John Bachoua
- License
- E19677
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E19677 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Nazarene Engineering
- Based in
- El Cajon
- On San Francisco permits
- Apr 2024 to Nov 2026
2 permits since 2000 (architect on 1 permit, engineer on 1 permit): 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 1 of 2 have no building type on record and are shown as other.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 5, 2026 | In progress filed Nov 2026, not yet issued | 1388 Sutter St | this project consists of installing (21) level 2 ev charging stations using existing building power. chargers will be installed in the parking garage which is exclusive use of office space tenants.Details
this project consists of installing (21) level 2 ev charging stations using existing building power. chargers will be installed in the parking garage which is exclusive use of office space tenants. | $100,000 | |
| Apr 2, 2024 | In progress filed Apr 2024, not yet issued | 50 08th St | installation of 6 tritium dc fast chargers to supply 12 publicly accesible dc fast charging stalls in hotel garage.ext of bus bar from (e) 4000a 120/208v switchboard to new 2500a/490v ac disconnect.install 750kva 208-480v step up transformer,new 1200a/480v evcs switchboard and 2 tritium power cabs.Details
installation of 6 tritium dc fast chargers to supply 12 publicly accesible dc fast charging stalls in hotel garage.ext of bus bar from (e) 4000a 120/208v switchboard to new 2500a/490v ac disconnect.install 750kva 208-480v step up transformer,new 1200a/480v evcs switchboard and 2 tritium power cabs. | $350,000 |