010 | 1630 Yosemite Av | 700 sq ft. addition to first & 2nd floor @ rear, 1 master bedroom,1 (n) bedroom, living room (1) full bathrooms. remodelvariour interior at den. garage, family room.Details
700 sq ft. addition to first & 2nd floor @ rear, 1 master bedroom,1 (n) bedroom, living room (1) full bathrooms. remodelvariour interior at den. garage, family room. | $150,000 |