Jin Tang Zhang
- Listed as
- architect, authorized agent-others
- Firm
- Line & Zhang International
- On San Francisco permits
- Aug 2008 to Jan 2020
7 permits since 2000 (architect on 7 permits, authorized agent-others on 1 permit): 7 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 14, 2020 | Completed final sign-off Jun 2020 | 1042 Divisadero St | revision to pa 2019-0627-4585 add 2 skylightsDetails
revision to pa 2019-0627-4585 add 2 skylights | $800 | |
| Jul 11, 2019 | Completed final sign-off Oct 2019 | 500 Haight St | dining area improvement to include bar counter top, reception area, dining area and hallway.Details
dining area improvement to include bar counter top, reception area, dining area and hallway. | $28,900 | |
| Jun 27, 2019 | Completed final sign-off Jun 2020 | 1042 Divisadero St | Best Forever Construction Company | remodel 3 bathrooms & add new bathroom; replace existing kitchen cabinet; install smoke detectors; install gas shut off valve; modify mep as neededDetails
remodel 3 bathrooms & add new bathroom; replace existing kitchen cabinet; install smoke detectors; install gas shut off valve; modify mep as needed | $38,000 |
| May 24, 2019 | Completed final sign-off Nov 2019 | 320 10th St | Modern Construction Inc | revision to pa 2019-0204-1977 revise mezzanine shower & bathroom layoutDetails
revision to pa 2019-0204-1977 revise mezzanine shower & bathroom layout | |
| Feb 4, 2019 | Completed final sign-off Nov 2019 | 320 10th St | Modern Construction Inc | install aluminum door behind (e) rool-up door. convert (e) bathroom to two new ada bathroom, remodel (e) sair and install handrail, install kitchenette, counter with sink and small refrigerator, renovate (e) bath with shower stall at mezaninne and upgrade ele and plum as needed.Details
install aluminum door behind (e) rool-up door. convert (e) bathroom to two new ada bathroom, remodel (e) sair and install handrail, install kitchenette, counter with sink and small refrigerator, renovate (e) bath with shower stall at mezaninne and upgrade ele and plum as needed. | $60,000 |
| May 17, 2017 | Completed final sign-off Nov 2017 | 1265 Griffith St | Gly Construction Inc | relocate & create new employee bathrooms, including one ada bath and one cleaning area. relocate breakroom for employees. add stair to (e) mezzanine and relocate managers office to (e) mezzanine. n/a for maherDetails
relocate & create new employee bathrooms, including one ada bath and one cleaning area. relocate breakroom for employees. add stair to (e) mezzanine and relocate managers office to (e) mezzanine. n/a for maher | $30,000 |
| Aug 26, 2008 | Completed final sign-off Oct 2008 | 6928 Geary Bl | convert existing office space into hair salon, install 2 hair wash stations, 4 hair cutting stations, cabinets, counter-top & sink for break room, upgrade bathroom to comply with current ada requirements, additional lighting in main area, install ac outlets as required. add overhead flourescent liteDetails
convert existing office space into hair salon, install 2 hair wash stations, 4 hair cutting stations, cabinets, counter-top & sink for break room, upgrade bathroom to comply with current ada requirements, additional lighting in main area, install ac outlets as required. add overhead flourescent lite | $10,000 |