Jeffery A. Rabbitt
- Listed as
- architect
- Firm
- A O
- Based in
- Orange
- On San Francisco permits
- Dec 2021 to Feb 2023
3 permits since 2000 (architect on 3 permits): 2 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 13, 2023 | Completed final sign-off Sep 2024 | 120 Stockton St | Calasia Construction Inc | suite #856. revision to pa# 202202168080. reduction in scope from originally approved ti permit. affected trades include ameps. no change in building square footage or height. no site work on this permit.Details
suite #856. revision to pa# 202202168080. reduction in scope from originally approved ti permit. affected trades include ameps. no change in building square footage or height. no site work on this permit. | |
| Feb 16, 2022 | Completed final sign-off Sep 2024 | 120 Stockton St | Sunshine Comm'l Constr. Inc., Calasia Construction Inc | interior tenant suite 856 fit out & change of occupancy for(n) restaurant.t.i. improvement within an existing 8 stories shell bldg,scope to include:interior partitions,kitchen equipment,retrooms,mech,elec & plu system improvements as required for a full t.i. build out.no site work in this scope.Details
interior tenant suite 856 fit out & change of occupancy for(n) restaurant.t.i. improvement within an existing 8 stories shell bldg,scope to include:interior partitions,kitchen equipment,retrooms,mech,elec & plu system improvements as required for a full t.i. build out.no site work in this scope. | $6,250,000 |
| Dec 2, 2021 | Expired or cancelled cancelled Jan 2026 | 120 Stockton St | suite 856: upgrades include structural reinforcement for future roof opening, future skylight, future landscap aeras and future boulder fixtures.Details
suite 856: upgrades include structural reinforcement for future roof opening, future skylight, future landscap aeras and future boulder fixtures. | $175,000 |