Steven David Molof
- Listed as
- authorized agent-others, contractor
- Firm
- Norcal Remodeling Group Llc
- Based in
- Burlingame
- On San Francisco permits
- Jan 2019 to Jul 2026
66 permits since 2000 (contractor on 66 permits, authorized agent-others on 2 permits): 55 completed, 2 in progress, 9 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 27, 2026 | Completed final sign-off Sep 2026 | 9 Surrey St | Norcal Remodeling Group Llc | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $15,500 |
| Jul 13, 2026 | Completed final sign-off Sep 2026 | 1340 Scott St | Norcal Remodeling Group Llc | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $10,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 601 Van Ness Av | Norcal Remodeling Group Llc | unit #742: combo tub and shower to combo tub and shower replacement. remove tub, install new tub & acrylic walls. install new tile shower pan. install new floors, vanity, mirror/med cabinet, vanity, lights. replace existing fan/light with new gfi outlet at same location.Details
unit #742: combo tub and shower to combo tub and shower replacement. remove tub, install new tub & acrylic walls. install new tile shower pan. install new floors, vanity, mirror/med cabinet, vanity, lights. replace existing fan/light with new gfi outlet at same location. | $10,000 |
| Jun 9, 2026 | Completed final sign-off Aug 2026 | 142 Springfield Dr | Norcal Remodeling Group Llc | demo (e) shower base, valve and wall surrounds. install new therapy walk in tub, valve and acrylic wall surrounds.Details
demo (e) shower base, valve and wall surrounds. install new therapy walk in tub, valve and acrylic wall surrounds. | $20,000 |
| Jun 9, 2026 | Completed final sign-off Sep 2026 | 408 Jersey St | Norcal Remodeling Group Llc | demo (e) tub, valve & surround. install new walk in shower. frame new shower wall, replace sink. replace exhaust fan, sub floor repair, flooring, install can light.Details
demo (e) tub, valve & surround. install new walk in shower. frame new shower wall, replace sink. replace exhaust fan, sub floor repair, flooring, install can light. | $7,500 |
| Mar 27, 2026 | Completed final sign-off May 2026 | 240 Lombard St | Norcal Remodeling Group Llc | unit 726: bathtub to shower conversion w/no alterations to unit layout. replacing floor tile. maintain ada details. 2" max height of threshold. provide back in walls for future grab bars.Details
unit 726: bathtub to shower conversion w/no alterations to unit layout. replacing floor tile. maintain ada details. 2" max height of threshold. provide back in walls for future grab bars. | $24,000 |
| Mar 25, 2026 | Completed final sign-off May 2026 | 3035 23rd Av | Norcal Remodeling Group Llc | bathroom remodel, replace tub for new walk in tub.Details
bathroom remodel, replace tub for new walk in tub. | $20,000 |
| Feb 4, 2026 | Completed final sign-off Apr 2026 | 111 Chestnut St | Norcal Remodeling Group Llc | remove combo shower/tub in master bath. install new acrylic walls & shower pan. remove & replace toilet. replace existing fan/light, heatlamp & gfi plug in guest bath.remove & replace existing shower-replace existing fan/light, heatlamp unit & gfi to code in master bath.Details
remove combo shower/tub in master bath. install new acrylic walls & shower pan. remove & replace toilet. replace existing fan/light, heatlamp & gfi plug in guest bath.remove & replace existing shower-replace existing fan/light, heatlamp unit & gfi to code in master bath. | $20,000 |
| Dec 11, 2025 | Completed final sign-off Feb 2026 | 900 Bush St | Norcal Remodeling Group Llc | unit #202: demo existing tub shower and install new acrylic shower pan, valve and acrylic wall suround minors.Details
unit #202: demo existing tub shower and install new acrylic shower pan, valve and acrylic wall suround minors. | $10,000 |
| Dec 11, 2025 | Completed final sign-off Jan 2026 | 35 Galilee Ln | Norcal Remodeling Group Llc | unit #2: minor bath remodel: r/r shower pan, valve and wall surround. non structural framing modifications.Details
unit #2: minor bath remodel: r/r shower pan, valve and wall surround. non structural framing modifications. | $10,000 |
| Oct 16, 2025 | Completed final sign-off Dec 2025 | 244 03rd Av | Norcal Remodeling Group Llc | unit #2: minor bathroom remodel. r/r existing tub, valve and wall surround with new. replace existing exhaust fan like for like.Details
unit #2: minor bathroom remodel. r/r existing tub, valve and wall surround with new. replace existing exhaust fan like for like. | $23,417 |
| Aug 6, 2025 | Completed final sign-off Jan 2026 | 1910 Divisadero St | Norcal Remodeling Group Llc | unit 6: bathroom redmoel (minor) remove and replace bath tub, valve and surround. no change to layout.Details
unit 6: bathroom redmoel (minor) remove and replace bath tub, valve and surround. no change to layout. | $32,913 |
| Aug 4, 2025 | Completed final sign-off Dec 2025 | 1520 Taylor St | Norcal Remodeling Group Llc | unit#504: minor bathtub remodel, remove and install new bathtub/shower base, valve and surround. no change layout. in kindDetails
unit#504: minor bathtub remodel, remove and install new bathtub/shower base, valve and surround. no change layout. in kind | |
| Jun 26, 2025 | Completed final sign-off Jul 2025 | 460 Carl St | Norcal Remodeling Group Llc | minor bath remodel: remove/replace valve and wall surrounds. install solid surface spray from foam acrylic bathtub. no change to layout like for likeDetails
minor bath remodel: remove/replace valve and wall surrounds. install solid surface spray from foam acrylic bathtub. no change to layout like for like | $10,000 |
| Mar 19, 2025 | In progress issued Mar 2025 | 4773 18th St | Norcal Remodeling Group Llc | re-roofing about 11 squares, no hot works.Details
re-roofing about 11 squares, no hot works. | $15,500 |
| Mar 19, 2025 | Completed final sign-off Aug 2025 | 1314 Plymouth Av | Norcal Remodeling Group Llc | partial bathroom remodel: demo existing valve shower, tub, and surround. install new formed shower pan, valve and acrylic wall surround.Details
partial bathroom remodel: demo existing valve shower, tub, and surround. install new formed shower pan, valve and acrylic wall surround. | $25,000 |
| Feb 21, 2025 | Completed final sign-off Apr 2025 | 3900 California St | Norcal Remodeling Group Llc | unit #2: minor bath remodel. demo shower, valve, trim and surrounds. install new shower, right drain, acrylic wall systen, valve and trim kit, and sliding glass door.Details
unit #2: minor bath remodel. demo shower, valve, trim and surrounds. install new shower, right drain, acrylic wall systen, valve and trim kit, and sliding glass door. | $7,500 |
| Feb 14, 2025 | Completed final sign-off May 2025 | 1440 Broadway | Norcal Remodeling Group Llc | unit #204: demo (e) tub, valve and surround. install new formed acrylic bathtub, valve and acrylic walls. remove and replace toilet.Details
unit #204: demo (e) tub, valve and surround. install new formed acrylic bathtub, valve and acrylic walls. remove and replace toilet. | $7,500 |
| Dec 20, 2024 | Completed final sign-off Mar 2025 | 1744 Bryant St | Norcal Remodeling Group Llc | demo (e) tub, valve, & surround. install new formed shower pan, new valve & new acrylic walls.Details
demo (e) tub, valve, & surround. install new formed shower pan, new valve & new acrylic walls. | $7,500 |
| Dec 10, 2024 | Completed final sign-off Apr 2025 | 650 Chestnut St | Norcal Remodeling Group Llc | unit #406: demo (e) tub, shower, value & surroud. install new formed shower pan,new value & new acrylic wall. no layout changeDetails
unit #406: demo (e) tub, shower, value & surroud. install new formed shower pan,new value & new acrylic wall. no layout change | $25,000 |
| Nov 14, 2024 | Completed final sign-off Feb 2025 | 733 Front St | Norcal Remodeling Group Llc | unit#406 remove existing tub, valve, and surround. install new formed tub, new valve and new acrylic walls. tub to tub, no shower.Details
unit#406 remove existing tub, valve, and surround. install new formed tub, new valve and new acrylic walls. tub to tub, no shower. | $7,500 |
| Sep 30, 2024 | Completed final sign-off Nov 2024 | 67 Silverview Dr | Norcal Remodeling Group Llc | demo existing tub vlve and surround, gfci electrical upgrade iinstall new formed shower pan, new valve, new acrylic walls. 2 bathrooms + half bathroom. no work to toilets, sinks, flooring.Details
demo existing tub vlve and surround, gfci electrical upgrade iinstall new formed shower pan, new valve, new acrylic walls. 2 bathrooms + half bathroom. no work to toilets, sinks, flooring. | $10,000 |
| Aug 20, 2024 | Completed final sign-off Jan 2025 | 362 Stoneridge Ln | Norcal Remodeling Group Llc | guest bath and master bath. demo existing tub, valve, and surround. install new formed shower pan. new valve and new acrylic walls. call for field inspection for start workDetails
guest bath and master bath. demo existing tub, valve, and surround. install new formed shower pan. new valve and new acrylic walls. call for field inspection for start work | $10,000 |
| Jul 18, 2024 | Completed final sign-off Sep 2024 | 1 Daniel Burnham Ct | Norcal Remodeling Group Llc | unit# 1410: minor bathroom remodel. demo (e) tub, valve, and surround. install new formed shower pan. new valve and new acrylic walls.Details
unit# 1410: minor bathroom remodel. demo (e) tub, valve, and surround. install new formed shower pan. new valve and new acrylic walls. | $7,500 |
| Jun 4, 2024 | Completed final sign-off Jul 2024 | 595 Athens St | Norcal Remodeling Group Llc | demo existing tub, valve and surrounding area. install new formed shower pan, new valve and new acrylic walls. replace exhaust fanDetails
demo existing tub, valve and surrounding area. install new formed shower pan, new valve and new acrylic walls. replace exhaust fan | $7,500 |
| May 23, 2024 | Completed final sign-off Jul 2024 | 2001 Sacramento St | Norcal Remodeling Group Llc | unit #9: demo (e) tub, valve and surround. install new formed shower pan, new valve and new acrylic walls.Details
unit #9: demo (e) tub, valve and surround. install new formed shower pan, new valve and new acrylic walls. | $7,500 |
| Feb 21, 2024 | Completed final sign-off Apr 2024 | 877 Shotwell St | Norcal Remodeling Group Llc | demo existing tub, valve and surround. install new formed shower pan, new valve and new acrylic walls.Details
demo existing tub, valve and surround. install new formed shower pan, new valve and new acrylic walls. | $10,000 |
| Feb 15, 2024 | Completed final sign-off May 2024 | 1600 Webster St | Norcal Remodeling Group Llc | unit 402; demo existing tub, valve and surround. build new tile, shower base, install new valve and acrylic walls. install new exhaust fan light combo with built in humidity sensor.Details
unit 402; demo existing tub, valve and surround. build new tile, shower base, install new valve and acrylic walls. install new exhaust fan light combo with built in humidity sensor. | $7,500 |
| Jan 31, 2024 | Completed final sign-off Jul 2024 | 720 Gough St | Norcal Remodeling Group Llc | unit# 32: demo existing tub, valve and surround. install new formed shower pan, new valve, and new acrylic walls. replace existing exhaust fan.Details
unit# 32: demo existing tub, valve and surround. install new formed shower pan, new valve, and new acrylic walls. replace existing exhaust fan. | $10,000 |
| Nov 9, 2023 | Completed final sign-off Apr 2024 | 2780 19th Av | Norcal Remodeling Group Llc | unit 71: bathroom: demo existing tub valve and suround. install new formed shower pan, new valve and new acrylic wallsDetails
unit 71: bathroom: demo existing tub valve and suround. install new formed shower pan, new valve and new acrylic walls | $7,500 |
| Nov 1, 2023 | Completed final sign-off Dec 2023 | 5800 03rd St | Norcal Remodeling Group Llc | remove extg valve, tub, and surround. install new acrylic formed shower base, new valve and new acrylic wall surrounds.Details
remove extg valve, tub, and surround. install new acrylic formed shower base, new valve and new acrylic wall surrounds. | $7,500 |
| Oct 20, 2023 | Completed final sign-off Dec 2023 | 140 South Van Ness Av | Norcal Remodeling Group Llc | apt 829: remodel one bathroom: demo (e) tub, valve and surround. install new formed shower pan, new vavle and new acrylic walls.Details
apt 829: remodel one bathroom: demo (e) tub, valve and surround. install new formed shower pan, new vavle and new acrylic walls. | $10,000 |
| Oct 6, 2023 | Completed final sign-off Dec 2023 | 5008 Diamond Heights Bl | Norcal Remodeling Group Llc | demo existing tub, valve ad surround. install new formed shower pan, new valve and new acrylic walls.Details
demo existing tub, valve ad surround. install new formed shower pan, new valve and new acrylic walls. | $10,000 |
| Aug 15, 2023 | Completed final sign-off Jan 2024 | 95 Red Rock Wy | Norcal Remodeling Group Llc | demo(e) tub, valve, and surround: install (n) formed shower pan, valve and acrylic wallsDetails
demo(e) tub, valve, and surround: install (n) formed shower pan, valve and acrylic walls | $10,000 |
| Jul 24, 2023 | Completed final sign-off Sep 2023 | 843 South Van Ness Av | Norcal Remodeling Group Llc | bathroom remodel. replace bathtub: demo (e) tub, valve, surround. install (n) shower pan, valve, acrylic wall. no structural work. no framing modifications.Details
bathroom remodel. replace bathtub: demo (e) tub, valve, surround. install (n) shower pan, valve, acrylic wall. no structural work. no framing modifications. | $10,000 |
| Jun 29, 2023 | Completed final sign-off Aug 2023 | 160 Margaret Av | Norcal Remodeling Group Llc | replace bathtub. demo e tub, valve and surround. install new shower pan, valve, acrylic walls. no structural demoDetails
replace bathtub. demo e tub, valve and surround. install new shower pan, valve, acrylic walls. no structural demo | $5,000 |
| May 23, 2023 | Completed final sign-off Sep 2023 | 400 Beale St | Norcal Remodeling Group Llc | unit# 1412: (2) bathroom remodels. no change to layout.Details
unit# 1412: (2) bathroom remodels. no change to layout. | $25,000 |
| May 15, 2023 | Completed final sign-off Aug 2023 | 27 Edinburgh St | Norcal Remodeling Group Llc | one bathroom renovation. no change to layout. demo tub, install shower, valve and trim. replace flooring, vanity and lights.Details
one bathroom renovation. no change to layout. demo tub, install shower, valve and trim. replace flooring, vanity and lights. | $20,552 |
| Apr 25, 2023 | Completed final sign-off Jun 2023 | 290 Red Rock Wy | Norcal Remodeling Group Llc | unit b: remove/replace tubDetails
unit b: remove/replace tub | $10,000 |
| Mar 21, 2023 | Completed final sign-off Aug 2023 | 695 Monterey Bl | Norcal Remodeling Group Llc | bathroom remodel no change to footprint. remove (e) tub valve and walls install (n) formed acrylic tub, valve and trim, new acrylic walls, vanities/tops/faucets, toilet. (unit#203)Details
bathroom remodel no change to footprint. remove (e) tub valve and walls install (n) formed acrylic tub, valve and trim, new acrylic walls, vanities/tops/faucets, toilet. (unit#203) | $5,000 |
| Mar 21, 2023 | Completed final sign-off Jun 2023 | 945 Corbett Av | Norcal Remodeling Group Llc | 2 bathrooms remodel no change layoutDetails
2 bathrooms remodel no change layout | $7,500 |
| Mar 21, 2023 | Completed final sign-off Jun 2023 | 1451 47th Av | Norcal Remodeling Group Llc | one bathroom remodel: remove (e) tub and install (n) formed shower pan, valve, acrylic walls, toliet. replace (e) fan with (n) fanDetails
one bathroom remodel: remove (e) tub and install (n) formed shower pan, valve, acrylic walls, toliet. replace (e) fan with (n) fan | $7,500 |
| Feb 24, 2023 | Completed final sign-off May 2023 | 535 Eureka St | Norcal Remodeling Group Llc | unit 537 (lower unit): bathroom remodel in kind. no change to footprint. remove (e) tub, valve and install new formed bathtub, new valve, new acrylic walls. gfci upgrade.Details
unit 537 (lower unit): bathroom remodel in kind. no change to footprint. remove (e) tub, valve and install new formed bathtub, new valve, new acrylic walls. gfci upgrade. | $7,500 |
| Feb 13, 2023 | Completed final sign-off Mar 2023 | 80 Farview Ct | Norcal Remodeling Group Llc | bathroom remodel. install new acrylic shower base, fiberglass wall finish, wainscoating, new valve, new exhaust fan, new gfci, new toilet, vanity/top/faucet. medicine cabinet, tile floor. no moving walls.Details
bathroom remodel. install new acrylic shower base, fiberglass wall finish, wainscoating, new valve, new exhaust fan, new gfci, new toilet, vanity/top/faucet. medicine cabinet, tile floor. no moving walls. | $10,000 |
| Feb 8, 2023 | Never finaled issued Apr 2023, no final | 330 Mission Bay Blvd North | Norcal Remodeling Group Llc | bathroom remodel: no change to footprint. remove (e) tub/surround/valve and install (n) formed acrylic shower base, new valve, arcylic walls; replace existing exhaust fan with new fan/light with heater. gfci upgrade. provide accessiore 70b threshold. shower to comly w/1134a.6Details
bathroom remodel: no change to footprint. remove (e) tub/surround/valve and install (n) formed acrylic shower base, new valve, arcylic walls; replace existing exhaust fan with new fan/light with heater. gfci upgrade. provide accessiore 70b threshold. shower to comly w/1134a.6 | $5,000 |
| Feb 6, 2023 | Completed final sign-off Jun 2023 | 52 Sheridan St | Norcal Remodeling Group Llc | bathroom remodel: tile, valve, fan/light combo, rfidDetails
bathroom remodel: tile, valve, fan/light combo, rfid | $5,000 |
| Jan 11, 2023 | Completed final sign-off Mar 2025 | 135 Valencia St | Norcal Remodeling Group Llc | bathroom remodel: no change to footprint (in kind). remove (e) and install (n) tub ands urround: install new acrylic tub, acrylic walls with denshield backer material; install new customer supplied valve and customer supplied toilet. replace drainage connections. gfci upgradeDetails
bathroom remodel: no change to footprint (in kind). remove (e) and install (n) tub ands urround: install new acrylic tub, acrylic walls with denshield backer material; install new customer supplied valve and customer supplied toilet. replace drainage connections. gfci upgrade | $5,000 |
| Oct 5, 2022 | Completed final sign-off Jun 2023 | 821 Folsom St | Norcal Remodeling Group Llc | (2) bathroom remodel no layout change.Details
(2) bathroom remodel no layout change. | $13,750 |
| Aug 25, 2022 | Completed final sign-off Nov 2022 | 8100 Oceanview Tr | Norcal Remodeling Group Llc | (2) bathroom remodel - no change to layoutDetails
(2) bathroom remodel - no change to layout | $7,350 |
| Aug 25, 2022 | Completed final sign-off Oct 2022 | 763 36th Av | Norcal Remodeling Group Llc | bathroom remodel. no change to layout. tub to shower conversion.Details
bathroom remodel. no change to layout. tub to shower conversion. | $12,667 |
| Aug 23, 2022 | Never finaled issued Aug 2022, no final | 255 Bella Vista Wy | Norcal Remodeling Group Llc | bathroom remodel: no change to footprint. remove (e) and install (n) tub, shower base, wall board, wet walls, ceiling panels and fan. replace drainage connections.Details
bathroom remodel: no change to footprint. remove (e) and install (n) tub, shower base, wall board, wet walls, ceiling panels and fan. replace drainage connections. | $18,000 |
| Aug 23, 2022 | Completed final sign-off Jan 2024 | 672 Corbett Av | Norcal Remodeling Group Llc | unit b: bathroom remodel- layout change: move toilet and shower, gfci. install tankless water heater.Details
unit b: bathroom remodel- layout change: move toilet and shower, gfci. install tankless water heater. | $16,798 |
| Jun 29, 2022 | Completed final sign-off May 2023 | 1540 Ofarrell St | Norcal Remodeling Group Llc | unit #4: one bathroom remodel like for like, no footprint change remove + replace existing tub + wet walls.Details
unit #4: one bathroom remodel like for like, no footprint change remove + replace existing tub + wet walls. | $8,500 |
| Jun 24, 2022 | Never finaled issued Jun 2022, no final | 552 35th Av | Norcal Remodeling Group Llc | bathroom remodel: no change to footprint - like for like. remove existing tub and wet walls. install new shower base and wet walls.Details
bathroom remodel: no change to footprint - like for like. remove existing tub and wet walls. install new shower base and wet walls. | $8,000 |
| Jun 2, 2022 | Never finaled issued Jun 2022, no final | 160 Gardenside Dr | Norcal Remodeling Group Llc | bathroom remodel: no change to footprint - like for like. remove existing tub & wet walls install new tub & wet walls. remove existing trim & valve install new trim & valve.Details
bathroom remodel: no change to footprint - like for like. remove existing tub & wet walls install new tub & wet walls. remove existing trim & valve install new trim & valve. | $5,000 |
| Apr 19, 2022 | Never finaled issued Apr 2022, no final | 8 Richards Cr | Norcal Remodeling Group Llc | bathroom remodel: no change to footprint - like for like. remove existing tub and wet walls install new shower base and we walls install new valve.Details
bathroom remodel: no change to footprint - like for like. remove existing tub and wet walls install new shower base and we walls install new valve. | $2,500 |
| Mar 29, 2022 | Never finaled issued Mar 2022, no final | 346 Bright St | Norcal Remodeling Group Llc | bathroom renovation: tub to shower conversion.Details
bathroom renovation: tub to shower conversion. | $1,000 |
| Mar 15, 2022 | Never finaled issued Mar 2022, no final | 3524 Wawona St | Norcal Remodeling Group Llc | bathroom remodel: no change to footprint. tub to shower conversion. replace vanity. replace medicine cabinet. replace toilet.Details
bathroom remodel: no change to footprint. tub to shower conversion. replace vanity. replace medicine cabinet. replace toilet. | $1,000 |
| Mar 15, 2022 | Completed final sign-off Nov 2022 | 326 Rome St | Norcal Remodeling Group Llc | bathroom remodel: no change to footprint. tub to shower conversion (remove) tub (install) wet walls and valve. valve close off: existing plumbing in existing shower. replace subfloor and install lvt flooring. replace toilet.Details
bathroom remodel: no change to footprint. tub to shower conversion (remove) tub (install) wet walls and valve. valve close off: existing plumbing in existing shower. replace subfloor and install lvt flooring. replace toilet. | $1,000 |
| Dec 14, 2021 | Never finaled issued Dec 2021, no final | 1776 Sacramento St | Norcal Remodeling Group Llc | #303. remodeling existing bathroom: remodeling existing tub and wet walls, replace with new shower base and wet walls, trim & valve . remove existing vanity & light. install new vanity and light. remove and replace toilet. no changes in footprint. no efficacy lighitng.Details
#303. remodeling existing bathroom: remodeling existing tub and wet walls, replace with new shower base and wet walls, trim & valve . remove existing vanity & light. install new vanity and light. remove and replace toilet. no changes in footprint. no efficacy lighitng. | $8,000 |
| Mar 4, 2021 | Completed final sign-off Sep 2021 | 2225 23rd St | Norcal Remodeling Group Llc | basic kitchen remodel, all like for like. new cabinets, countertops, appliances, 2x 20amp circuit for outlets; 1x 40amp circuit for stove; install 11 x new canned lightsDetails
basic kitchen remodel, all like for like. new cabinets, countertops, appliances, 2x 20amp circuit for outlets; 1x 40amp circuit for stove; install 11 x new canned lights | $15,000 |
| Jul 16, 2020 | Completed final sign-off Aug 2020 | 139 Lake Merced Hill St South St | Norcal Remodeling Group Llc | bath remodel 45 sf shower to shower conversion, no change in footprint; new acrylic solid surface shower base/solid surface acrylic shower walls; new 5/8" densshield substrate behind shower walls; new fan/light in existing location; replacement vanity, like for like, same footprint;Details
bath remodel 45 sf shower to shower conversion, no change in footprint; new acrylic solid surface shower base/solid surface acrylic shower walls; new 5/8" densshield substrate behind shower walls; new fan/light in existing location; replacement vanity, like for like, same footprint; | $5,000 |
| Feb 19, 2020 | Completed final sign-off Mar 2020 | 1388 Gough St | Norcal Remodeling Group Llc | like for like bathtub and shower conversion. same footprint, solid surface shower base & solid surface acrylic walls, in wet area onlyDetails
like for like bathtub and shower conversion. same footprint, solid surface shower base & solid surface acrylic walls, in wet area only | $5,000 |
| Oct 16, 2019 | Never finaled issued Oct 2019, no final | 8200 Geary Bl | Norcal Remodeling Group Llc | replace 12 windows fiberglass, 4 sliding glass doors, stucco repair, replace flashing, paint, balcony waterproofing hotmop sheetrock repair from water damage all work in kindDetails
replace 12 windows fiberglass, 4 sliding glass doors, stucco repair, replace flashing, paint, balcony waterproofing hotmop sheetrock repair from water damage all work in kind | $60,000 |
| Jun 14, 2019 | Completed final sign-off Jul 2019 | 122 09th Av | Norcal Remodeling Group Llc | removing existing tub and replace with shower pan replace brand new valve and shower fixture. add new framing to existing one to fit the new shower base. install acrylic panel to wet wall area. install light fixture.Details
removing existing tub and replace with shower pan replace brand new valve and shower fixture. add new framing to existing one to fit the new shower base. install acrylic panel to wet wall area. install light fixture. | $25,000 |
| Jan 31, 2019 | Completed final sign-off May 2019 | 601 Van Ness Av | Norcal Remodeling Group Llc | unit 410: remodel bathroom, change valve & bath, upgrade toilet/vanity counter tops, replace ceiling fan & medicine cabinet; check electrical is up to code for fanDetails
unit 410: remodel bathroom, change valve & bath, upgrade toilet/vanity counter tops, replace ceiling fan & medicine cabinet; check electrical is up to code for fan | $30,000 |