25 permits since 2000 (architect on 25 permits): 15 completed, 1 in progress, 8 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 15, 2024 | In progress issued Oct 2024 | 6032 Geary Bl | Gettler-Ryan Inc | removal of waste oil tank and backfill of the tank holeDetails
removal of waste oil tank and backfill of the tank hole | $45,000 |
| Aug 13, 2024 | Completed final sign-off Dec 2024 | 3675 Geary Bl | Gettler-Ryan Inc | replace (6) dispensers with (6) new ovation.Details
replace (6) dispensers with (6) new ovation. | $28,000 |
| Nov 2, 2023 | Completed final sign-off May 2024 | 2950 San Jose Av | Gettler-Ryan Inc | site improvement showing currect ada 2022 cbc 11a path of traval, replacing gasoline dispensers & udc's. ref to 202306069345 (shared plans)Details
site improvement showing currect ada 2022 cbc 11a path of traval, replacing gasoline dispensers & udc's. ref to 202306069345 (shared plans) | $25,000 |
| Jun 6, 2023 | Completed final sign-off May 2024 | 2998 San Jose Av | Gettler-Ryan Inc | replace 4 (e) gasoline dispensers & uds's w/4 new. convert (e) premium gasoline underground storage tank to diesel. convert ust reg to ust premium. minor electrical permitDetails
replace 4 (e) gasoline dispensers & uds's w/4 new. convert (e) premium gasoline underground storage tank to diesel. convert ust reg to ust premium. minor electrical permit | $38,000 |
| Mar 21, 2023 | Completed final sign-off May 2023 | 1200 Geneva Av | Gettler-Ryan Inc | saw cut portion of the (e) tank top slab to replace lids, manways, spill bucket and drop tubes.Details
saw cut portion of the (e) tank top slab to replace lids, manways, spill bucket and drop tubes. | $28,000 |
| Aug 30, 2022 | Never finaled issued Aug 2022, no final | 1790 Lombard St | Gettler-Ryan Inc | site improvements with minor concrete flatwork provide a path of travel thru planter. provide new striping for new air/water location.Details
site improvements with minor concrete flatwork provide a path of travel thru planter. provide new striping for new air/water location. | $15,000 |
| May 26, 2022 | Never finaled issued May 2022, no final | 2190 Carroll Av | Gettler-Ryan Inc | saw cutting 7'x7' portion of the existing underground storage tanks slab to replace lids, manways, spill buckets and drop tubes.Details
saw cutting 7'x7' portion of the existing underground storage tanks slab to replace lids, manways, spill buckets and drop tubes. | $28,000 |
| Jul 18, 2018 | Completed final sign-off Mar 2019 | 1175 Fell St | Gettler-Ryan Inc | remove & replace 4 gas pump dispensers & associated minor electrical / mechanical equipment with identical look / styling. ** maher: n/a **Details
remove & replace 4 gas pump dispensers & associated minor electrical / mechanical equipment with identical look / styling. ** maher: n/a ** | $38,000 |
| Jul 18, 2018 | Completed final sign-off Oct 2018 | 6000 Geary Bl | Gettler-Ryan Inc | remove & replace 4 gas pump dispensers & associated electrical / mechanical equipment with identical look / styling. ** maher: n/a **Details
remove & replace 4 gas pump dispensers & associated electrical / mechanical equipment with identical look / styling. ** maher: n/a ** | $38,000 |
| Nov 30, 2017 | Never finaled issued Nov 2017, no final | 101 Bay Shore Bl | Gettler-Ryan Inc | remove & replace 4 dispensers. minor electrical. maher naDetails
remove & replace 4 dispensers. minor electrical. maher na | $38,000 |
| Sep 12, 2013 | Completed final sign-off Nov 2013 | 1790 Lombard St | Gettler-Ryan Inc | remove 4 dispensers & islands & replace with 4 new dispensers on grade, 4 new udc's. convert 1 gasoline tank to diesel.Details
remove 4 dispensers & islands & replace with 4 new dispensers on grade, 4 new udc's. convert 1 gasoline tank to diesel. | $45,000 |
| Sep 12, 2013 | Never finaled issued Sep 2013, no final | 1698 Fell St | Gettler-Ryan Inc | remove & replace 4 dispensers. remove & replace 4 udc's. convert 1 gasoline tank to diesel.Details
remove & replace 4 dispensers. remove & replace 4 udc's. convert 1 gasoline tank to diesel. | $40,000 |
| Apr 15, 2008 | Completed final sign-off Jul 2008 | 377 06th St | Paradiso Mechanical, Inc | excavate to remove underground storage tanks, remove 4 10,000 gallon storage tanks, backfill excavation with pea gravel, remove all process and vapor pipingDetails
excavate to remove underground storage tanks, remove 4 10,000 gallon storage tanks, backfill excavation with pea gravel, remove all process and vapor piping | $15,000 |
| Aug 3, 2007 | Never finaled issued Aug 2007, no final | 2198 Market St | Paradiso Mechanical, Inc | demolish gas station.Details
demolish gas station. | |
| Jun 20, 2007 | Completed final sign-off Oct 2007 | 800 Ulloa St | Able Maintenance Inc | removal of 3 existing dispensers, install 2 new dispensers. install clean air separator tank for evr phase ii vapor recovery. install new passport epos system for payment network.Details
removal of 3 existing dispensers, install 2 new dispensers. install clean air separator tank for evr phase ii vapor recovery. install new passport epos system for payment network. | $20,000 |
| Oct 24, 2006 | Never finaled issued Dec 2006, no final | 601 Montgomery St | Gettler-Ryan Inc | pull new coflox piping thru existing cases. no alteration 2 existing generator. no breaking of concrete.Details
pull new coflox piping thru existing cases. no alteration 2 existing generator. no breaking of concrete. | $2,500 |
| Oct 24, 2006 | Completed final sign-off Jan 2007 | 425 Market St | Gettler-Ryan Inc | pull new coflex piping thru existing cases. no alteration 2 existing generator. no breaking of concrete.Details
pull new coflex piping thru existing cases. no alteration 2 existing generator. no breaking of concrete. | $2,500 |
| May 19, 2005 | Completed final sign-off Jun 2005 | 400 Guerrero St | Fillner Construction Inc. | revision to approved pa# 2005/02/04/4846. permit# 1047364. revision to add underground petroleumDetails
revision to approved pa# 2005/02/04/4846. permit# 1047364. revision to add underground petroleum | $60,000 |
| Feb 3, 2005 | Never finaled issued Feb 2005, no final | 300 05th St | Wendt & Sons Dba Wendt Construction | repair (e)tank fills,(e)concrete tank slab as required.install new dispense containment.Details
repair (e)tank fills,(e)concrete tank slab as required.install new dispense containment. | $60,000 |
| Jan 28, 2005 | Completed final sign-off Apr 2005 | 2380 San Bruno Av | Gettler-Ryan Inc | repair (e)tank spill buckets,replace (e)concrete tank slab as required,install new dispenserDetails
repair (e)tank spill buckets,replace (e)concrete tank slab as required,install new dispenser | $60,000 |
| Jan 28, 2005 | Never finaled issued Jan 2005, no final | 2890 03rd St | repair existing tank fills replace concrete tank slab as required install new dispenser containmentDetails
repair existing tank fills replace concrete tank slab as required install new dispenser containment | $60,000 | |
| Nov 16, 2004 | Completed final sign-off Dec 2004 | 3550 Mission St | Gettler-Ryan Inc | replace gasoline dispensers replace spill buckers on underground storage tanks and repair existingDetails
replace gasoline dispensers replace spill buckers on underground storage tanks and repair existing | $60,000 |
| Nov 15, 2004 | Completed final sign-off Jan 2005 | 551 03rd St | Gettler-Ryan Inc | revision to appl#200410227552 for underground product piping addition.Details
revision to appl#200410227552 for underground product piping addition. | $60,000 |
| Nov 10, 2004 | Expired or cancelled cancelled Mar 2007 | 1860 Van Ness Av | Gettler-Ryan Inc | demolish canopy which cover gasoline islands.Details
demolish canopy which cover gasoline islands. | |
| Oct 22, 2004 | Completed final sign-off Jan 2005 | 551 03rd St | Gettler-Ryan Inc | replace (e)gasoline dispensers,repair (e)tank slab,repair underground storage tanksDetails
replace (e)gasoline dispensers,repair (e)tank slab,repair underground storage tanks | $60,000 |